I want to search for...
Permit #2008040185
Permit Details
Status: COED
| Parcel Id: 31-12-31-5371-00000-0040 |
| CONDITIONED SPACE: 1398 sqft |
| GARAGE: 1357 sqft |
| OPENED PORCH (WITH ROOF) : 114 sqft |
| OPENED PORCH (WITH ROOF) : 372 sqft |
| Total Square Footage: 3241 sqft |
| Block: 00000 |
| Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION |
| Job Phone: 386-586-2806 |
| Location Address: 485 SHADY OAKS DR |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 07/22/2008 |
| NOC: RECORDED |
| Applicant name: JAMES G PYLE |
| Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE |
|
Address #307 PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤133,518.00 |
| Job Description: BUILDING 9- TYPE 3B (2 FLOORS, 2 APT. UNITS) SP-MAJ-07-06 FOR "INTEGRA WOODS" |
| Type: CN |
Contractor
LANDSOUTH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1680 THE GREENS WAY JACKSONVILLE , FL 32277 |
CBC035104 (Exp: 08/31/2010) | 386-586-0781 | 386-586-2805 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
NINO JOE PARRALES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6824 PHILLIPS PKWY DR. S JACKSONVILLE , FL 32256 |
CAC057164 (Exp: 08/31/2010) | (904)346-1774 | (904)346-4788 |
STEPHEN JOHN CHASTAIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1923 TAMPA EAST BLVD TAMPA, FL 33619 |
CFC024520 (Exp: 08/31/2012) | (813)246-5341 | (813)246-5345 |
FRED M POMAR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1025 6TH STREET DAYTONA BEACH, FL 32117 |
CCC1328140 (Exp: 08/31/2010) | (386)255-6113 | (386)254-8816 |
Inspection History
| Type | Request Date | Result | Inspector |
| COMMERCIAL BUILDING FINAL | 04/23/2009 | FINAL APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| LANDSCAPE FINAL | 04/23/2009 | APPROVED - AS NOTED | WBUTLER |
| Note: A landscape bond exists for the few remaining punch list items. Will be reinspected with the next building final. Bill Butler | |||
| UTILITY COMPANY FINAL | 04/21/2009 | APPROVED | KKING |
| Note: THIS IS A REINSPECTION | |||
| ENGINEERING FINAL | 04/21/2009 | APPROVED | MCOBB |
| TRAFFIC ENGINEER | 04/21/2009 | APPROVED | MCOBB |
| COMMERCIAL BUILDING FINAL | 04/21/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| FIRE FINAL | 04/14/2009 | APPROVED | JPATTEE |
| UTILITY COMMERCIAL FINAL | 04/13/2009 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 04/13/2009 | Disapproved - NO FEE | KKING |
| Note: Meters need to be checked and accounts set up. After that recall inspection. | |||
| H.V.A.C. FINAL | 04/09/2009 | APPROVED | JHINDMAN |
| ELECTRICAL FINAL | 04/03/2009 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING FINAL | 03/31/2009 | APPROVED | JHINDMAN |
| ELECTRICAL FINAL | 03/26/2009 | PARTIALLY APPROVED | RMARVEL |
| Note: Inspection Requested at 3/25/2009 11:38:46 AM PARTIAL/SITE LIGHT/POLES | |||
| UNDERGROUND ELECTRICAL | 03/20/2009 | APPROVED | RMARVEL |
| Note: Inspection Requested at 3/19/2009 9:35:50 AM SITE LIGHTING | |||
| COMMERCIAL POWER INSPECTION | 02/24/2009 | APPROVED | RMARVEL |
| INSULATION INSPECTION | 12/15/2008 | APPROVED | JHINDMAN |
| FIREWALL INSPECTION | 12/12/2008 | APPROVED | JPATTEE |
| Note: Inspection Requested at 12/11/2008 3:50:16 PM PARTIAL | |||
| FRAMING | 12/11/2008 | APPROVED | JHINDMAN |
| SECOND ROUGH PLUMBING INSPECTION | 12/11/2008 | APPROVED | JHINDMAN |
| LATH /BRICK FLASHING | 12/11/2008 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| LATH /BRICK FLASHING | 12/09/2008 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: Inspection Resulted at 12/9/2008 3:04:53 PM BY JOHN | |||
| H.V.A.C. ROUGH | 12/05/2008 | APPROVED | JMCGOWEN |
| 2ND ROUGH ELECTRICAL | 12/04/2008 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 12/02/2008 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Requested at 12/1/2008 1:22:37 PM INSPECTION FOR WINDOW SCREW Inspection Resulted at 12/2/2008 3:21:37 PM WINDOW ANCHORS | |||
| 2ND ROUGH ELECTRICAL | 11/24/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: Robin from Landsouth called to schedule this inspection Inspection Resulted at 11/24/2008 3:48:57 PM RECHECK FIRE CAULKING WHERE REQUIRED. TORQUE ALL MAIN LUGS. DAMAGED CONDUCTORS WHERE STRIPPED AT PANEL. | |||
| TIE DOWN | 11/12/2008 | APPROVED | BBEMBRY |
| Note: letter submitted from engineer regarding the quick tie cables | |||
| ROOF IN PROGRESS | 11/05/2008 | APPROVED | JHINDMAN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/28/2008 | APPROVED | JHINDMAN |
| EXTERIOR WALL SHEATHING/SHEAR WALL | 10/21/2008 | APPROVED | JHINDMAN |
| Note: requested by John | |||
| FOUNDATION SURVEY APPROVED BY ZONING | 10/10/2008 | APPROVED | DRAMIREZ |
| MONOLITHIC SLAB INSPECTION/SLAB | 09/11/2008 | APPROVED | JHINDMAN |
| FIRST ROUGH PLUMBING INSPECTION | 08/27/2008 | APPROVED | PGALLMANN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 04/21/2009 | 04/21/2009 |
| Note: Released By: SKNOPF Approved for Release. Revision: panel schedule changes | |||
| ELEC | COMPLETE | 03/25/2009 | 03/27/2009 |
| Note: Released By: SKNOPF Approved for Release. revised panel schedule/site lighting circuit schedule | |||
| MECH | COMPLETE | 03/25/2009 | 03/27/2009 |
| Note: Released By: FREODICA ari handler tonage changes | |||
| ELEC | COMPLETE | 02/26/2009 | 02/26/2009 |
| Note: Released By: JMCGOWEN site lighting | |||
| BLD | COMPLETE | 02/17/2009 | 02/17/2009 |
| Note: Released By: JMCGOWEN field truss repair | |||
| ELEC | HOLD | 01/30/2009 | 01/30/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| MECH | COMPLETE | 01/27/2009 | 01/29/2009 |
| Note: Released By: FREODICA Revision: Specs for dryers in A3 units. | |||
| BLD | COMPLETE | 01/27/2009 | 01/28/2009 |
| Note: Released By: JJOSEPH drywall cgase construction w/5/8" drywall on adjacent ceiling and wall | |||
| BLD | COMPLETE | 01/26/2009 | 01/26/2009 |
| Note: Released By: JJOSEPH screen enclosure submittals and location | |||
| ELEC | HOLD | 01/21/2009 | 01/21/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040185 (Integra Woods Bldg 9 Type 3B @ 485 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| PLLA | COMPLETE | 01/21/2009 | 01/22/2009 |
| Note: Released By: WBUTLER | |||
| PLUM | COMPLETE | 12/08/2008 | 12/08/2008 |
| Note: Released By: FREODICA Revision: Plumbing revision 7 dated 11-26-08. | |||
| ZON | CANCEL | 11/19/2008 | |
| BLD | CANCEL | 11/18/2008 | 01/21/2009 |
| Note: REVISION ELEVATIONS OF SLAB | |||
| BLD | COMPLETE | 11/06/2008 | 11/06/2008 |
| Note: Released By: JMCGOWEN revision for trusses | |||
| PLUM | HOLD | 10/23/2008 | 10/23/2008 |
| Note: Held By: JMCGOWEN provide stamped plumbing revisions as per F.B.C. 105.3.1.2 | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION code compliant Hardware | |||
| BLD | COMPLETE | 10/22/2008 | 10/24/2008 |
| Note: Released By: JJOSEPH Revision Third floor: Removal of columns, cap and flashing details cabinet change/shelving change | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION Roofing submittals | |||
| MECH | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: FREODICA REVISION 1. Unit A3- HVAC Plan- Detail 2. | |||
| BLD | CANCEL | 10/17/2008 | 01/21/2009 |
| BLD | COMPLETE | 09/22/2008 | 09/22/2008 |
| Note: Released By: JMONTARULI Released by: J Joseph Anchor placement plans that show anchor spacing for all bearing walls | |||
| BLD | COMPLETE | 09/15/2008 | 09/22/2008 |
| Note: Released By: JJOSEPH Anchor placement plans that show anchor spacing for all bearing walls REVISION | |||
| FI1 | COMPLETE | 07/02/2008 | 07/11/2008 |
| Note: Released By: JPATTEE | |||
| ELEC | COMPLETE | 04/10/2008 | 04/10/2008 |
| Note: Released By: SKNOPF Approved for Release. | |||
| FI1 | HOLD | 04/10/2008 | 04/15/2008 |
| Note: Held By: JPATTEE 1) Plans do not provide design criteria for automatic fire sprinkler system(s) 2) Sheet E4.02 (2) does not indicate location of smoke detectors. 3) Unable to locate detail for the rated garage wall and rated floor ceiling. Ok JDP | |||
| MECH | COMPLETE | 04/10/2008 | 04/10/2008 |
| Note: Released By: JJOSEPH | |||
| PLUM | COMPLETE | 04/10/2008 | 04/10/2008 |
| Note: Released By: JJOSEPH | |||
| BLD | COMPLETE | 04/09/2008 | 04/10/2008 |
| Note: Released By: JJOSEPH |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REVISION | ¤40.00 | 04/24/2009 |
| REINSPECTION FEE | ¤40.00 | 12/23/2008 |
| RADON FEE | ¤16.21 | 07/22/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤1,862.00 | 07/22/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤4,452.70 | 07/22/2008 |
| PLAN CHECK FEE | ¤230.00 | 07/22/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤2,459.20 | 07/22/2008 |
| PLUMBING FEE | ¤150.00 | 07/22/2008 |
| BUILDING CODE ADMIN FUND | ¤16.21 | 07/22/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤380.58 | 07/22/2008 |
| ELECTRIC FEE | ¤150.00 | 07/22/2008 |
| MECHANICAL FEE | ¤150.00 | 07/22/2008 |
| PERMIT FEE | ¤1,120.00 | 07/22/2008 |
| PERMIT FEE | ¤1,120.00 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤2,459.20 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | (¤2,459.20) | 07/18/2008 |
| PERMIT FEE | (¤1,120.00) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | (¤380.58) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤380.58 | 07/18/2008 |
| MECHANICAL FEE | ¤150.00 | 07/18/2008 |
| MECHANICAL FEE | (¤150.00) | 07/18/2008 |
| BUILDING CODE ADMIN FUND | ¤16.21 | 07/18/2008 |
| ELECTRIC FEE | ¤150.00 | 07/18/2008 |
| ELECTRIC FEE | (¤150.00) | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤1,862.00 | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | (¤1,862.00) | 07/18/2008 |
| RADON FEE | (¤16.21) | 07/18/2008 |
| PLAN CHECK FEE | (¤230.00) | 07/18/2008 |
| PLAN CHECK FEE | ¤230.00 | 07/18/2008 |
| PLUMBING FEE | ¤150.00 | 07/18/2008 |
| PLUMBING FEE | (¤150.00) | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤4,452.70 | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | (¤4,452.70) | 07/18/2008 |
| RADON FEE | ¤16.21 | 07/18/2008 |
| BUILDING CODE ADMIN FUND | (¤16.21) | 07/18/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,626.90 |