Permit #2008040074
Permit Details
Status: COED
| Parcel Id: 14-11-30-0000-01010-0000 |
| COMMERCIAL SQUARE FOOTAGE: 8643 sqft |
| Total Square Footage: 8643 sqft |
| Block: 01010 |
| Subdivision: 2140 - P.C. PARKWAY PLAZA |
| Job Phone: (407)862-6966 |
| Location Address: 9 CORPORATE DR |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 05/02/2008 |
| NOC: RECORDED |
| Applicant name: JAMES RUSSELL SUDDETH |
| Owner: CITY OF PALM COAST |
|
Address 2 COMMERCE BLVD PALM COAST, FL 32164 |
| Lot: 0000 |
| Contracted Stated Job Value: ¤1,700,000.00 |
| Job Description: FIRE STATION # 21 |
| Type: CN |
Contractor
J RAYMOND CONSTRUCTION CORP.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
465 WEST WARREN AVE LONGWOOD, FL 32750 |
CGC048800 (Exp: 08/31/2012) | (407)862-6966 | (407) 862-1250 |
Sub Contractors
THOMAS ALAN GOSLIN III
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
150 HOPE STREET LONGWOOD, FL 32750 |
SUITE 1016 LONGWOOD, FL 32750 |
CAC057606 (Exp: 09/30/2010) | (407)265-0777 | (407)265-0770 |
GARY S WELBORN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1709 North Nova Road Holly Hill, FL 32117 |
CFC037140 (Exp: 08/31/2018) | (386) 257-1172 | (386)252-5979 |
JOSE ANTONIO PILLO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
35 E. DIAMOND DRIVE PALM COAST, FL 32164 |
CCC1326043 (Exp: 08/31/2010) | (386)586-4969 | (386)239-9794 |
JEFFERY T SANDERS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2759 ST. JOHNS BLUFF ROAD SOUTH JACKSONVILLE, FL 32246 |
EC0000938 (Exp: 08/31/2012) | (904)645-0026 | (904)645-6186 |
DAVID CASH
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
45 SOUTH DIXIE HIGHWAY ST. AUGUSTINE, FL 32084 |
01613 (Exp: 08/31/2014) | (386)437-3433 | 904-829-1844 |
Inspection History
| Type | Request Date | Result | Inspector |
| FOUNDATION SURVEY APPROVED BY ZONING | 10/01/2008 | APPROVED | DRAMIREZ |
| Note: Foundation survey will be submitted as part of Carl Cote punchlist. | |||
| PLUMBING FINAL | 10/01/2008 | APPROVED - AS NOTED | PGALLMANN |
| Note: FINAL APPROVAL GRANTED, HOWEVER, PUNCH LIST AUTHORED BY CARL KOTE MUST BE COMPLETE WITHIN 30 DAYS. | |||
| H.V.A.C. FINAL | 10/01/2008 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION called by contractor | |||
| ELECTRICAL FINAL | 10/01/2008 | APPROVED - AS NOTED | LHITES |
| Note: THIS IS A REINSPECTION called by contractor Inspection Resulted at 10/1/2008 3:06:28 PM CODE ISSUES WITH LOCATION OF DISCONNECT AND SWITCHES NEXT TO EMERGENCY WASH ARE BEING CORRECTED BY MOVING THE WASH. APPROVED AS NOTED THIS DOES NOT INCLUDE PUNCH LIST ITEMS THAT ARE STILL OUTSTANDING | |||
| GAS FINAL | 10/01/2008 | APPROVED | PGALLMANN |
| Note: called by contractor Inspection Resulted at 10/1/2008 3:59:02 PM | |||
| TRAFFIC ENGINEER | 10/01/2008 | APPROVED | JCOLASANTI |
| Note: called by contractor//ok per JB | |||
| COMMERCIAL BUILDING FINAL | 10/01/2008 | FINAL APPROVED | CMINI |
| Note: this does not include punch list items | |||
| FIRE FINAL | 10/01/2008 | APPROVED | JPATTEE |
| Note: called bycontractor | |||
| LANDSCAPE FINAL | 09/30/2008 | APPROVED | WBUTLER |
| Note: by contractor Bill is out there today | |||
| UTILITY COMPANY FINAL | 09/26/2008 | APPROVED | KKING |
| ELECTRICAL FINAL | 09/26/2008 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 9/26/2008 3:40:43 PM NOT READY. OPEN BOXES WITH LOOSE WIRES. IMPROPER GROUNDING METHODS BEING USED. NEED STRAPPING ON EMT . STOPPED INSPECTION. NEVER LEFT PARKING BAY. | |||
| PLUMBING FINAL | 09/26/2008 | PARTIALLY APPROVED | PGALLMANN |
| Note: Inspection Resulted at 9/26/2008 3:58:31 PM HOT WATER IS NEEDED TO COMPLETE FINAL. | |||
| H.V.A.C. FINAL | 09/25/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: Inspection Resulted at 9/25/2008 1:02:54 PM NEED TO GET UV RATING ON THERMOSTAT WIRE...FOAM IN CHASE LINE...TEST AND BALANCE REPORT IN OFFICES HAND. | |||
| UTILITY COMMERCIAL FINAL | 09/25/2008 | APPROVED | KKING |
| ENGINEERING FINAL | 09/25/2008 | APPROVED | JCOLASANTI |
| Note: per JB | |||
| H.V.A.C. ROUGH | 09/24/2008 | CANCELLED BY INSPECTOR | JMCGOWEN |
| Note: Inspection Resulted at 9/24/2008 11:30:53 AM NOT A CODE INSPECTION. | |||
| ABOVE CEILING | 09/22/2008 | APPROVED | LHITES |
| H.V.A.C. ROUGH | 09/16/2008 | APPROVED - AS NOTED | JMCGOWEN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/16/2008 2:59:48 PM ATTACHED TO UNITS | |||
| H.V.A.C. ROUGH | 09/10/2008 | PARTIALLY APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/10/2008 10:14:38 AM GENERATOR ROOM AND KITCHEN. | |||
| COMMERCIAL HOOD & DUCT LIGHT TEST INSPECTION | 09/03/2008 | APPROVED | BMEYERS |
| Note: This inspection needs to go on the other permit when ready. | |||
| FIREWALL INSPECTION | 08/29/2008 | APPROVED - AS NOTED | JPATTEE |
| H.V.A.C. ROUGH | 08/29/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/29/2008 3:33:32 PM NEED TO INSTALL FIRE DAMPER ACCESS AT END ROOM...ROOM HIGHLIGHTED OK TO HARD CEILING... | |||
| COMMERCIAL POWER INSPECTION | 08/28/2008 | APPROVED | LHITES |
| H.V.A.C. ROUGH | 08/27/2008 | PARTIALLY APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/27/2008 12:58:10 PM PARTIALL HIGHLIGHTED AND DATED ON PLAN.. | |||
| ABOVE CEILING | 08/27/2008 | APPROVED | LHITES |
| Note: Inspection Resulted at 8/27/2008 3:12:30 PM ELECTRIC FOR ABOVE CEILING IS OK | |||
| SECOND ROUGH PLUMBING INSPECTION | 08/27/2008 | APPROVED | PGALLMANN |
| Note: Inspection Resulted at 8/27/2008 3:33:43 PM GAS PIPING FINAL ROUGH INSPECTION. | |||
| H.V.A.C. ROUGH | 08/19/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/19/2008 12:55:01 PM NOT READY,BOOTS NEED TO BE IN FOR THIS INSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/12/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: interior walls o.k to insulate | |||
| ROOF IN PROGRESS | 08/12/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: Roof over apparatus bay o.k to shingle.Lower roofs still need fix for dry-in | |||
| 2ND ROUGH ELECTRICAL | 08/06/2008 | PARTIALLY APPROVED | LHITES |
| Note: walls only- living area | |||
| SECOND ROUGH PLUMBING INSPECTION | 08/05/2008 | APPROVED | PGALLMANN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/02/2008 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION PARTIAL REQUEST CHARLIE SOUTH SIDE APPARATUS BAY INSUATION BOARD.. | |||
| H.V.A.C. ROUGH | 07/31/2008 | PARTIALLY APPROVED | JMCGOWEN |
| Note: PARTIAL ON SUPPLIES READY FOR INSULATION IN STORAGE ROOMS. | |||
| H.V.A.C. ROUGH | 07/29/2008 | APPROVED - AS NOTED | JMCGOWEN |
| Note: revision needed for duct layout change on east side of building. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 07/23/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: Metal roof deck installed and fastened | |||
| UNDERGROUND ELECTRICAL | 07/23/2008 | PARTIALLY APPROVED | LHITES |
| Note: UNDERGROUND IN BAY AREA | |||
| LINTEL | 07/09/2008 | APPROVED | DROCKWELL |
| Note: Final lift-Main building complete | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 06/18/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: Equipment rooms (5) floors poured/South rake beam poured | |||
| UNDERGROUND INSPECTION | 06/18/2008 | Disapproved -FEE REQUIRED | JPATTEE |
| Note: Contractor (Jeff) called to schedule this inspection for 6/18/08 What underground, for what? | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 06/16/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: Generator pad-independent of floor slab | |||
| LINTEL | 06/16/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: Rake beam 1st lift above bay doors. | |||
| LINTEL | 06/12/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: Top-out at apparatus bay and west rake beams o.K | |||
| LINTEL | 06/05/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: Arches over bay openings ok to pour(2) | |||
| LINTEL | 06/02/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: Top out west wall 4th lift bay walls arches at entry soth west side | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 06/02/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: Living area and office's poured | |||
| FIRST ROUGH PLUMBING INSPECTION | 05/20/2008 | PARTIALLY APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION THIS WAS TO COMPLETE ALL UNDER GROUND SANITARY AND GREASE WASTE PIPE, 2'' WATER MAIN NOT ROUGHED IN, WATING ON CONFRIMATION AS TO COPPER OR CPVC, WILL BE INSPECTED PRIOR TO SLAB POUR........ MARK | |||
| LINTEL | 05/20/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: South / west wall up to bond beam.North wall up by wed aftnoon.Walls at bond beam o.k for pour | |||
| LINTEL | 05/16/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: 1ST lift exterior walls south of apparatus bay O.K for pour | |||
| FIRST ROUGH PLUMBING INSPECTION | 05/16/2008 | PARTIALLY APPROVED | JGIBSON |
| Note: THIS INSPECTION WAS FOR SANITARY LINES ONLY UPON INSPECTION 2'' PVC PIPE HAD A CRACK IN IT ON WEST SIDE OF BUILDING PLUMBING CONTRACTOR REPAIRED SAID PIPE AND WILL RE-TEST MONDAY MORNING.....MARK |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/30/2008 | 09/30/2008 |
| Note: Released By: JMCGOWEN Revision test and balance report | |||
| ELEC | COMPLETE | 09/05/2008 | 09/05/2008 |
| Note: Released By: SKNOPF Approved for Release. REVISION: Revised Panel MDP and Panel L circuits to coincide with Site permit circuits for Site Lighting. | |||
| ELEC | COMPLETE | 04/08/2008 | 04/08/2008 |
| Note: Released By: SKNOPF Approved for Release | |||
| FI1 | COMPLETE | 04/08/2008 | 04/08/2008 |
| Note: Released By: JPATTEE 1) plans for automatic fire sprinkler system will be required for approval. 2) plans for fire alarm system will be required for approval. ( check co detectors) 3) plans for hood, exhaust and fire suppression system will be required for approval. 4) fire dampers for ducts exceeding 100 sq inches in rated walls, X 3 (FRED) | |||
| MECH | COMPLETE | 04/08/2008 | 04/08/2008 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 04/08/2008 | 04/08/2008 |
| Note: Released By: FREODICA | |||
| ZON | COMPLETE | 04/04/2008 | 04/07/2008 |
| Note: Released By: ECOYNE | |||
| BLD | COMPLETE | 04/08/2008 | |
| Note: Released By: BBEMBRY Held By: JJOSEPH Administration Hold completed this review - made a PHOLD instead of a plan review hold. Must submit: Water Receipt Energy calculations - must be signed by plans examiner prior to issuance Subcontractor must be identified / Regsitered with the city. | |||
| UD1 | CANCEL | 04/25/2008 | |
| Note: not required per Chris Johnson |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/01/2008 |
| REINSPECTION FEE | ¤40.00 | 10/01/2008 |
| REINSPECTION FEE | ¤40.00 | 10/01/2008 |
| REINSPECTION FEE | ¤40.00 | 10/01/2008 |
| REINSPECTION FEE | ¤40.00 | 10/01/2008 |
| REVISION | ¤40.00 | 10/01/2008 |
| REVISION | ¤40.00 | 10/01/2008 |
| SPECIAL INSPECTIONS | ¤200.00 | 08/01/2008 |
| ADMIN FEE | ¤20.00 | 05/02/2008 |
| BUILDING CODE ADMIN FUND | ¤43.22 | 05/02/2008 |
| ELECTRIC FEE | ¤1,050.00 | 05/02/2008 |
| FIRE PLANS REVIEW | ¤86.43 | 05/02/2008 |
| MECHANICAL FEE | ¤1,050.00 | 05/02/2008 |
| PERMIT FEE | ¤9,350.00 | 05/02/2008 |
| PLAN CHECK FEE | ¤1,955.00 | 05/02/2008 |
| PLUMBING FEE | ¤1,050.00 | 05/02/2008 |
| RADON FEE | ¤43.22 | 05/02/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,127.87 |