I want to search for...
Permit #2008040193
Permit Details
Status: COED
| Parcel Id: 31-12-31-5371-00000-0040 |
| GARAGE: 3892 sqft |
| OPENED PORCH (WITH ROOF) : 2476 sqft |
| CONDITIONED SPACE: 30040 sqft |
| OPENED PORCH (WITH ROOF) : 6286 sqft |
| Total Square Footage: 42694 sqft |
| Block: 00000 |
| Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION |
| Job Phone: 386-586-0781 |
| Location Address: 500 SHADY OAKS DR |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 07/22/2008 |
| NOC: RECORDED |
| Applicant name: JAMES G PYLE |
| Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE |
|
Address #307 PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤1,882,433.00 |
| Job Description: BUILDING 10- TYPE 1 (3 FLOORS, 32 APT. UNITS) SP-MAJ-07-06 FOR "INTEGRA WOODS" |
| Type: CN |
Contractor
LANDSOUTH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1680 THE GREENS WAY JACKSONVILLE , FL 32277 |
CBC035104 (Exp: 08/31/2010) | 386-586-0781 | 386-586-2805 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
NINO JOE PARRALES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6824 PHILLIPS PKWY DR. S JACKSONVILLE , FL 32256 |
CAC057164 (Exp: 08/31/2010) | (904)346-1774 | (904)346-4788 |
STEPHEN JOHN CHASTAIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1923 TAMPA EAST BLVD TAMPA, FL 33619 |
CFC024520 (Exp: 08/31/2012) | (813)246-5341 | (813)246-5345 |
FRED M POMAR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1025 6TH STREET DAYTONA BEACH, FL 32117 |
CCC1328140 (Exp: 08/31/2010) | (386)255-6113 | (386)254-8816 |
Inspection History
| Type | Request Date | Result | Inspector |
| COMMERCIAL BUILDING FINAL | 05/26/2009 | FINAL APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| COMMERCIAL BUILDING FINAL | 05/18/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 5/18/2009 3:08:59 PM LEAD BOOTS ON ROOF ARE NOT SEALED PROPERLY | |||
| FINAL COMPLETE BUILDING INSPECTION | 05/18/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| UTILITY COMMERCIAL FINAL | 05/14/2009 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 05/14/2009 | APPROVED | KKING |
| LANDSCAPE FINAL | 05/14/2009 | APPROVED | WBUTLER |
| Note: A bond is on file for the remaining punch list items. Bill Butler | |||
| ENGINEERING FINAL | 05/14/2009 | APPROVED | MCOBB |
| TRAFFIC ENGINEER | 05/14/2009 | APPROVED | MCALDERON |
| H.V.A.C. FINAL | 05/14/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. FINAL | 05/11/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 5/11/2009 1:02:10 PM UNIT 110 AND 209 THERMOSTATS ARE NOT WORKING. UNITS 207, 304, 305, 306, 307 AHU DISCONNECTS WILL NOT FIT INTO UNIT PROPERLY. | |||
| FIRE FINAL | 05/07/2009 | APPROVED | JPATTEE |
| ELECTRICAL FINAL | 05/05/2009 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING FINAL | 05/05/2009 | APPROVED - AS NOTED | JHINDMAN |
| Note: Inspection Resulted at 5/5/2009 12:38:57 PM REPAIR UNIT 311SHOWER TRIM BY MECHANICAL FINAL. | |||
| ELECTRICAL FINAL | 04/29/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| ELECTRICAL FINAL | 04/28/2009 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 4/28/2009 3:24:12 PM NO MORE THAN 1/8IN GAP AORUND BOXES. NO MORE THAN 1/4IN SET BACK OF BOXES IN NON-COMBUSTIBLE MATERIAL. | |||
| COMMERCIAL POWER INSPECTION | 04/16/2009 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 4/16/2009 1:57:51 PM 32 UNITS AND THE HOUSE. | |||
| UNDERGROUND ELECTRICAL | 03/24/2009 | APPROVED | JHINDMAN |
| Note: Inspection Requested at 3/23/2009 1:16:40 PM SITE LIGHTING | |||
| UNDERGROUND ELECTRICAL | 03/23/2009 | CANCELLED BY APPLICANT | RMARVEL |
| UNDERGROUND ELECTRICAL | 03/20/2009 | APPROVED | RMARVEL |
| Note: Inspection Requested at 3/19/2009 9:39:31 AM SITE LIGHTING | |||
| INSULATION INSPECTION | 02/16/2009 | APPROVED | JHINDMAN |
| FRAMING | 02/10/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| LATH /BRICK FLASHING | 01/20/2009 | APPROVED | JHINDMAN |
| FRAMING | 01/20/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/20/2009 3:43:36 PM NEED REVISION FOR OVER SPANNED FLOOR TRUSSES. INCOMPLETE INSPECTION. | |||
| FRAMING | 01/14/2009 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Requested at 1/5/2009 3:56:39 PM FINAL FRAMING Inspection Requested at 1/5/2009 3:57:13 PM FINAL FRAMING Inspection Requested at 1/13/2009 3:45:46 PM FINAL FRAMING Inspection Resulted at 1/14/2009 3:34:23 PM NOT READY....INTERIOR WALLS OVER SPACED...FIREBLOCK MISSING...FIRECAULK MISSING....HAVE PAPER WORK SHOWING FLOOR JOIST SPACING OVER 24" O.C. PER PLAN IS ACCEPTABLE WHERE PLUMBING OR MECHANICAL IS GOING THROUGH. | |||
| SECOND ROUGH PLUMBING INSPECTION | 01/12/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 01/07/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: Inspection Requested at 1/5/2009 3:56:39 PM FINAL FRAMING Inspection Requested at 1/5/2009 3:57:13 PM FINAL FRAMING | |||
| FRAMING | 01/06/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: Inspection Requested at 1/5/2009 3:56:39 PM FINAL FRAMING | |||
| SECOND ROUGH PLUMBING INSPECTION | 01/06/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Requested at 1/5/2009 1:09:21 PM PARTIAL SANITARY Inspection Resulted at 1/6/2009 3:13:18 PM SANITARY EXCEPT FOR TUBSETS. | |||
| SECOND ROUGH PLUMBING INSPECTION | 12/31/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/31/2008 2:26:47 PM RPLACE DWV PIPE THAT BWAS DAMAGED IN UNIT 111. RECHECK NAIL PLATES ALL OVER. STILL NEED TO CHECK FOR HEAD PRESSURE ON SANITARY SYSTEM. | |||
| H.V.A.C. ROUGH | 12/31/2008 | APPROVED | JMCGOWEN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/29/2008 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Requested at 12/24/2008 11:52:22 AM REINSPECTION | |||
| 2ND ROUGH ELECTRICAL | 12/29/2008 | APPROVED | RMARVEL |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/23/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/23/2008 12:57:01 PM STILL NEED REPAIRS DONE ON PLATE BREAKS UNDER 48" | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/16/2008 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/16/2008 2:41:49 PM BY DAVE | |||
| SECOND ROUGH PLUMBING INSPECTION | 12/16/2008 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Requested at 12/15/2008 4:23:18 PM PARTIAL SANITARY Inspection Resulted at 12/16/2008 2:41:49 PM BY DAVE | |||
| SECOND ROUGH PLUMBING INSPECTION | 12/10/2008 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: Inspection Requested at 12/9/2008 4:15:51 PM THIS IS A PARTIAL Inspection Resulted at 12/10/2008 2:35:46 PM INSPECTION OF A HIGHER PRIORITY HAS NOT PASSED | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/10/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/10/2008 2:35:45 PM 1. REPAIR TOP PLATES THAT HAVE BREAKS LESS THAN 48" ON CENTER. 2. STRAP RAISED CENTER WALL PER QUICK TIE ENGINEERING. 3. STAIR TOWER LANDINGS ARE MISSING BUCKETS ON JOISTS. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/04/2008 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Requested at 12/3/2008 5:18:00 PM THIS IS ACTUALLY A WINDOW SCREW INSPECTION Inspection Resulted at 12/4/2008 2:01:24 PM WINDOW ANCHORS | |||
| ROOF IN PROGRESS | 12/02/2008 | APPROVED | JHINDMAN |
| Note: Robin from Landsouth called to schedule this inspection | |||
| FIREWALL INSPECTION | 12/02/2008 | APPROVED | JPATTEE |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/21/2008 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 11/21/2008 3:37:52 PM QUICK TIE CABLES | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/21/2008 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/20/2008 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Requested at 11/19/2008 4:23:52 PM SHEATHING FOR DRY IN Inspection Resulted at 11/20/2008 3:20:51 PM ROOF SHEATHING ONLY | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/19/2008 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/19/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Requested at 11/18/2008 4:46:49 PM DRY-IN ONLY Inspection Resulted at 11/19/2008 3:49:33 PM PULL SHINERS FROM ROOF SHEATHING. THIS WAS A SHEATHING INSPECTION ONLY | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/14/2008 | PARTIALLY APPROVED | DROCKWELL |
| Note: Inspection Requested at 11/12/2008 5:56:48 PM BREEWAY AND COLUMNS FOR CLOSE UP. Inspection Resulted at 11/14/2008 11:41:28 AM BREEZWAYS AND BALCONIES ONLY | |||
| TEMPORARY POLE | 11/13/2008 | APPROVED | JHINDMAN |
| Note: Robin sent a note requesting this inspection Inspection Resulted at 11/13/2008 3:25:26 PM TRANSFORMER 16300 08 | |||
| TIE DOWN | 11/12/2008 | APPROVED | BBEMBRY |
| FOUNDATION SURVEY APPROVED BY ZONING | 10/10/2008 | APPROVED | DRAMIREZ |
| MONOLITHIC SLAB INSPECTION/SLAB | 09/02/2008 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 08/27/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 8/27/2008 2:50:36 PM FORMWORK IS NOT COMPLETE, CABLES LAYING ON GROUND IN SEVERAL PLACES AND ARE NOT SECURED AT CENTER WALL. | |||
| FIRST ROUGH PLUMBING INSPECTION | 08/19/2008 | APPROVED | PGALLMANN |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 08/18/2008 | CANCELLED BY APPLICANT | PGALLMANN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 04/21/2009 | 04/21/2009 |
| Note: Released By: SKNOPF Approved for Release. Revision: panel schedule changes. | |||
| ELEC | COMPLETE | 03/25/2009 | 03/27/2009 |
| Note: Released By: SKNOPF Approved for Release. revisions to panel schedule/site lighting circuit schedule | |||
| MECH | COMPLETE | 03/25/2009 | 03/25/2009 |
| Note: Released By: FREODICA Revision: Air handler tonage changed (Rev. 12, dated 2-23-09.) | |||
| ELEC | COMPLETE | 02/25/2009 | 02/25/2009 |
| Note: Released By: JMCGOWEN revision site lighting | |||
| BLD | COMPLETE | 02/09/2009 | 02/09/2009 |
| Note: Released By: JMCGOWEN Revision Revision to stair towers/connections | |||
| BLD | COMPLETE | 02/04/2009 | 02/05/2009 |
| Note: Released By: JJOSEPH truss repair | |||
| ELEC | HOLD | 01/30/2009 | 01/30/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| BLD | COMPLETE | 01/29/2009 | 01/30/2009 |
| Note: Released By: JJOSEPH Revision Truss Repair | |||
| MECH | COMPLETE | 01/27/2009 | 01/29/2009 |
| Note: Released By: FREODICA Revision: Specs for dryers in B1, C1, & D units. | |||
| BLD | COMPLETE | 01/26/2009 | 01/26/2009 |
| Note: Released By: JJOSEPH revision screen enclosure submittals and location | |||
| ELEC | HOLD | 01/21/2009 | 01/21/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040193 (Integra Woods Bldg 10 Type 1 @ 500 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| PLLA | COMPLETE | 01/21/2009 | 01/22/2009 |
| Note: Released By: WBUTLER | |||
| PLUM | COMPLETE | 12/19/2008 | 12/22/2008 |
| Note: Released By: FREODICA Revision: Sealed letter concerning washer location. | |||
| PLUM | COMPLETE | 12/19/2008 | 12/19/2008 |
| Note: Released By: FREODICA Revision: Sealed letter concerning bathtub models (BT-2, BT-1). | |||
| BLD | COMPLETE | 12/18/2008 | 12/18/2008 |
| Note: Released By: JJOSEPH Revision: Applying Simpson RPS28 Straps. | |||
| MECH | COMPLETE | 12/18/2008 | 12/18/2008 |
| Note: Released By: FREODICA Revision: 1. Revised clothes dryer exhaust vent and bathroom exhaust layouts for Units C1 and D. | |||
| BLD | COMPLETE | 12/12/2008 | 12/12/2008 |
| Note: Released By: JJOSEPH Revision:- clarification / modification of a quick tip 3rd floor vault area only | |||
| PLUM | COMPLETE | 12/08/2008 | 12/08/2008 |
| Note: Released By: FREODICA Revision: Plumbing revision 7 dated 11-26-08. | |||
| BLD | COMPLETE | 12/03/2008 | 12/04/2008 |
| Note: Released By: FREODICA Truss repair: Truses R35AREP, R36AREP, R37REP, R41REP, R07REP, R09REP, & R16REP. | |||
| BLD | COMPLETE | 12/01/2008 | 12/01/2008 |
| Note: Released By: FREODICA Revision Truss Repairs: Trusses R10REP, R11REP, R37REP (twice), R38REP, R39REP, R40REP (twice) | |||
| BLD | COMPLETE | 11/24/2008 | 11/24/2008 |
| Note: Released By: JJOSEPH Revision Web removal for AC chase | |||
| ZON | CANCEL | 11/19/2008 | |
| BLD | COMPLETE | 11/06/2008 | 11/06/2008 |
| Note: Released By: JMCGOWEN revison for trusses | |||
| BLD | COMPLETE | 10/22/2008 | 10/24/2008 |
| Note: Released By: JJOSEPH Revision Third floor: Removal of columns, cap and flashing details cabinet change/shelving change | |||
| PLUM | HOLD | 10/22/2008 | 10/24/2008 |
| Note: Held By: FREODICA Revision: Plans shall be signed and sealed by FL. Reg. Engr. | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION Roofing submittals | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION code compliant Hardware | |||
| DSD | HOLD | 10/02/2008 | 10/06/2008 |
| Note: Held By: DRAMIREZ Architectural plans need to be modified. On hold until modification is approved. | |||
| BLD | COMPLETE | 09/22/2008 | 09/22/2008 |
| Note: Released By: JMONTARULI Released by: J Joseph Anchor placement plans that show anchor spacing for all bearing walls | |||
| BLD | COMPLETE | 09/15/2008 | 09/22/2008 |
| Note: Released By: JJOSEPH Anchor placement plans that show anchor spacing for all bearing walls REVISION | |||
| FI1 | COMPLETE | 07/11/2008 | 07/14/2008 |
| Note: Released By: JPATTEE | |||
| FI1 | HOLD | 07/02/2008 | 07/11/2008 |
| Note: Held By: JPATTEE Sheet A5.01not attached | |||
| ELEC | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: SKNOPF Approved for Release. | |||
| FI1 | HOLD | 04/11/2008 | 05/06/2008 |
| Note: Held By: JPATTEE Released By: JPATTEE 1) Plans do not provide design criteria for automatic fire sprinkler system(s) 2) Unable to locate detail for the rated garage wall and rated floor ceiling.Ok JDP | |||
| MECH | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: FREODICA | |||
| BLD | COMPLETE | 04/09/2008 | 04/11/2008 |
| Note: Released By: FREODICA | |||
| DSD | COMPLETE | 10/24/2008 | |
| Note: Released By: DRAMIREZ |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/27/2009 |
| REINSPECTION FEE | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REVISION | ¤40.00 | 05/27/2009 |
| REINSPECTION FEE | ¤40.00 | 05/13/2009 |
| REINSPECTION FEE | ¤40.00 | 05/13/2009 |
| REINSPECTION FEE | ¤40.00 | 02/09/2009 |
| REINSPECTION FEE | ¤40.00 | 02/02/2009 |
| REINSPECTION FEE | ¤40.00 | 01/26/2009 |
| REINSPECTION FEE | ¤40.00 | 01/15/2009 |
| REINSPECTION FEE | ¤40.00 | 01/15/2009 |
| REINSPECTION FEE | ¤40.00 | 01/15/2009 |
| RADON FEE | ¤213.47 | 07/22/2008 |
| PLAN CHECK FEE | ¤3,786.95 | 07/22/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤39,347.20 | 07/22/2008 |
| PLUMBING FEE | ¤2,005.80 | 07/22/2008 |
| BUILDING CODE ADMIN FUND | ¤213.47 | 07/22/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤6,089.28 | 07/22/2008 |
| ELECTRIC FEE | ¤2,005.80 | 07/22/2008 |
| MECHANICAL FEE | ¤2,005.80 | 07/22/2008 |
| PERMIT FEE | ¤18,131.50 | 07/22/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤71,243.20 | 07/22/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤29,792.00 | 07/22/2008 |
| 10/07 TRANS MULTI - FAMILY | (¤71,243.20) | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤71,243.20 | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤29,792.00 | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | (¤29,792.00) | 07/18/2008 |
| PERMIT FEE | ¤18,131.50 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤39,347.20 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | (¤39,347.20) | 07/18/2008 |
| PERMIT FEE | (¤18,131.50) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | (¤6,089.28) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤6,089.28 | 07/18/2008 |
| MECHANICAL FEE | ¤2,005.80 | 07/18/2008 |
| MECHANICAL FEE | (¤2,005.80) | 07/18/2008 |
| BUILDING CODE ADMIN FUND | ¤213.47 | 07/18/2008 |
| ELECTRIC FEE | ¤2,005.80 | 07/18/2008 |
| ELECTRIC FEE | (¤2,005.80) | 07/18/2008 |
| RADON FEE | (¤213.47) | 07/18/2008 |
| PLAN CHECK FEE | (¤3,786.95) | 07/18/2008 |
| PLAN CHECK FEE | ¤3,786.95 | 07/18/2008 |
| PLUMBING FEE | ¤2,005.80 | 07/18/2008 |
| PLUMBING FEE | (¤2,005.80) | 07/18/2008 |
| RADON FEE | ¤213.47 | 07/18/2008 |
| BUILDING CODE ADMIN FUND | (¤213.47) | 07/18/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤176,074.47 |