Permit #2008040186
Permit Details
Status: COED
| Parcel Id: 31-12-31-5371-00000-0040 |
| CONDITIONED SPACE: 1398 sqft |
| GARAGE: 1357 sqft |
| OPENED PORCH (WITH ROOF) : 114 sqft |
| OPENED PORCH (WITH ROOF) : 372 sqft |
| Total Square Footage: 3241 sqft |
| Block: 00000 |
| Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION |
| Job Phone: 386-586-0781 |
| Location Address: 625 SHADY OAKS DR |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 08/15/2008 |
| NOC: RECORDED |
| Applicant name: JAMES G PYLE |
| Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE |
|
Address #307 PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤133,518.00 |
| Job Description: BUILDING 13- TYPE 3B (2 FLOORS, 2 APT. UNITS) SP-MAJ-07-06 FOR "INTEGRA WOODS" |
| Type: CN |
Contractor
LANDSOUTH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1680 THE GREENS WAY JACKSONVILLE , FL 32277 |
CBC035104 (Exp: 08/31/2010) | 386-586-0781 | 386-586-2805 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
NINO JOE PARRALES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6824 PHILLIPS PKWY DR. S JACKSONVILLE , FL 32256 |
CAC057164 (Exp: 08/31/2010) | (904)346-1774 | (904)346-4788 |
STEPHEN JOHN CHASTAIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1923 TAMPA EAST BLVD TAMPA, FL 33619 |
CFC024520 (Exp: 08/31/2012) | (813)246-5341 | (813)246-5345 |
FRED M POMAR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1025 6TH STREET DAYTONA BEACH, FL 32117 |
CCC1328140 (Exp: 08/31/2010) | (386)255-6113 | (386)254-8816 |
Inspection History
| Type | Request Date | Result | Inspector |
| COMMERCIAL BUILDING FINAL | 06/29/2009 | APPROVED - AS NOTED | JHINDMAN |
| Note: building final is ok but i can't 99 until landscape final is resulted. | |||
| LANDSCAPE FINAL | 06/22/2009 | FINAL APPROVED | WBUTLER |
| ENGINEERING FINAL | 06/18/2009 | APPROVED | MCOBB |
| TRAFFIC ENGINEER | 06/18/2009 | APPROVED | MCOBB |
| UTILITY COMMERCIAL FINAL | 06/12/2009 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 06/12/2009 | APPROVED | KKING |
| H.V.A.C. FINAL | 05/14/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ELECTRICAL FINAL | 05/14/2009 | APPROVED | JHINDMAN |
| H.V.A.C. FINAL | 05/11/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 5/11/2009 1:02:09 PM ANCHOR CONDENSER UNITS. | |||
| FIRE FINAL | 04/24/2009 | APPROVED | JPATTEE |
| PLUMBING FINAL | 04/23/2009 | APPROVED | JHINDMAN |
| COMMERCIAL POWER INSPECTION | 04/02/2009 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| COMMERCIAL POWER INSPECTION | 04/01/2009 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 4/1/2009 2:43:46 PM AIRHANDLERS NEED TO BE CLOSED. | |||
| UNDERGROUND ELECTRICAL | 03/25/2009 | PARTIALLY APPROVED | RMARVEL |
| Note: Inspection Requested at 3/24/2009 12:09:53 PM SITE LIGHTING | |||
| INSULATION INSPECTION | 01/27/2009 | APPROVED | JHINDMAN |
| LATH /BRICK FLASHING | 01/23/2009 | APPROVED | JHINDMAN |
| FRAMING | 01/23/2009 | APPROVED | JHINDMAN |
| SECOND ROUGH PLUMBING INSPECTION | 01/15/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. ROUGH | 01/14/2009 | APPROVED - AS NOTED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/14/2009 11:27:07 AM DAMPERS NOW TO PLAN | |||
| SECOND ROUGH PLUMBING INSPECTION | 01/13/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| SECOND ROUGH PLUMBING INSPECTION | 01/12/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| H.V.A.C. ROUGH | 01/09/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 1/9/2009 2:57:48 PM DUCT AND RADIATION DAMPER SIZE NOT PER PLAN IN LIVING ROOMS. | |||
| 2ND ROUGH ELECTRICAL | 01/08/2009 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| 2ND ROUGH ELECTRICAL | 01/07/2009 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 1/7/2009 3:15:09 PM TORQUE LUGS IN PANELS PROPERLY. | |||
| ROOF IN PROGRESS | 11/21/2008 | APPROVED | JHINDMAN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/21/2008 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FOUNDATION SURVEY APPROVED BY ZONING | 11/21/2008 | APPROVED | DRAMIREZ |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/19/2008 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 11/19/2008 3:49:34 PM ROOF SHEATHING ONLY | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/17/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Robin from Landsouth sent a note requesting this inspection Inspection Resulted at 11/17/2008 3:49:47 PM THIS WAS A ROOF SHEATHING INSPECTION, NAIL ARE EMBEDDED TO DEEP INTO OSB. | |||
| TEMPORARY POLE | 11/13/2008 | APPROVED | JHINDMAN |
| Note: Robin sent a note requesting this inspection Inspection Resulted at 11/13/2008 3:25:24 PM TRANSFORMER 16298 12 | |||
| TIE DOWN | 11/12/2008 | APPROVED | BBEMBRY |
| Note: letter submitted from engineer regarding the quick tie cables | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/12/2008 | APPROVED | JHINDMAN |
| Note: Inspection Requested at 11/10/2008 5:07:56 PM REINSPECT EXTERIOR WALL SHEATHING | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/10/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 11/10/2008 3:44:48 PM ANCHORS INSIDE COLUMNS ARE NOT TIGHT, PULL SHINERS, BLOCKING FOR SHEATHING IS NOT CONNECTED TO FRAMING. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 10/06/2008 | APPROVED | JHINDMAN |
| FIRST ROUGH PLUMBING INSPECTION | 09/30/2008 | APPROVED | PGALLMANN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 04/21/2009 | 04/21/2009 |
| Note: Released By: SKNOPF Approved for Release. Revision: panel schedule changes | |||
| ELEC | COMPLETE | 03/25/2009 | 03/27/2009 |
| Note: Released By: SKNOPF Approved for Release. revised panel schedule/site lighting circuit schedule | |||
| MECH | COMPLETE | 03/25/2009 | 03/27/2009 |
| Note: Released By: FREODICA Revision: Air handler tonage changed (Rev. 12, dated 2-23-09.) | |||
| ELEC | COMPLETE | 02/26/2009 | 02/26/2009 |
| Note: Released By: JMCGOWEN site lighting | |||
| BLD | COMPLETE | 02/17/2009 | 02/17/2009 |
| Note: Released By: JMCGOWEN fiedl truss repairs | |||
| ELEC | HOLD | 01/30/2009 | 01/30/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| MECH | COMPLETE | 01/27/2009 | 01/29/2009 |
| Note: Released By: FREODICA Revision: Specs for dryers in A3 units. | |||
| BLD | COMPLETE | 01/27/2009 | 01/28/2009 |
| Note: Released By: JJOSEPH drywall chase construction w/5/8" drywall on adjacent ceiling and wall | |||
| BLD | COMPLETE | 01/26/2009 | 01/26/2009 |
| Note: Released By: JJOSEPH screen enclosure submittals and location | |||
| ELEC | HOLD | 01/21/2009 | 01/21/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040186 (Integra Woods Bldg 13 Type 3B @ 625 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| PLLA | COMPLETE | 01/21/2009 | 01/22/2009 |
| Note: Released By: WBUTLER | |||
| BLD | COMPLETE | 12/18/2008 | 12/18/2008 |
| Note: Released By: JJOSEPH Revision: Applying Simpson RPS28 Straps. | |||
| MECH | HOLD | 12/12/2008 | 01/21/2009 |
| Note: Held By: JJOSEPH GE appliance product spec submittals provide more information on driers ,model numbers and duct distance. | |||
| PLUM | COMPLETE | 12/08/2008 | 12/08/2008 |
| Note: Released By: FREODICA Revision: Plumbing revision 7 dated 11-26-08. | |||
| ZON | CANCEL | 11/19/2008 | |
| BLD | COMPLETE | 11/06/2008 | 11/06/2008 |
| Note: Released By: JMCGOWEN revision for trusses | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION code compliant Hardware | |||
| PLUM | HOLD | 10/22/2008 | 10/23/2008 |
| Note: Held By: JMCGOWEN provide stamped plumbing revisions as per F.B.C. 105.3.1.2 | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION Roofing submittals | |||
| BLD | COMPLETE | 10/22/2008 | 10/24/2008 |
| Note: Released By: JJOSEPH Revision Third floor: Removal of columns, cap and flashing details cabinet change/shelving change | |||
| BLD | CANCEL | 10/17/2008 | 01/21/2009 |
| BLD | COMPLETE | 09/22/2008 | 09/22/2008 |
| Note: Released By: JJOSEPH Anchor placement plans that show anchor spacing for all bearing walls | |||
| BLD | HOLD | 09/15/2008 | 09/15/2008 |
| Note: Held By: JMCGOWEN provide anchor placement plans that show anchor spacing for all interior and exterior bearing walls | |||
| FI1 | COMPLETE | 07/02/2008 | 07/11/2008 |
| Note: Released By: JPATTEE | |||
| ELEC | COMPLETE | 04/10/2008 | 04/10/2008 |
| Note: Released By: SKNOPF Approved for release. | |||
| FI1 | HOLD | 04/10/2008 | 04/15/2008 |
| Note: Held By: JPATTEE 1) Plans do not provide design criteria for automatic fire sprinkler system(s) 2) Sheet E4.02 (2) does not indicate location of smoke detectors. 3) Unable to locate detail for the rated garage wall and rated floor ceiling. Ok JDP | |||
| MECH | COMPLETE | 04/10/2008 | 04/10/2008 |
| Note: Released By: JJOSEPH | |||
| PLUM | COMPLETE | 04/10/2008 | 04/10/2008 |
| Note: Released By: JJOSEPH | |||
| BLD | COMPLETE | 04/09/2008 | 04/10/2008 |
| Note: Released By: JJOSEPH |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REINSPECTION FEE | ¤40.00 | 06/29/2009 |
| REINSPECTION FEE | ¤40.00 | 05/06/2009 |
| REINSPECTION FEE | ¤40.00 | 04/03/2009 |
| REINSPECTION FEE | ¤40.00 | 01/27/2009 |
| REINSPECTION FEE | ¤40.00 | 01/15/2009 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤1,862.00 | 08/15/2008 |
| RADON FEE | ¤16.21 | 08/15/2008 |
| PLAN CHECK FEE | ¤230.00 | 08/15/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤2,459.20 | 08/15/2008 |
| PLUMBING FEE | ¤150.00 | 08/15/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤4,452.70 | 08/15/2008 |
| BUILDING CODE ADMIN FUND | ¤16.21 | 08/15/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤380.58 | 08/15/2008 |
| ELECTRIC FEE | ¤150.00 | 08/15/2008 |
| MECHANICAL FEE | ¤150.00 | 08/15/2008 |
| PERMIT FEE | ¤1,120.00 | 08/15/2008 |
| PERMIT FEE | ¤1,120.00 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤2,459.20 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | (¤2,459.20) | 07/18/2008 |
| PERMIT FEE | (¤1,120.00) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | (¤380.58) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤380.58 | 07/18/2008 |
| MECHANICAL FEE | ¤150.00 | 07/18/2008 |
| MECHANICAL FEE | (¤150.00) | 07/18/2008 |
| BUILDING CODE ADMIN FUND | ¤16.21 | 07/18/2008 |
| ELECTRIC FEE | ¤150.00 | 07/18/2008 |
| ELECTRIC FEE | (¤150.00) | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤1,862.00 | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | (¤1,862.00) | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤4,452.70 | 07/18/2008 |
| RADON FEE | (¤16.21) | 07/18/2008 |
| PLAN CHECK FEE | (¤230.00) | 07/18/2008 |
| PLAN CHECK FEE | ¤230.00 | 07/18/2008 |
| PLUMBING FEE | ¤150.00 | 07/18/2008 |
| PLUMBING FEE | (¤150.00) | 07/18/2008 |
| RADON FEE | ¤16.21 | 07/18/2008 |
| BUILDING CODE ADMIN FUND | (¤16.21) | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | (¤4,452.70) | 07/18/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,826.90 |