Permit #2008040194

Permit Details

Status: COED

Parcel Id: 31-12-31-5371-00000-0040
CONDITIONED SPACE: 30040 sqft
OPENED PORCH (WITH ROOF) : 2476 sqft
GARAGE: 3892 sqft
OPENED PORCH (WITH ROOF) : 6286 sqft
Total Square Footage: 42694 sqft
Block: 00000
Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION
Job Phone: 386-586-0781
Location Address: 555 SHADY OAKS DR
Type: BM - BUILDING MULTI - APARTMENT
Issue Date: 07/22/2008
NOC: RECORDED
Applicant name: JAMES G PYLE
Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE

Address

#307

PALM COAST, FL 32137

Lot: 0040
Contracted Stated Job Value: ¤1,882,433.00
Job Description: BUILDING 11- TYPE 1 (3 FLOORS, 32 APT. UNITS) SP-MAJ-07-06 FOR "INTEGRA WOODS"
Type: CN

Contractor

LANDSOUTH CONSTRUCTION LLC
Status Location Address State License Number Phone Fax
CANCEL

1680 THE GREENS WAY

JACKSONVILLE , FL 32277

CBC035104 (Exp: 08/31/2010) 386-586-0781 386-586-2805

Sub Contractors

RANCE F BORDERICK
Status Location Address State License Number Phone Fax
ACTIVE

430 WEST DRIVE

ALTAMONTE SPRINGS, FL 32714

EC0000981 (Exp: 08/31/2026) (407)788-3500 407-788-2007
NINO JOE PARRALES
Status Location Address State License Number Phone Fax
CANCEL

6824 PHILLIPS PKWY DR. S

JACKSONVILLE , FL 32256

CAC057164 (Exp: 08/31/2010) (904)346-1774 (904)346-4788
STEPHEN JOHN CHASTAIN
Status Location Address State License Number Phone Fax
CANCEL

1923 TAMPA EAST BLVD

TAMPA, FL 33619

CFC024520 (Exp: 08/31/2012) (813)246-5341 (813)246-5345
FRED M POMAR
Status Location Address State License Number Phone Fax
CANCEL

1025 6TH STREET

DAYTONA BEACH, FL 32117

CCC1328140 (Exp: 08/31/2010) (386)255-6113 (386)254-8816

Inspection History

Type Request Date Result Inspector
COMMERCIAL BUILDING FINAL 05/19/2009 APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 5/19/2009 2:10:15 PM VERIFIED FIXED HOLE IN FIRE WALL OF GARAGE AS PER GERALD HINDMAN.
COMMERCIAL BUILDING FINAL 05/15/2009 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 5/15/2009 3:38:26 PM FIX HOLES IN FIRE WALLS IN MIDDLE GARAGE UNIT.
ENGINEERING FINAL 05/14/2009 APPROVED MCOBB
TRAFFIC ENGINEER 05/14/2009 APPROVED MCOBB
LANDSCAPE FINAL 05/14/2009 APPROVED WBUTLER
Note: A bond is on file for the remaining punch list items. Bill Butler
UTILITY COMMERCIAL FINAL 05/12/2009 APPROVED KKING
UTILITY COMPANY FINAL 05/12/2009 APPROVED KKING
H.V.A.C. FINAL 05/06/2009 APPROVED JHINDMAN
FIRE FINAL 04/29/2009 APPROVED JLEWIS
ELECTRICAL FINAL 04/28/2009 APPROVED RMARVEL
ELECTRICAL FINAL 04/27/2009 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 4/27/2009 4:03:09 PM LIGHT SWITCHES IN BEDROOMS MUST BE ON ARC FAULT CIRCUIT. NEED REVISED PLAN FOR HOUSE PANEL.
PLUMBING FINAL 04/23/2009 APPROVED JHINDMAN
UNDERGROUND ELECTRICAL 04/16/2009 APPROVED RMARVEL
COMMERCIAL POWER INSPECTION 04/06/2009 APPROVED RMARVEL
UNDERGROUND ELECTRICAL 03/24/2009 APPROVED JHINDMAN
Note: Inspection Requested at 3/23/2009 1:17:49 PM SITE LIGHTING
INSULATION INSPECTION 02/12/2009 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
INSULATION INSPECTION 02/11/2009 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 2/11/2009 2:55:55 PM NOT READY. FIRE SPRINKLER LINE CUT OPEN , INSULATION BY SPRINKLER LINES IS NOT IN PLACE.
INSULATION INSPECTION 02/10/2009 CANCELLED BY APPLICANT AIRS WEB
FRAMING 02/05/2009 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Requested at 2/3/2009 3:10:47 PM FINAL FRAMING
FRAMING 02/04/2009 CANCELLED BY APPLICANT AIRS WEB
Note: THIS IS A REINSPECTION Inspection Requested at 2/3/2009 3:10:47 PM FINAL FRAMING
FRAMING 01/28/2009 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Requested at 1/27/2009 3:56:11 PM FINAL FRAME Inspection Resulted at 1/28/2009 2:44:45 PM FLOOR TRUSS SPACING IS NOT PER ENGINEERS DESIGN FOR OVER SPAN
SECOND ROUGH PLUMBING INSPECTION 01/28/2009 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
SECOND ROUGH PLUMBING INSPECTION 01/27/2009 CANCELLED BY APPLICANT AIRS WEB
H.V.A.C. ROUGH 01/27/2009 APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
H.V.A.C. ROUGH 01/23/2009 Disapproved -FEE REQUIRED JMCGOWEN
Note: THIS IS A REINSPECTION Inspection Resulted at 1/23/2009 2:39:06 PM PENATRATION THRU THE PLENUM AREA NEED TO BE SEAL AND WOOD NEEDS TO BE OUT OF AREA...ALSO WALL STUDS HAVE BEEN COMPREMISED.
LATH /BRICK FLASHING 01/23/2009 APPROVED JHINDMAN
SECOND ROUGH PLUMBING INSPECTION 01/09/2009 PARTIALLY APPROVED JHINDMAN
Note: partial sanitary except tubsets
H.V.A.C. ROUGH 01/09/2009 Disapproved -FEE REQUIRED LWOODROME
Note: Inspection Resulted at 1/9/2009 3:37:10 PM NEED REVISION FOR EXAUST VENTS IN C-UNITS...NEED TO REMOVE FLAMABLE MATERIAL AND PVC PIPE FROM AIR RETURNS.
2ND ROUGH ELECTRICAL 01/09/2009 APPROVED RMARVEL
Note: Inspection Requested at 1/8/2009 11:19:52 AM REINSPECT
2ND ROUGH ELECTRICAL 01/08/2009 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 1/8/2009 3:06:51 PM PROPERLY TORQUE LUGS.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 12/30/2008 PARTIALLY APPROVED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Requested at 12/29/2008 2:55:19 PM TRUSS BRACES/ENGINEERING REMAINS TO BE VIEWED. Inspection Resulted at 12/30/2008 11:36:01 AM TRUSS BRACING AND TIE-DOWN ONLY OK.......DR
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 12/23/2008 CANCELLED BY APPLICANT JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 12/23/2008 12:57:01 PM BY JOHN
FRAMING 12/16/2008 PARTIALLY APPROVED JHINDMAN
Note: Inspection Requested at 12/15/2008 10:33:09 AM PARTIAL WINDOW SCREW Inspection Resulted at 12/16/2008 2:41:48 PM WINDOW ANCHORS
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 12/10/2008 CANCELLED BY APPLICANT JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 12/10/2008 2:35:46 PM BY JOHN
ROOF IN PROGRESS 12/04/2008 APPROVED JHINDMAN
FIREWALL INSPECTION 12/02/2008 APPROVED JPATTEE
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 12/02/2008 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Requested at 12/1/2008 1:19:30 PM INSPECTION FOR CABLE ONLY Inspection Resulted at 12/2/2008 3:21:38 PM QUICK TIE CABLES AND SILL PLATE ANCHORS ONLY
EXTERIOR WALL SHEATHING/SHEAR WALL 11/26/2008 APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Requested at 11/25/2008 2:17:44 PM 2ND HALF OF WALL SHEATHING INSPECTION
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 11/20/2008 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Requested at 11/19/2008 4:25:18 PM SHEATHING FOR DRY IN Inspection Resulted at 11/20/2008 3:20:52 PM ROOF SHEATHING ONLY
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 11/19/2008 CANCELLED BY APPLICANT JHINDMAN
Note: Inspection Requested at 11/18/2008 4:47:55 PM DRY-IN ONLY Inspection Resulted at 11/19/2008 3:49:35 PM BY JOHN
EXTERIOR WALL SHEATHING/SHEAR WALL 11/19/2008 PARTIALLY APPROVED JHINDMAN
Note: Inspection Requested at 11/18/2008 4:47:43 PM PARTIAL ON BREEZEWAYS AND COLUMNS Inspection Resulted at 11/19/2008 3:49:34 PM BREEZEWAYS AND BALCONYS ONLY
TEMPORARY POLE 11/13/2008 APPROVED JHINDMAN
Note: Robin sent a note requesting this inspection Inspection Resulted at 11/13/2008 3:25:24 PM TRANSFORMER 16298 18
TIE BEAM 11/12/2008 APPROVED BBEMBRY
FOUNDATION SURVEY APPROVED BY ZONING 10/10/2008 APPROVED DRAMIREZ
MONOLITHIC SLAB INSPECTION/SLAB 09/19/2008 APPROVED JHINDMAN
FIRST ROUGH PLUMBING INSPECTION 09/15/2008 APPROVED PGALLMANN

Review History

Department Status Date In Date Out
ELEC COMPLETE 04/21/2009 04/21/2009
Note: Released By: SKNOPF Approved for Release. Revision: panel schedule changes.
ELEC COMPLETE 03/25/2009 03/27/2009
Note: Released By: SKNOPF Approved for Release. revisions to panel schedule/site lighting circuit schedule
MECH COMPLETE 03/25/2009 03/25/2009
Note: Released By: FREODICA Revision: Air handler tonage changed (Rev. 12, dated 2-23-09.)
ELEC COMPLETE 02/25/2009 02/25/2009
Note: Released By: JMCGOWEN revision site lighting
BLD COMPLETE 02/09/2009 02/09/2009
Note: Released By: JMCGOWEN Revision revision to stair tower/connections
BLD COMPLETE 02/04/2009 02/05/2009
Note: Released By: JJOSEPH truss repair
ELEC HOLD 01/30/2009 01/30/2009
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
BLD COMPLETE 01/29/2009 01/30/2009
Note: Released By: JJOSEPH Revision Truss repair
MECH COMPLETE 01/27/2009 01/29/2009
Note: Released By: FREODICA Revision: Specs for washers/dryers in B1, C1, & D units.
BLD COMPLETE 01/26/2009 01/26/2009
Note: Released By: JJOSEPH revision screen enclosure submittals and location
PLLA COMPLETE 01/21/2009 01/22/2009
Note: Released By: WBUTLER
ELEC HOLD 01/21/2009 01/21/2009
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040194 (Integra Woods Bldg 11 Type 1 @ 555 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
PLUM COMPLETE 01/08/2009 01/08/2009
Note: Released By: FREODICA REVISION: Revised Riser diagrams 1S and 1SA- kitchen sinks from 2" to 1-1/2".
PLUM COMPLETE 12/19/2008 12/22/2008
Note: Released By: FREODICA Revision: Sealed letter concerning washer location.
PLUM COMPLETE 12/19/2008 12/19/2008
Note: Released By: FREODICA Revision: Sealed letter concerning bathtub models (BT-2, BT-1).
BLD COMPLETE 12/18/2008 12/18/2008
Note: Released By: JJOSEPH Revision: Applying Simpson RPS28 Straps.
BLD COMPLETE 12/18/2008 12/18/2008
Note: Released By: FREODICA Revision: 1. Revised clothes dryer exhaust vent and bathroom exhaust layouts for Units C1 and D.
BLD COMPLETE 12/12/2008 12/12/2008
Note: Released By: JJOSEPH Revision:- clarification / modification of a quick tip 3rd floor vault area only
PLUM COMPLETE 12/08/2008 12/08/2008
Note: Released By: FREODICA Revision: Plumbing revision 7 dated 11-26-08.
BLD COMPLETE 11/24/2008 11/24/2008
Note: Released By: JJOSEPH Revision Web removal for AC chase
ZON CANCEL 11/19/2008
BLD COMPLETE 11/06/2008 11/06/2008
Note: Released By: JMCGOWEN revison for trusses
BLD COMPLETE 10/22/2008 10/24/2008
Note: Released By: JJOSEPH Revision Third floor: Removal of columns, cap and flashing details cabinet change/shelving change
PLUM HOLD 10/22/2008 10/24/2008
Note: Held By: FREODICA Revision: Plans shall be signed and sealed by FL. Reg. Engr.
BLD COMPLETE 10/22/2008 10/23/2008
Note: Released By: JJOSEPH REVISION Roofing submittals
BLD COMPLETE 10/22/2008 10/23/2008
Note: Released By: JJOSEPH REVISION code compliant Hardware
DSD HOLD 10/02/2008 10/06/2008
Note: Held By: DRAMIREZ Architectural plans need to be modified. On hold until modification is approved.
BLD COMPLETE 09/22/2008 09/22/2008
Note: Released By: JMONTARULI released by: J Joseph Anchor placement plans that show anchor spacing for all bearing walls
BLD COMPLETE 09/15/2008 09/22/2008
Note: Released By: JJOSEPH Anchor placement plans that show anchor spacing for all bearing walls REVISION
FI1 COMPLETE 07/11/2008 07/14/2008
Note: Released By: JPATTEE
FI1 HOLD 07/02/2008 07/11/2008
Note: Held By: JPATTEE Sheet A5.01 not attached
ELEC COMPLETE 04/11/2008 04/11/2008
Note: Released By: SKNOPF Approved for Release.
FI1 HOLD 04/11/2008 05/06/2008
Note: Held By: JPATTEE 1) Plans do not provide design criteria for automatic fire sprinkler system(s) 2) Unable to locate detail for the rated garage wall and rated floor ceiling.Ok JDP
MECH COMPLETE 04/11/2008 04/11/2008
Note: Released By: FREODICA
PLUM COMPLETE 04/11/2008 04/11/2008
Note: Released By: FREODICA
BLD COMPLETE 04/09/2008 04/11/2008
Note: Released By: FREODICA
DSD COMPLETE 10/24/2008
Note: Released By: DRAMIREZ

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/19/2009
REINSPECTION FEE ¤40.00 05/19/2009
REINSPECTION FEE ¤40.00 05/19/2009
REINSPECTION FEE ¤40.00 05/19/2009
REINSPECTION FEE ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REVISION ¤40.00 05/19/2009
REINSPECTION FEE ¤40.00 05/06/2009
REINSPECTION FEE ¤40.00 05/06/2009
REVISION ¤40.00 01/27/2009
PLAN CHECK FEE ¤3,786.95 07/22/2008
PARKS IMPACT FEE 4/01/08 ¤39,347.20 07/22/2008
PLUMBING FEE ¤2,005.80 07/22/2008
BUILDING CODE ADMIN FUND ¤213.47 07/22/2008
FIRE IMPACT FEE RES 4/01/08 ¤6,089.28 07/22/2008
ELECTRIC FEE ¤2,005.80 07/22/2008
MECHANICAL FEE ¤2,005.80 07/22/2008
PERMIT FEE ¤18,131.50 07/22/2008
RADON FEE ¤213.47 07/22/2008
SCHOOL BOARD IMPACT FEE MULTI ¤29,792.00 07/22/2008
10/07 TRANS MULTI - FAMILY ¤71,243.20 07/22/2008
10/07 TRANS MULTI - FAMILY ¤71,243.20 07/18/2008
BUILDING CODE ADMIN FUND (¤213.47) 07/18/2008
10/07 TRANS MULTI - FAMILY (¤71,243.20) 07/18/2008
RADON FEE ¤213.47 07/18/2008
SCHOOL BOARD IMPACT FEE MULTI ¤29,792.00 07/18/2008
SCHOOL BOARD IMPACT FEE MULTI (¤29,792.00) 07/18/2008
PERMIT FEE ¤18,131.50 07/18/2008
PARKS IMPACT FEE 4/01/08 ¤39,347.20 07/18/2008
PARKS IMPACT FEE 4/01/08 (¤39,347.20) 07/18/2008
PERMIT FEE (¤18,131.50) 07/18/2008
FIRE IMPACT FEE RES 4/01/08 (¤6,089.28) 07/18/2008
FIRE IMPACT FEE RES 4/01/08 ¤6,089.28 07/18/2008
MECHANICAL FEE ¤2,005.80 07/18/2008
MECHANICAL FEE (¤2,005.80) 07/18/2008
BUILDING CODE ADMIN FUND ¤213.47 07/18/2008
ELECTRIC FEE ¤2,005.80 07/18/2008
ELECTRIC FEE (¤2,005.80) 07/18/2008
RADON FEE (¤213.47) 07/18/2008
PLAN CHECK FEE (¤3,786.95) 07/18/2008
PLAN CHECK FEE ¤3,786.95 07/18/2008
PLUMBING FEE ¤2,005.80 07/18/2008
PLUMBING FEE (¤2,005.80) 07/18/2008
Fees Total Due: ¤0.00 Total Paid: ¤175,954.47