Permit #2008040182
Permit Details
Status: COED
| Parcel Id: 31-12-31-5371-00000-0040 |
| CONDITIONED SPACE: 1398 sqft |
| GARAGE: 1357 sqft |
| OPENED PORCH (WITH ROOF) : 114 sqft |
| OPENED PORCH (WITH ROOF) : 372 sqft |
| Total Square Footage: 3241 sqft |
| Block: 00000 |
| Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION |
| Job Phone: 386-586-2806 |
| Location Address: 225 SHADY OAKS DR |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 07/22/2008 |
| NOC: RECORDED |
| Applicant name: JAMES G PYLE |
| Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE |
|
Address #307 PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤133,518.00 |
| Job Description: BUILDING 2- TYPE 3B (2 FLOORS, 2 APT. UNITS) SP-MAJ-07-06 FOR "INTEGRA WOODS" |
| Type: CN |
Contractor
LANDSOUTH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1680 THE GREENS WAY JACKSONVILLE , FL 32277 |
CBC035104 (Exp: 08/31/2010) | 386-586-0781 | 386-586-2805 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
NINO JOE PARRALES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6824 PHILLIPS PKWY DR. S JACKSONVILLE , FL 32256 |
CAC057164 (Exp: 08/31/2010) | (904)346-1774 | (904)346-4788 |
STEPHEN JOHN CHASTAIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1923 TAMPA EAST BLVD TAMPA, FL 33619 |
CFC024520 (Exp: 08/31/2012) | (813)246-5341 | (813)246-5345 |
FRED M POMAR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1025 6TH STREET DAYTONA BEACH, FL 32117 |
CCC1328140 (Exp: 08/31/2010) | (386)255-6113 | (386)254-8816 |
Inspection History
| Type | Request Date | Result | Inspector |
| TRAFFIC ENGINEER | 04/03/2009 | APPROVED | MCOBB |
| LANDSCAPE FINAL | 04/03/2009 | FINAL APPROVED | WBUTLER |
| COMMERCIAL BUILDING FINAL | 03/31/2009 | FINAL APPROVED | RMARVEL |
| H.V.A.C. FINAL | 03/26/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ENGINEERING FINAL | 03/03/2009 | APPROVED | MCOBB |
| UTILITY COMPANY FINAL | 03/03/2009 | APPROVED | KKING |
| FIRE FINAL | 03/02/2009 | APPROVED | JPATTEE |
| UTILITY COMMERCIAL FINAL | 03/02/2009 | APPROVED | KKING |
| H.V.A.C. FINAL | 02/27/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 2/27/2009 3:23:41 PM AHU AND ACU UNITS DO NOT MATCH PER PLANS. | |||
| ELECTRICAL FINAL | 02/26/2009 | APPROVED | LHITES |
| PLUMBING FINAL | 02/20/2009 | APPROVED | JHINDMAN |
| UNDERGROUND ELECTRICAL | 01/23/2009 | APPROVED | RMARVEL |
| Note: Inspection Requested at 1/22/2009 4:23:39 PM CONDUIT - STREET LIGHTING | |||
| COMMERCIAL POWER INSPECTION | 01/20/2009 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/20/2009 2:13:05 PM TRI CITY | |||
| COMMERCIAL POWER INSPECTION | 01/16/2009 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 1/16/2009 3:42:49 PM BOXE AND SECURE LOOSE WIRES. | |||
| INSULATION INSPECTION | 11/17/2008 | APPROVED | JHINDMAN |
| Note: requested by Robyn | |||
| FIREWALL INSPECTION | 11/14/2008 | APPROVED | JPATTEE |
| FRAMING | 11/13/2008 | APPROVED | JHINDMAN |
| TIE DOWN | 11/12/2008 | APPROVED | BBEMBRY |
| LATH /BRICK FLASHING | 11/10/2008 | APPROVED | JHINDMAN |
| SECOND ROUGH PLUMBING INSPECTION | 11/07/2008 | APPROVED | JHINDMAN |
| LATH /BRICK FLASHING | 11/06/2008 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: Inspection Resulted at 11/6/2008 3:13:01 PM BY JOHN | |||
| H.V.A.C. ROUGH | 11/06/2008 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. ROUGH | 11/05/2008 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. ROUGH | 10/30/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/30/2008 3:27:21 PM OVER NOTCHED STUDS IN BEARING WALL. | |||
| 2ND ROUGH ELECTRICAL | 10/23/2008 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| 2ND ROUGH ELECTRICAL | 10/21/2008 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/21/2008 2:49:39 PM RECHECK WALL SPACING THROUGH OUT ROOMS INCLUDING KITCHENS. | |||
| H.V.A.C. ROUGH | 10/16/2008 | CANCELLED BY APPLICANT | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. ROUGH | 10/13/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: Inspection Resulted at 10/13/2008 1:24:13 PM NEED PASS THRU PER PLAN..OVERNOTCHED ON BEARING STUDS. | |||
| 2ND ROUGH ELECTRICAL | 10/13/2008 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 10/13/2008 2:37:54 PM NOT READY AT TIME OF INSPECTION. MAKE UP ALL WIRES EXCEPT WHERE NOTED TO ELECTRICIAN FOR BRICK WORK. INNER SPRINGS OF WIRE NUTS ARE BEING TWISTED RIGHT OUT OF ITS HOUSING. NEED RECEPTACLES IN WALLS WHERE 2FT. OR MORE. PROPERLY TORQUE SERVICE FEEDERS AT PANELS. MARK ALL WHITE CONDUCTORS BEING USED AS HOT CONDUCTORS AT THIS TIME. | |||
| SECOND ROUGH PLUMBING INSPECTION | 10/10/2008 | APPROVED | JMCGOWEN |
| FOUNDATION SURVEY APPROVED BY ZONING | 10/10/2008 | APPROVED | DRAMIREZ |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/06/2008 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ROOF IN PROGRESS | 10/06/2008 | APPROVED | JHINDMAN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/26/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 9/26/2008 2:20:45 PM NEED SUPPORT AND STRAPS ON VALLEYS, OK TO DRY IN | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 09/23/2008 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB INSPECTION/SLAB | 07/30/2008 | APPROVED - AS NOTED | CMINI |
| Note: GARAGES.. | |||
| FIRST ROUGH PLUMBING INSPECTION | 07/24/2008 | APPROVED | PGALLMANN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 03/25/2009 | 03/27/2009 |
| Note: Released By: SKNOPF Approved for Release. revised panel schedule/site lighting circuit schedule | |||
| MECH | COMPLETE | 03/25/2009 | 03/27/2009 |
| Note: Released By: FREODICA Revision: Air handler tonage changed (Rev. 12, dated 2-23-09.) | |||
| ELEC | COMPLETE | 02/26/2009 | 02/26/2009 |
| Note: Released By: JMCGOWEN site lighting | |||
| BLD | COMPLETE | 02/17/2009 | 02/17/2009 |
| Note: Released By: JMCGOWEN field truss repairs | |||
| ELEC | HOLD | 01/30/2009 | 01/30/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| MECH | COMPLETE | 01/27/2009 | 01/29/2009 |
| Note: Released By: FREODICA Revision: Specs for dryers in A3 units. | |||
| BLD | COMPLETE | 01/27/2009 | 01/28/2009 |
| Note: Released By: JJOSEPH drywall chase construction w5/8" drywall on adjacent ceiling and wall | |||
| BLD | COMPLETE | 01/26/2009 | 01/26/2009 |
| Note: Released By: JJOSEPH screen enclosure submittals and loction | |||
| ELEC | HOLD | 01/21/2009 | 01/21/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040182 (Integra Woods Bldg 2 Type 3B @ 225 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| PLLA | COMPLETE | 01/21/2009 | 01/22/2009 |
| Note: Released By: WBUTLER | |||
| MECH | HOLD | 12/12/2008 | 01/21/2009 |
| Note: Held By: JMCGOWEN GE appliance product spec submittals provide more information on driers ,model numbers and duct distance. | |||
| PLUM | COMPLETE | 12/08/2008 | 12/08/2008 |
| Note: Released By: FREODICA Revision: Plumbing revision 7 dated 11-26-08. | |||
| ZON | CANCEL | 11/19/2008 | |
| BLD | CANCEL | 11/18/2008 | 01/21/2009 |
| Note: REVISION ELEVATION OF SLAB | |||
| BLD | COMPLETE | 11/06/2008 | 11/06/2008 |
| Note: Released By: JMCGOWEN revision for trusses | |||
| MECH | COMPLETE | 10/23/2008 | 10/23/2008 |
| Note: Released By: FREODICA Revision: Unit A3- HVAC Plan Detail 2. | |||
| PLUM | HOLD | 10/23/2008 | 10/23/2008 |
| Note: Held By: JMCGOWEN provide stamped plumbing revisions as per F.B.C. 105.3.1.2 | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION Roofing submittals | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION code compliant Hardware | |||
| BLD | COMPLETE | 10/17/2008 | 10/24/2008 |
| Note: Released By: JJOSEPH Revision Third floor: Removal of columns, cap and flashing details cabinet change/shelving change | |||
| BLD | COMPLETE | 09/22/2008 | 09/22/2008 |
| Note: Released By: JMONTARULI Released by: J Joseph Anchor placement plans that show anchor spacing for all bearing walls | |||
| BLD | COMPLETE | 09/15/2008 | 09/22/2008 |
| Note: Released By: JJOSEPH Anchor placement plans that show anchor spacing for all bearing walls REVISION | |||
| FI1 | COMPLETE | 07/02/2008 | 07/11/2008 |
| Note: Released By: JPATTEE | |||
| ELEC | COMPLETE | 04/10/2008 | 04/10/2008 |
| Note: Released By: SKNOPF Approved for Release. | |||
| FI1 | HOLD | 04/10/2008 | 04/15/2008 |
| Note: Held By: JPATTEE 1) Plans do not provide design criteria for automatic fire sprinkler system(s) 2) Sheet E4.02 (2) does not indicate location of smoke detectors. 3) Unable to locate detail for the rated garage wall and rated floor ceiling. Ok JDP | |||
| MECH | COMPLETE | 04/10/2008 | 04/10/2008 |
| Note: Released By: JJOSEPH | |||
| PLUM | COMPLETE | 04/10/2008 | 04/10/2008 |
| Note: Released By: JJOSEPH | |||
| BLD | COMPLETE | 04/09/2008 | 04/10/2008 |
| Note: Released By: JJOSEPH |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REINSPECTION FEE | ¤40.00 | 01/27/2009 |
| REINSPECTION FEE | ¤40.00 | 01/15/2009 |
| REINSPECTION FEE | ¤40.00 | 01/05/2009 |
| REINSPECTION FEE | ¤40.00 | 12/23/2008 |
| REINSPECTION FEE | ¤40.00 | 10/28/2008 |
| REINSPECTION FEE | ¤40.00 | 10/21/2008 |
| REVISION | ¤40.00 | 09/26/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤1,862.00 | 07/22/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤4,452.70 | 07/22/2008 |
| RADON FEE | ¤16.21 | 07/22/2008 |
| PLAN CHECK FEE | ¤230.00 | 07/22/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤2,459.20 | 07/22/2008 |
| PLUMBING FEE | ¤150.00 | 07/22/2008 |
| BUILDING CODE ADMIN FUND | ¤16.21 | 07/22/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤380.58 | 07/22/2008 |
| ELECTRIC FEE | ¤150.00 | 07/22/2008 |
| MECHANICAL FEE | ¤150.00 | 07/22/2008 |
| PERMIT FEE | ¤1,120.00 | 07/22/2008 |
| PERMIT FEE | ¤1,120.00 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤2,459.20 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | (¤2,459.20) | 07/18/2008 |
| PERMIT FEE | (¤1,120.00) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | (¤380.58) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤380.58 | 07/18/2008 |
| MECHANICAL FEE | ¤150.00 | 07/18/2008 |
| MECHANICAL FEE | (¤150.00) | 07/18/2008 |
| BUILDING CODE ADMIN FUND | ¤16.21 | 07/18/2008 |
| ELECTRIC FEE | ¤150.00 | 07/18/2008 |
| ELECTRIC FEE | (¤150.00) | 07/18/2008 |
| RADON FEE | (¤16.21) | 07/18/2008 |
| PLAN CHECK FEE | (¤230.00) | 07/18/2008 |
| PLAN CHECK FEE | ¤230.00 | 07/18/2008 |
| PLUMBING FEE | ¤150.00 | 07/18/2008 |
| PLUMBING FEE | (¤150.00) | 07/18/2008 |
| RADON FEE | ¤16.21 | 07/18/2008 |
| BUILDING CODE ADMIN FUND | (¤16.21) | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤4,452.70 | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | (¤4,452.70) | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤1,862.00 | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | (¤1,862.00) | 07/18/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,826.90 |