I want to search for...

Permit #2008040189

Permit Details

Status: COED

Parcel Id: 31-12-31-5371-00000-0040
CONDITIONED SPACE: 29352 sqft
GARAGE: 2892 sqft
OPENED PORCH (WITH ROOF) : 2704 sqft
Total Square Footage: 34948 sqft
Block: 00000
Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION
Job Phone: 386-586-2806
Location Address: 200 SHADY OAKS DR
Type: BM - BUILDING MULTI - APARTMENT
Issue Date: 07/10/2008
NOC: RECORDED
Applicant name: JAMES G PYLE
Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE

Address

#307

PALM COAST, FL 32137

Lot: 0040
Contracted Stated Job Value: ¤1,680,487.00
Job Description: BUILDING 1- TYPE 2 (3 FLOORS, 32 APT. UNITS) SP-MAJ-07-06 FOR "INTEGRA WOODS"
Type: CN

Contractor

LANDSOUTH CONSTRUCTION LLC
Status Location Address State License Number Phone Fax
CANCEL

1680 THE GREENS WAY

JACKSONVILLE , FL 32277

CBC035104 (Exp: 08/31/2010) 386-586-0781 386-586-2805

Sub Contractors

RANCE F BORDERICK
Status Location Address State License Number Phone Fax
ACTIVE

430 WEST DRIVE

ALTAMONTE SPRINGS, FL 32714

EC0000981 (Exp: 08/31/2026) (407)788-3500 407-788-2007
NINO JOE PARRALES
Status Location Address State License Number Phone Fax
CANCEL

6824 PHILLIPS PKWY DR. S

JACKSONVILLE , FL 32256

CAC057164 (Exp: 08/31/2010) (904)346-1774 (904)346-4788
STEPHEN JOHN CHASTAIN
Status Location Address State License Number Phone Fax
CANCEL

1923 TAMPA EAST BLVD

TAMPA, FL 33619

CFC024520 (Exp: 08/31/2012) (813)246-5341 (813)246-5345
FRED M POMAR
Status Location Address State License Number Phone Fax
CANCEL

1025 6TH STREET

DAYTONA BEACH, FL 32117

CCC1328140 (Exp: 08/31/2010) (386)255-6113 (386)254-8816

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 02/27/2009 FINAL APPROVED LWOODROME
Note: Approval based on previous inspection
LANDSCAPE FINAL 02/26/2009 APPROVED - AS NOTED WBUTLER
Note: A performance bond was received in the amount of $186,585.70 to cover the unfinished landscape and irrigation work.
COMMERCIAL BUILDING FINAL 02/26/2009 APPROVED - AS NOTED JHINDMAN
Note: Inspection Resulted at 2/26/2009 3:28:24 PM BUILDING FINAL OK BUT CANNOT CO UNTIL OTHER DEPARTMENTS INSPECTIONS HAVE BEEN APPROVED
UTILITY COMMERCIAL FINAL 02/25/2009 APPROVED KKING
UTILITY COMPANY FINAL 02/25/2009 APPROVED KKING
ENGINEERING FINAL 02/25/2009 APPROVED MCOBB
Note: per Don. S.
TRAFFIC ENGINEER 02/25/2009 APPROVED MCOBB
Note: per Don S.
ELECTRICAL FINAL 02/25/2009 APPROVED JHINDMAN
FIRE FINAL 02/24/2009 APPROVED JPATTEE
H.V.A.C. FINAL 02/20/2009 APPROVED JHINDMAN
Note: Inspection Requested at 2/19/2009 4:56:21 PM AFTERNOON REQUESTED
PLUMBING FINAL 02/18/2009 APPROVED JHINDMAN
UNDERGROUND ELECTRICAL 01/23/2009 APPROVED RMARVEL
Note: Inspection Requested at 1/22/2009 4:22:51 PM CONDUIT / STREET LIGHTING
COMMERCIAL POWER INSPECTION 01/23/2009 Disapproved -FEE REQUIRED RMARVEL
Note: THIS IS A REINSPECTION Inspection Requested at 1/22/2009 4:08:02 PM CONDUIT INSPECTION Inspection Resulted at 1/23/2009 2:02:47 PM NOT READY.
COMMERCIAL POWER INSPECTION 01/23/2009 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
COMMERCIAL POWER INSPECTION 01/22/2009 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 1/22/2009 3:35:40 PM NOT READY
INSULATION INSPECTION 12/08/2008 APPROVED JHINDMAN
FRAMING 12/05/2008 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
SECOND ROUGH PLUMBING INSPECTION 12/05/2008 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
LATH /BRICK FLASHING 12/04/2008 APPROVED JHINDMAN
FRAMING 12/04/2008 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Requested at 12/3/2008 5:14:13 PM AFTER LUNCH INSPECTION IF POSSIBLE Inspection Resulted at 12/4/2008 2:01:22 PM 1. BLOCKING MISSING. 2. TRUSS REPAIRS NEEDED CENTER WALLS 3. NEED TO FIX OVER BORING OF STUDS MANY PLACES.
SECOND ROUGH PLUMBING INSPECTION 12/04/2008 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Requested at 12/3/2008 5:14:45 PM AFTER LUNCH INSPECTION IF POSSIBLE Inspection Resulted at 12/4/2008 2:01:21 PM PIPING SUPPORTS MISSING SEVERAL PLACES. STRAPPING MISSING, NEED TO CHECK DWV TEST.
SECOND ROUGH PLUMBING INSPECTION 12/02/2008 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 12/2/2008 3:21:35 PM 1. ISOMETRIC DETAILS S8 AND S9A DO NOT MATCH AS BUILT. 2. RECHECK NAIL PLATES AND OVER BORING REPAIRS. 3. STRAP VENT STACKS IN ATTIC.
H.V.A.C. ROUGH 11/25/2008 APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
SECOND ROUGH PLUMBING INSPECTION 11/17/2008 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION squedule by Robyn Inspection Resulted at 11/17/2008 3:49:47 PM NOT PER PLAN
SECOND ROUGH PLUMBING INSPECTION 11/14/2008 CANCELLED BY APPLICANT JHINDMAN
Note: Inspection Resulted at 11/14/2008 10:35:48 AM BY DAVE
H.V.A.C. ROUGH 11/14/2008 Disapproved -FEE REQUIRED JMCGOWEN
Note: Inspection Resulted at 11/14/2008 10:52:27 AM LAUNDRY ROOM DUCT WORK PINCHED. "E" UNITS.TRANSFER DUCT AT FRONT AND REAR BED ROOMS MISSING IN UNITS. location of exhaust in bathrooms not to plan
2ND ROUGH ELECTRICAL 11/14/2008 APPROVED - AS NOTED LHITES
Note: THIS IS A REINSPECTION Inspection Resulted at 11/14/2008 11:28:22 AM MOVE A/C WIRES FROM EDGE OF 2X4 REPLACE JUMPER IN UNIT 310
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 11/13/2008 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
TIE DOWN 11/12/2008 APPROVED BBEMBRY
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 11/10/2008 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Requested at 11/7/2008 4:25:39 PM WINDOW SCREW INSPECTION Inspection Resulted at 11/10/2008 3:44:47 PM WINDOW SCREWS
2ND ROUGH ELECTRICAL 11/10/2008 CANCELLED BY APPLICANT RMARVEL
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 11/07/2008 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 11/7/2008 3:10:19 PM TRUSS BRACING COMPLETE
FIREWALL INSPECTION 11/05/2008 APPROVED JPATTEE
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 10/30/2008 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 10/30/2008 3:25:16 PM 1. FIRST FLOOR AND NORTH HALF OF 2ND FLOOR, FLOOR TRUSSES DO NOT BEAR COMPLETELY PER ENGINEERING.2. 3RD FLOOR NORTH SIDE END UNITS, HJHC26 VST ANCHOR IS NOT PER TRUSS ENGINEERING. 4. UNIT 300, TRUSS R125 MISSING TOP PLATE. 5. UNIT 300 VALLEY STRAPS NOT ANCHORED. 6. SMOOKE WALLS ARE NOT COMPLETE. 7. LS18``S MISSING ON CENTER BEARING WALLS. 8. UNIT 302, R124 AND R125 GIRDER TRUSSES ARE NOT NAILED PER ENGINEERING. 9. REAR BREEZEWAY OUTSIDE OF UNIT 302 R65A MISSING NAILS IN BUCKET. DID NOT WALK 2ND AND 3RD FLOOR SOUTH SIDE UNITS.
FIREWALL INSPECTION 10/23/2008 APPROVED - AS NOTED JLEWIS
Note: 1st layer drywall. needs second layer
ROOF IN PROGRESS 10/16/2008 APPROVED JHINDMAN
EXTERIOR WALL SHEATHING/SHEAR WALL 10/16/2008 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
EXTERIOR WALL SHEATHING/SHEAR WALL 10/15/2008 CANCELLED BY APPLICANT JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 10/15/2008 2:31:01 PM CANCELLED BY JOHN
FOUNDATION SURVEY APPROVED BY ZONING 10/10/2008 APPROVED DRAMIREZ
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 10/09/2008 PARTIALLY APPROVED JHINDMAN
Note: called by contractor Inspection Resulted at 10/9/2008 2:00:09 PM ROOF SHEATHING IS OK
EXTERIOR WALL SHEATHING/SHEAR WALL 10/09/2008 PARTIALLY APPROVED JHINDMAN
Note: called by contractor Inspection Resulted at 10/9/2008 2:00:09 PM PORCH COLUMN FRAMING IS OK, BREEZEWAY SHEATHING IS OK.
TEMPORARY POLE 08/19/2008 APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 8/19/2008 1:57:27 PM TRI CITY
TEMPORARY POLE 08/15/2008 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 8/15/2008 3:35:16 PM LOOSE CONNECTIONS
MONOLITHIC SLAB INSPECTION/SLAB 07/24/2008 APPROVED - AS NOTED CMINI
Note: POST TENSION SLAB ON BUILDING 1......
FIRST ROUGH PLUMBING INSPECTION 07/18/2008 APPROVED PGALLMANN

Review History

Department Status Date In Date Out
MECH COMPLETE 03/25/2009 03/25/2009
Note: Released By: FREODICA Revision: Air handler tonage changed (Rev. 12, dated 2-23-09.)
ELEC COMPLETE 03/25/2009 03/27/2009
Note: Released By: SKNOPF Approved for Release. Revised house panel schedules/site lighting circuit schedule.
ELEC COMPLETE 02/24/2009 02/25/2009
Note: Released By: JMCGOWEN Revision site lighting
ELEC COMPLETE 02/23/2009 02/24/2009
Note: Released By: JMCGOWEN Revision adding of hallway light
ELEC COMPLETE 02/23/2009 02/24/2009
Note: Released By: JMCGOWEN Revision deletion of GFI receptacle in bathroom move hall switch
ELEC COMPLETE 02/23/2009 02/24/2009
Note: Released By: JMCGOWEN revision addition of closet light (garage)
ELEC HOLD 01/30/2009 01/30/2009
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
MECH COMPLETE 01/27/2009 01/28/2009
Note: Released By: FREODICA Revision: Specs for washers/dryers in A1 & E units.
BLD COMPLETE 01/26/2009 01/26/2009
Note: Released By: JJOSEPH Revision screen enclosure submittals and location
PLLA CANCEL 01/21/2009
ELEC HOLD 01/21/2009 01/21/2009
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040189 (Integra Woods Bldg 1 Type 2 @ 200 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
MECH COMPLETE 01/06/2009 01/06/2009
Note: Released By: FREODICA Revision: E- unit type alternate bathroom exhaust route.
PLUM COMPLETE 12/19/2008 12/22/2008
Note: Released By: FREODICA Revision: Sealed letter concerning washer location.
PLUM COMPLETE 11/26/2008 12/01/2008
Note: Released By: FREODICA revision submitted 11/26/08 - "Plumbing Revisions for Entire Building System" Revised sheets P1.21, P1.21a, P1.22, P1.23, P6.01, P6.02 & P6.04.
MECH COMPLETE 11/19/2008 11/19/2008
Note: Released By: FREODICA Revision Removed (2) radiation ceiling dampers at bedroom #2 Unit E on Sheet M4.06 and installed wall return above door.
ZON CANCEL 11/19/2008
MECH COMPLETE 11/18/2008 11/19/2008
Note: Released By: JJOSEPH Revision alternate exhaust location
BLD COMPLETE 11/06/2008 11/06/2008
Note: Released By: JMCGOWEN truss repair revision
PLUM HOLD 10/22/2008 10/24/2008
Note: Held By: FREODICA Revision: Plans shall be signed and sealed by FL. Reg. Engr.
BLD COMPLETE 10/22/2008 10/23/2008
Note: Released By: JJOSEPH REVISION Roofing submittals
BLD COMPLETE 10/22/2008 10/23/2008
Note: Released By: JJOSEPH REVISION code compliant Hardware
BLD COMPLETE 10/22/2008 10/24/2008
Note: Released By: JJOSEPH Revision Third floor: Removal of columns, cap and flashing details cabinet change/shelving change
DSD HOLD 10/02/2008 10/06/2008
Note: Held By: DRAMIREZ Architectural plans need to be modified. On hold until modification is approved.
BLD COMPLETE 09/15/2008 09/22/2008
Note: Released By: JJOSEPH Anchor placement plans that show anchor spacing for all bearing walls REVISION
BLD COMPLETE 07/02/2008 07/03/2008
Note: Released By: FREODICA Rev. - Architectural , structural, and mech. sheets.
ELEC COMPLETE 07/02/2008 07/02/2008
Note: Released By: SKNOPF Approved for Release. Revision - Relocated switches and CU risers in garage. Relocated FACP, FACP heat detector, and FACP signage. Deleted AHU-FACP & CU-FACP and replaced with PTAC-F at ne FACP closet under stairwell. Relocated Owner Closet receptacles to Garage area.
BLD COMPLETE 05/09/2008 05/09/2008
Note: Released By: FREODICA Correction Energy calculations
FI1 COMPLETE 05/09/2008 05/12/2008
Note: Released By: JPATTEE correction Fire sprinkler design criteria
ELEC COMPLETE 04/10/2008 04/10/2008
Note: Released By: FREODICA Reviewed by R. Marvel.
FI1 HOLD 04/10/2008 04/23/2008
Note: Held By: JPATTEE 1) Plans do not provide design criteria for automatic fire sprinkler system(s) 2) Unable to locate detail for the rated garage wall and rated floor ceiling.
MECH COMPLETE 04/10/2008 04/10/2008
Note: Released By: FREODICA
PLUM COMPLETE 04/10/2008 04/10/2008
Note: Released By: FREODICA
BLD HOLD 04/09/2008 04/10/2008
Note: Held By: FREODICA 1. Provide energy calculations for building 1, type ll, Unit E, second floor. This is typical for building 6 ( permit application # 2008040190) and building 20 (permit application # 2008040191).
DSD COMPLETE 10/24/2008
Note: Released By: DRAMIREZ

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤120.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
REVISION ¤40.00 02/27/2009
SPECIAL INSPECTIONS ¤200.00 02/27/2009
REINSPECTION FEE ¤40.00 02/09/2009
REINSPECTION FEE ¤40.00 02/09/2009
REINSPECTION FEE ¤40.00 02/09/2009
REINSPECTION FEE ¤40.00 01/15/2009
REINSPECTION FEE ¤40.00 01/15/2009
REINSPECTION FEE ¤40.00 01/05/2009
REINSPECTION FEE ¤40.00 12/23/2008
REINSPECTION FEE ¤40.00 08/18/2008
ADMIN FEE ¤20.00 07/10/2008
BUILDING CODE ADMIN FUND ¤174.74 07/10/2008
ELECTRIC FEE ¤1,810.80 07/10/2008
FIRE IMPACT FEE RES 4/01/08 ¤6,089.28 07/10/2008
MECHANICAL FEE ¤1,810.80 07/10/2008
PERMIT FEE ¤16,324.00 07/10/2008
PARKS IMPACT FEE 4/01/08 ¤39,347.20 07/10/2008
PLUMBING FEE ¤1,810.80 07/10/2008
RADON FEE ¤174.74 07/10/2008
SCHOOL BOARD IMPACT FEE MULTI ¤29,792.00 07/10/2008
REVISION ¤20.00 07/10/2008
REVISION ¤40.00 07/10/2008
10/07 TRANS MULTI - FAMILY ¤71,243.20 07/10/2008
REVISION ¤40.00
REVISION ¤40.00
Fees Total Due: ¤80.00 Total Paid: ¤169,897.56