I want to search for...
Permit #2008040174
Permit Details
Status: COED
| Parcel Id: 31-12-31-5371-00000-0040 |
| GARAGE: 2802 sqft |
| Total Square Footage: 2802 sqft |
| Block: 00000 |
| Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION |
| Job Phone: 386-586-0781 |
| Location Address: 525 SHADY OAKS DR |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 07/10/2008 |
| NOC: RECORDED |
| Applicant name: JAMES G PYLE |
| Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE |
|
Address #307 PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤115,433.00 |
| Job Description: GARAGE TYPE 4 (1 FLOOR, FOUR BAY GARAGE) SP-MAJ-07-06 FOR "INTEGRA WOODS" |
| Type: CN |
Contractor
LANDSOUTH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1680 THE GREENS WAY JACKSONVILLE , FL 32277 |
CBC035104 (Exp: 08/31/2010) | 386-586-0781 | 386-586-2805 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
NINO JOE PARRALES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6824 PHILLIPS PKWY DR. S JACKSONVILLE , FL 32256 |
CAC057164 (Exp: 08/31/2010) | (904)346-1774 | (904)346-4788 |
STEPHEN JOHN CHASTAIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1923 TAMPA EAST BLVD TAMPA, FL 33619 |
CFC024520 (Exp: 08/31/2012) | (813)246-5341 | (813)246-5345 |
FRED M POMAR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1025 6TH STREET DAYTONA BEACH, FL 32117 |
CCC1328140 (Exp: 08/31/2010) | (386)255-6113 | (386)254-8816 |
Inspection History
| Type | Request Date | Result | Inspector |
| FIRE FINAL | 05/21/2009 | APPROVED | JPATTEE |
| ENGINEERING FINAL | 05/20/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| COMMERCIAL BUILDING FINAL | 05/20/2009 | APPROVED - AS NOTED | JHINDMAN |
| Note: cannot co until fire final has passed. | |||
| TRAFFIC ENGINEER | 05/14/2009 | FINAL APPROVED | MCOBB |
| ENGINEERING FINAL | 05/14/2009 | APPROVED | MCOBB |
| UTILITY COMMERCIAL FINAL | 05/13/2009 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 05/13/2009 | APPROVED | KKING |
| LANDSCAPE FINAL | 05/13/2009 | APPROVED | WBUTLER |
| ELECTRICAL FINAL | 05/13/2009 | APPROVED | RMARVEL |
| FRAMING | 01/09/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: Inspection Requested at 1/8/2009 4:40:19 PM FINAL FRAME | |||
| ROOF IN PROGRESS | 01/09/2009 | APPROVED | JHINDMAN |
| FRAMING | 01/08/2009 | APPROVED | JHINDMAN |
| FOUNDATION SURVEY APPROVED BY ZONING | 12/31/2008 | APPROVED | JGONZALEZ |
| FRAMING | 12/16/2008 | CANCELLED BY APPLICANT | AIRS WEB |
| 2ND ROUGH ELECTRICAL | 12/12/2008 | APPROVED | RMARVEL |
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/19/2008 | APPROVED | JHINDMAN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/19/2008 | APPROVED | JHINDMAN |
| TIE DOWN | 11/12/2008 | APPROVED | BBEMBRY |
| MONOLITHIC SLAB INSPECTION/SLAB | 10/29/2008 | APPROVED | JHINDMAN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 05/20/2009 | 06/29/2009 |
| Note: Released By: JMCGOWEN | |||
| ELEC | HOLD | 01/30/2009 | 01/30/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| PLLA | COMPLETE | 01/21/2009 | 01/22/2009 |
| Note: Released By: WBUTLER | |||
| ELEC | HOLD | 01/21/2009 | 01/21/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040174 (Integra Woods Garage Type 4 @ 525 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| BLD | COMPLETE | 09/22/2008 | 09/22/2008 |
| Note: Released By: JMONTARULI Released by: J Joseph Anchor placement plans that show anchor spacing for all bearing walls | |||
| ELEC | COMPLETE | 07/02/2008 | 07/02/2008 |
| Note: Released By: SKNOPF Approved for Release. | |||
| BLD | COMPLETE | 07/02/2008 | 07/03/2008 |
| Note: Released By: FREODICA Rev.- Arch. and electrical sheets. | |||
| ELEC | COMPLETE | 04/10/2008 | 04/10/2008 |
| Note: Released By: JMCGOWEN | |||
| FI1 | COMPLETE | 04/10/2008 | 04/29/2008 |
| Note: Released By: JPATTEE | |||
| BLD | COMPLETE | 04/09/2008 | 04/10/2008 |
| Note: Released By: JMCGOWEN |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 07/10/2008 |
| BUILDING CODE ADMIN FUND | ¤14.01 | 07/10/2008 |
| ELECTRIC FEE | ¤99.60 | 07/10/2008 |
| FIRE COMM IMPACT FEE 4/1/07 | ¤143.74 | 07/10/2008 |
| FIRE PLANS REVIEW | ¤28.02 | 07/10/2008 |
| MECHANICAL FEE | ¤99.60 | 07/10/2008 |
| PERMIT FEE | ¤638.00 | 07/10/2008 |
| PLAN CHECK FEE | ¤133.40 | 07/10/2008 |
| PLUMBING FEE | ¤99.60 | 07/10/2008 |
| RADON FEE | ¤14.01 | 07/10/2008 |
| REVISION | ¤40.00 | 07/10/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,329.98 |