I want to search for...
Permit #2008040192
Permit Details
Status: COED
| Parcel Id: 31-12-31-5371-00000-0040 |
| CONDITIONED SPACE: 30040 sqft |
| GARAGE: 3892 sqft |
| OPENED PORCH (WITH ROOF) : 2476 sqft |
| OPENED PORCH (WITH ROOF) : 6286 sqft |
| Total Square Footage: 42694 sqft |
| Block: 00000 |
| Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION |
| Job Phone: 386-586-2806 |
| Location Address: 300 SHADY OAKS DR |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 07/22/2008 |
| NOC: RECORDED |
| Applicant name: JAMES G PYLE |
| Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE |
|
Address #307 PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤1,882,433.00 |
| Job Description: BUILDING 5- TYPE 1 (3 FLOORS, 32 APT. UNITS) SP-MAJ-07-06 FOR "INTEGRA WOODS" |
| Type: CN |
Contractor
LANDSOUTH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1680 THE GREENS WAY JACKSONVILLE , FL 32277 |
CBC035104 (Exp: 08/31/2010) | 386-586-0781 | 386-586-2805 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
NINO JOE PARRALES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6824 PHILLIPS PKWY DR. S JACKSONVILLE , FL 32256 |
CAC057164 (Exp: 08/31/2010) | (904)346-1774 | (904)346-4788 |
STEPHEN JOHN CHASTAIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1923 TAMPA EAST BLVD TAMPA, FL 33619 |
CFC024520 (Exp: 08/31/2012) | (813)246-5341 | (813)246-5345 |
FRED M POMAR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1025 6TH STREET DAYTONA BEACH, FL 32117 |
CCC1328140 (Exp: 08/31/2010) | (386)255-6113 | (386)254-8816 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 04/03/2009 | FINAL APPROVED | RMARVEL |
| COMMERCIAL BUILDING FINAL | 03/31/2009 | APPROVED | RMARVEL |
| UTILITY COMMERCIAL FINAL | 03/31/2009 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 03/31/2009 | APPROVED | KKING |
| ELECTRICAL FINAL | 03/31/2009 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| ELECTRICAL FINAL | 03/26/2009 | PARTIALLY APPROVED | RMARVEL |
| Note: 3RD FLOOR. | |||
| H.V.A.C. FINAL | 03/26/2009 | APPROVED | JHINDMAN |
| FIRE FINAL | 03/18/2009 | APPROVED | JPATTEE |
| PLUMBING FINAL | 03/16/2009 | APPROVED | JHINDMAN |
| ENGINEERING FINAL | 02/27/2009 | APPROVED | MCOBB |
| Note: per Don S.//site work complete | |||
| TRAFFIC ENGINEER | 02/27/2009 | APPROVED | MCOBB |
| Note: per Don S.//site work is complete | |||
| COMMERCIAL POWER INSPECTION | 02/23/2009 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 2/23/2009 2:32:45 PM 32 UNITS | |||
| INSULATION INSPECTION | 12/30/2008 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 12/29/2008 | CANCELLED BY APPLICANT | DROCKWELL |
| SECOND ROUGH PLUMBING INSPECTION | 12/22/2008 | APPROVED | JHINDMAN |
| Note: Inspection Requested at 12/21/2008 6:46:52 PM PM INSPECTION IF POSSIBLE | |||
| FRAMING | 12/22/2008 | APPROVED | JHINDMAN |
| Note: Inspection Requested at 12/21/2008 6:47:15 PM PM INSPECTION IF POSSIBLE | |||
| H.V.A.C. ROUGH | 12/19/2008 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| LATH /BRICK FLASHING | 12/10/2008 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/10/2008 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/10/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Requested at 12/9/2008 4:17:19 PM THIS IS A 2ND ROUGH PLUMBING Inspection Resulted at 12/10/2008 2:35:47 PM 1. SANITARY IS NOT PER PLAN. 2. LAUNDRY ROOMS AND TUBS ARE NOT PER PLAN. 3. CANNOT DECREASE PIPE SIZE IN THE DIRECTION OF FLOW. 4. WASTE STACK VENT CANNOT BE OFFSET BETWEEN FIXTURE DRAIN CONNECTIONS | |||
| LATH /BRICK FLASHING | 12/09/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 12/9/2008 3:04:53 PM LATH IS NOT COMPLETE. | |||
| H.V.A.C. ROUGH | 12/09/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: Inspection Resulted at 12/9/2008 3:18:35 PM UNITS D,C1,B1 EXHAUST VENTS AND DRYER VENTS NOT TO PLAN. UNIT D DRYER IS IN WRONG LOCATION. FIRE DAMPERS MISSING IN MULTIPLE LOCATIONS. | |||
| 2ND ROUGH ELECTRICAL | 12/04/2008 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| 2ND ROUGH ELECTRICAL | 11/24/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: Robin from Landsouth called to schedule this inspection Inspection Resulted at 11/24/2008 3:48:56 PM TORQUE MIAN LUGS IN ALL PANELS. RECHECK STRAPPING TO MEET 2005 NEC. CLOSE ALL UNUSED OPENINGS. REMOVE LOW VOLTAGE WIRES FROM INSIDE ELECTRICAL BOXES. FIRE PUTTY ALL BOXES IN FIRE RATED EXTERIOR WALLS. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/14/2008 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/14/2008 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Requested at 11/13/2008 5:13:30 PM INCLUDE WINDOW SCREW INSPECTION | |||
| TIE DOWN | 11/12/2008 | APPROVED | BBEMBRY |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/10/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 11/10/2008 3:44:48 PM ROOF TRUSS BRACING ONLY, 1. UNIT 109 S07 NEEDS REPAIR, 2. S07 BEARING NOT PER ENGINEERING, 3. UNIT 103 TRUSS F03 HAS LESS THAN 3" BEARING, 4. 3RD FLOOR TRUSSES R219``S MISSING BRACING, 5. R39 MOVE BRACING ON VERTICAL TO PROPER POSITION, 6, R39``S OUT OF PLUMB. | |||
| FIREWALL INSPECTION | 11/05/2008 | APPROVED | JPATTEE |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/31/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/31/2008 2:42:23 PM PARTIAL, INSPECTED CABLE TIES AND BOTTOM PLATE ANCHORS. CABLE TIES ARE NOT TORQUED TO SPEC. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 10/30/2008 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 10/20/2008 | PARTIALLY APPROVED | JHINDMAN |
| Note: REQUESTED BY DAVE Inspection Resulted at 10/20/2008 3:28:20 PM CENTRAL BREEZEWAYS AND BALCONY WALL SHEATHING, EXTERIOR COLUMN TIE DOWNS. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/16/2008 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 10/16/2008 2:45:39 PM ROOF SHEATHING IS OK | |||
| FOUNDATION SURVEY APPROVED BY ZONING | 10/10/2008 | APPROVED | DRAMIREZ |
| TEMPORARY POLE | 08/19/2008 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| TEMPORARY POLE | 08/15/2008 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 8/15/2008 3:35:17 PM REPLACE DAMAGED LFNC AND CONDUCTORS. TIGHTEN CONNECTORS. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 08/07/2008 | APPROVED | CMINI |
| FIRST ROUGH PLUMBING INSPECTION | 07/29/2008 | PARTIALLY APPROVED | PGALLMANN |
| Note: WATER TO BE TESTED. |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 03/25/2009 | 03/27/2009 |
| Note: Released By: SKNOPF Approved for Release. revisions to panel schedule/site lighting circuit schedule | |||
| MECH | COMPLETE | 03/25/2009 | 03/25/2009 |
| Note: Released By: FREODICA Revision: Air handler tonage changed (Rev. 12, dated 2-23-09.) | |||
| ELEC | COMPLETE | 02/25/2009 | 02/25/2009 |
| Note: Released By: JMCGOWEN revision site lighting | |||
| ELEC | HOLD | 01/30/2009 | 01/30/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| MECH | COMPLETE | 01/27/2009 | 01/29/2009 |
| Note: Released By: FREODICA Revision: Specs for dryers in A2 units. | |||
| BLD | COMPLETE | 01/26/2009 | 01/26/2009 |
| Note: Released By: JJOSEPH Revision screen enclosure submittals and location | |||
| ELEC | HOLD | 01/21/2009 | 01/21/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040192 (Integra Woods Bldg 5 Type 1 @ 300 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| PLLA | COMPLETE | 01/21/2009 | 01/22/2009 |
| Note: Released By: WBUTLER | |||
| PLUM | COMPLETE | 12/19/2008 | 12/22/2008 |
| Note: Released By: FREODICA Revision: Sealed letter concerning washer location. | |||
| PLUM | COMPLETE | 12/19/2008 | 12/19/2008 |
| Note: Released By: FREODICA Revision: Sealed letter concerning bathtub models (BT-2, BT-1). | |||
| BLD | COMPLETE | 12/18/2008 | 12/18/2008 |
| Note: Released By: JJOSEPH Revision: Applying Simpson RPS28 Straps. | |||
| MECH | COMPLETE | 12/18/2008 | 12/18/2008 |
| Note: Released By: FREODICA Revision: 1. Revised clothes dryer exhaust vent and bathroom exhaust layouts for Units C1 and D. | |||
| BLD | COMPLETE | 12/12/2008 | 12/12/2008 |
| Note: Released By: JJOSEPH Revision:- clarification / modification of a quick tip 3rd floor vault area only | |||
| PLUM | COMPLETE | 12/08/2008 | 12/08/2008 |
| Note: Released By: FREODICA 1. Revision: Plumbing revision 7 dated 11-26-08. | |||
| BLD | COMPLETE | 11/24/2008 | 11/24/2008 |
| Note: Released By: JJOSEPH Revision Web removal for AC chase | |||
| ZON | CANCEL | 11/19/2008 | |
| BLD | CANCEL | 11/18/2008 | |
| Note: REVISION ELEVATIONS OF SLAB | |||
| BLD | COMPLETE | 11/06/2008 | 11/06/2008 |
| Note: Released By: JMCGOWEN revision for trusses | |||
| PLUM | HOLD | 10/22/2008 | 10/24/2008 |
| Note: Held By: FREODICA Revision: Plans shall be signed and sealed by FL. Reg. Engr. | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION Roofing submittals | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION code compliant Hardware | |||
| BLD | COMPLETE | 10/22/2008 | 10/24/2008 |
| Note: Released By: JJOSEPH Revision Third floor: Removal of columns, cap and flashing details cabinet change/shelving change | |||
| DSD | HOLD | 10/02/2008 | 10/06/2008 |
| Note: Held By: DRAMIREZ Architectural plans need to be modified. On hold until modification is approved. | |||
| BLD | COMPLETE | 09/22/2008 | 09/22/2008 |
| Note: Released By: JMONTARULI Released by: J Joseph Anchor placement plans that show anchor spacing for all bearing walls | |||
| BLD | COMPLETE | 09/15/2008 | 09/22/2008 |
| Note: Released By: JJOSEPH Anchor placement plans that show anchor spacing for all bearing walls REVISION | |||
| FI1 | COMPLETE | 07/11/2008 | 07/14/2008 |
| Note: Released By: JPATTEE MISSING PAGE FROM PLANS SUBMITED (F1) | |||
| FI1 | HOLD | 07/02/2008 | 07/11/2008 |
| Note: Held By: JPATTEE Shett A5.01 not attached | |||
| BLD | COMPLETE | 07/02/2008 | 07/15/2008 |
| Note: Released By: JJOSEPH | |||
| ELEC | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: SKNOPF Approved for Release. | |||
| FI1 | HOLD | 04/11/2008 | 05/06/2008 |
| Note: Held By: JPATTEE 1) Plans do not provide design criteria for automatic fire sprinkler system(s) 2) Unable to locate detail for the rated garage wall and rated floor ceiling. Ok JDP | |||
| MECH | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: FREODICA | |||
| BLD | COMPLETE | 04/09/2008 | 04/11/2008 |
| Note: Released By: FREODICA | |||
| DSD | COMPLETE | 10/24/2008 | |
| Note: Released By: DRAMIREZ |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤80.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REVISION | ¤40.00 | 03/31/2009 |
| REINSPECTION FEE | ¤40.00 | 02/09/2009 |
| REINSPECTION FEE | ¤40.00 | 01/26/2009 |
| REINSPECTION FEE | ¤40.00 | 01/15/2009 |
| REINSPECTION FEE | ¤40.00 | 01/15/2009 |
| REINSPECTION FEE | ¤40.00 | 12/23/2008 |
| REVISION | ¤40.00 | 12/23/2008 |
| REINSPECTION FEE | ¤40.00 | 08/18/2008 |
| RADON FEE | ¤213.47 | 07/22/2008 |
| PLAN CHECK FEE | ¤3,786.95 | 07/22/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤39,347.20 | 07/22/2008 |
| PLUMBING FEE | ¤2,005.80 | 07/22/2008 |
| BUILDING CODE ADMIN FUND | ¤213.47 | 07/22/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤6,089.28 | 07/22/2008 |
| ELECTRIC FEE | ¤2,005.80 | 07/22/2008 |
| MECHANICAL FEE | ¤2,005.80 | 07/22/2008 |
| PERMIT FEE | ¤18,131.50 | 07/22/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤29,792.00 | 07/22/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤71,243.20 | 07/22/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤71,243.20 | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | (¤71,243.20) | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤29,792.00 | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | (¤29,792.00) | 07/18/2008 |
| PERMIT FEE | ¤18,131.50 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤39,347.20 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | (¤39,347.20) | 07/18/2008 |
| PERMIT FEE | (¤18,131.50) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | (¤6,089.28) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤6,089.28 | 07/18/2008 |
| MECHANICAL FEE | ¤2,005.80 | 07/18/2008 |
| MECHANICAL FEE | (¤2,005.80) | 07/18/2008 |
| BUILDING CODE ADMIN FUND | ¤213.47 | 07/18/2008 |
| ELECTRIC FEE | ¤2,005.80 | 07/18/2008 |
| ELECTRIC FEE | (¤2,005.80) | 07/18/2008 |
| RADON FEE | (¤213.47) | 07/18/2008 |
| PLAN CHECK FEE | (¤3,786.95) | 07/18/2008 |
| PLAN CHECK FEE | ¤3,786.95 | 07/18/2008 |
| PLUMBING FEE | ¤2,005.80 | 07/18/2008 |
| PLUMBING FEE | (¤2,005.80) | 07/18/2008 |
| RADON FEE | ¤213.47 | 07/18/2008 |
| BUILDING CODE ADMIN FUND | (¤213.47) | 07/18/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤175,834.47 |