I want to search for...
Permit #2008040200
Permit Details
Status: COED
| Parcel Id: 31-12-31-5371-00000-0040 |
| CONDITIONED SPACE: 30040 sqft |
| OPENED PORCH (WITH ROOF) : 2476 sqft |
| OPENED PORCH (WITH ROOF) : 6286 sqft |
| GARAGE: 3892 sqft |
| Total Square Footage: 42694 sqft |
| Block: 00000 |
| Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION |
| Job Phone: 386-586-0781 |
| Location Address: 700 SHADY OAKS DR |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 08/15/2008 |
| NOC: RECORDED |
| Applicant name: JAMES G PYLE |
| Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE |
|
Address #307 PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤1,882,433.00 |
| Job Description: BUILDING 17- TYPE 1 (3 FLOORS, 32 APT. UNITS) SP-MAJ-07-06 FOR "INTEGRA WOODS" |
| Type: CN |
Contractor
LANDSOUTH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1680 THE GREENS WAY JACKSONVILLE , FL 32277 |
CBC035104 (Exp: 08/31/2010) | 386-586-0781 | 386-586-2805 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
NINO JOE PARRALES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6824 PHILLIPS PKWY DR. S JACKSONVILLE , FL 32256 |
CAC057164 (Exp: 08/31/2010) | (904)346-1774 | (904)346-4788 |
STEPHEN JOHN CHASTAIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1923 TAMPA EAST BLVD TAMPA, FL 33619 |
CFC024520 (Exp: 08/31/2012) | (813)246-5341 | (813)246-5345 |
FRED M POMAR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1025 6TH STREET DAYTONA BEACH, FL 32117 |
CCC1328140 (Exp: 08/31/2010) | (386)255-6113 | (386)254-8816 |
Inspection History
| Type | Request Date | Result | Inspector |
| COMMERCIAL BUILDING FINAL | 06/30/2009 | APPROVED | JHINDMAN |
| FINAL COMPLETE BUILDING INSPECTION | 06/30/2009 | FINAL APPROVED | JHINDMAN |
| UTILITY COMMERCIAL FINAL | 06/26/2009 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 06/26/2009 | APPROVED | KKING |
| H.V.A.C. FINAL | 06/26/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. FINAL | 06/24/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 6/24/2009 2:51:08 PM SYSTEM IS NOT COMPLETE, OUTSIDE RIGHT HAND UNITS ARE NOT THE UNITS FOR THE PROPER APARTMENTS. NOT READY. | |||
| ELECTRICAL FINAL | 06/22/2009 | APPROVED | JHINDMAN |
| LANDSCAPE FINAL | 06/22/2009 | APPROVED - AS NOTED | WBUTLER |
| Note: Landscape final is approved however there is a punch list that has been bonded that must be completed before the final unit c.o. and prior to the bond release. | |||
| PLUMBING FINAL | 06/19/2009 | APPROVED | JHINDMAN |
| FIRE FINAL | 06/18/2009 | APPROVED | JPATTEE |
| DRIVEWAY | 06/18/2009 | APPROVED | MCOBB |
| ENGINEERING FINAL | 06/18/2009 | APPROVED | MCOBB |
| TRAFFIC ENGINEER | 06/18/2009 | APPROVED | MCOBB |
| COMMERCIAL POWER INSPECTION | 05/29/2009 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 5/29/2009 1:45:20 PM TRI CITY. | |||
| INSULATION INSPECTION | 03/23/2009 | APPROVED | JHINDMAN |
| LATH /BRICK FLASHING | 03/18/2009 | APPROVED | JHINDMAN |
| H.V.A.C. ROUGH | 03/11/2009 | APPROVED | JHINDMAN |
| FRAMING | 03/10/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 03/06/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| SECOND ROUGH PLUMBING INSPECTION | 03/05/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| SECOND ROUGH PLUMBING INSPECTION | 03/03/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Requested at 2/27/2009 1:46:10 PM WATER AND TUBS Inspection Requested at 2/27/2009 2:14:57 PM WATER AND TUBS | |||
| SECOND ROUGH PLUMBING INSPECTION | 03/02/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION Inspection Requested at 2/27/2009 1:46:10 PM WATER AND TUBS Inspection Requested at 2/27/2009 2:14:57 PM WATER AND TUBS | |||
| 2ND ROUGH ELECTRICAL | 03/02/2009 | APPROVED | RMARVEL |
| 2ND ROUGH ELECTRICAL | 02/27/2009 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 2/27/2009 3:38:07 PM PROPERLY INSTALL FAN BOXES. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/20/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. ROUGH | 02/12/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/12/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 2/12/2009 1:29:45 PM TRUSSES R13 AND R38 NEED REPAIR LETTERS. FLOOR TRUSSES IN UNIT 208 DO NOT MEET SPACING REQUIREMENTS OF FLOOR TRUSS REVISION. | |||
| SECOND ROUGH PLUMBING INSPECTION | 02/12/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Requested at 2/11/2009 4:58:17 PM SANITARY ONLY Inspection Resulted at 2/12/2009 1:29:44 PM PARTIAL SANITARY. | |||
| FRAMING | 02/11/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Requested at 2/10/2009 3:25:26 PM TRUSS BRACING Inspection Resulted at 2/11/2009 2:55:56 PM BY JOHN | |||
| FRAMING | 02/10/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ROOF IN PROGRESS | 01/29/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 01/28/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Requested at 1/27/2009 5:40:11 PM WINDOW SCREW OFF Inspection Resulted at 1/28/2009 2:44:44 PM WINDOW ANCHORS | |||
| ROOF IN PROGRESS | 01/23/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| FRAMING | 01/21/2009 | APPROVED | JHINDMAN |
| Note: Inspection Requested at 1/20/2009 1:06:27 PM PARTIAL QUICK TIE | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 01/15/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/12/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Requested at 1/9/2009 4:37:40 PM PARTIAL ROOF SHEATHING ONLY FOR DRY IN Inspection Resulted at 1/12/2009 2:22:43 PM SHEATHING OK | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 01/12/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Requested at 1/9/2009 4:36:23 PM PARTIAL, TO CLOSE INSPECTION HOLES Inspection Resulted at 1/12/2009 2:22:45 PM BREEZEWAYS AND BALCONYS | |||
| FOUNDATION SURVEY APPROVED BY ZONING | 11/21/2008 | APPROVED | DRAMIREZ |
| TEMPORARY POLE | 11/13/2008 | APPROVED | JHINDMAN |
| Note: Robin sent a note requesting this inspection Inspection Resulted at 11/13/2008 3:25:27 PM TRANSFORMER 16300 12 | |||
| TIE DOWN | 11/12/2008 | APPROVED | BBEMBRY |
| Note: letter submitted from engineer regarding the quick tie cables | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 10/21/2008 | APPROVED | JHINDMAN |
| FIRST ROUGH PLUMBING INSPECTION | 10/16/2008 | APPROVED - AS NOTED | JMCGOWEN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 10/16/2008 3:34:17 PM NEED TO HAVE AN ASBUILT PLAN REVISED AND SHOW PLAN ON SLAB INSPECTION. | |||
| FIRST ROUGH PLUMBING INSPECTION | 10/14/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: Inspection Resulted at 10/14/2008 3:52:12 PM NEED TO CORRECT LEAK IN SYSTEM.NEED APPROVED PLANS FOR INSPECTION ON SITE. |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 04/21/2009 | 04/21/2009 |
| Note: Released By: SKNOPF Approved for Release.] Revision: panel schedule changes. | |||
| ELEC | COMPLETE | 03/25/2009 | 03/27/2009 |
| Note: Released By: SKNOPF approved for Release. revisions to panel schedule/site lighting circuit schedule | |||
| MECH | CANCEL | 03/25/2009 | |
| Note: Revision: Air handler tonage changed (Rev. 12, dated 2-23-09.) | |||
| ELEC | COMPLETE | 02/25/2009 | 02/25/2009 |
| Note: Released By: JMCGOWEN Revision site lighting | |||
| BLD | COMPLETE | 02/17/2009 | 02/17/2009 |
| Note: Released By: JMCGOWEN field truss repair | |||
| BLD | COMPLETE | 02/09/2009 | 02/09/2009 |
| Note: Released By: JMCGOWEN Revision Truss repair | |||
| BLD | COMPLETE | 02/09/2009 | 02/09/2009 |
| Note: Released By: JMCGOWEN Revisioin Revision to stair towers/ connections | |||
| BLD | COMPLETE | 02/04/2009 | 02/05/2009 |
| Note: Released By: JJOSEPH truss repair | |||
| ELEC | HOLD | 01/30/2009 | 01/30/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| BLD | COMPLETE | 01/29/2009 | 01/30/2009 |
| Note: Released By: JJOSEPH Revision Truss repair | |||
| MECH | COMPLETE | 01/27/2009 | 01/29/2009 |
| Note: Released By: FREODICA Revision: Specs for dryers in B1, C1, & D units. | |||
| BLD | COMPLETE | 01/26/2009 | 01/26/2009 |
| Note: Released By: JJOSEPH revision screen enclosure submittals and location | |||
| PLLA | COMPLETE | 01/21/2009 | 01/22/2009 |
| Note: Released By: WBUTLER | |||
| ELEC | HOLD | 01/21/2009 | 01/21/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040200 (Integra Woods Bldg 17 Type 1 @ 700 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| PLUM | COMPLETE | 01/08/2009 | 01/08/2009 |
| Note: Released By: FREODICA REVISION: Revised Riser diagrams 1S and 1SA- kitchen sinks from 2" to 1-1/2". | |||
| PLUM | COMPLETE | 12/19/2008 | 12/22/2008 |
| Note: Released By: FREODICA Revision: Sealed letter concerning washer location. | |||
| PLUM | COMPLETE | 12/19/2008 | 12/19/2008 |
| Note: Released By: FREODICA Revision: Sealed letter concerning bathtub models (BT-2, BT-1). | |||
| BLD | COMPLETE | 12/18/2008 | 12/18/2008 |
| Note: Released By: JJOSEPH Revision: Applying Simpson RPS28 Straps. | |||
| MECH | COMPLETE | 12/18/2008 | 12/18/2008 |
| Note: Released By: FREODICA Revision: 1. Revised clothes dryer exhaust vent and bathroom exhaust layouts for Units C1 and D. | |||
| BLD | COMPLETE | 12/12/2008 | 12/12/2008 |
| Note: Released By: JJOSEPH Revision:- clarification / modification of a quick tip 3rd floor vault area only | |||
| PLUM | COMPLETE | 12/08/2008 | 12/08/2008 |
| Note: Released By: FREODICA Revision: Plumbing revision 7 dated 11-26-08. | |||
| BLD | COMPLETE | 11/24/2008 | 11/24/2008 |
| Note: Released By: JJOSEPH Revision Web removal for AC chase | |||
| ZON | CANCEL | 11/19/2008 | |
| BLD | COMPLETE | 11/06/2008 | 11/06/2008 |
| Note: Released By: JMCGOWEN revision for trusses | |||
| PLUM | HOLD | 10/22/2008 | 10/24/2008 |
| Note: Held By: FREODICA Revision: Plans shall be signed and sealed by FL. Reg. Engr. | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION Roofing submittals | |||
| BLD | COMPLETE | 10/22/2008 | 10/24/2008 |
| Note: Released By: JJOSEPH Revision Third floor: Removal of columns, cap and flashing details cabinet change/shelving change | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION code compliant Hardware | |||
| BLD | COMPLETE | 09/22/2008 | 09/22/2008 |
| Note: Released By: JMONTARULI Released by: J Joseph Anchor placement plans that show anchor spacing for all bearing walls | |||
| BLD | COMPLETE | 09/15/2008 | 09/22/2008 |
| Note: Released By: JJOSEPH Anchor placement plans that show anchor spacing for all bearing walls REVISION | |||
| FI1 | COMPLETE | 07/11/2008 | 07/14/2008 |
| Note: Released By: JPATTEE | |||
| FI1 | HOLD | 07/02/2008 | 07/11/2008 |
| Note: Held By: JPATTEE Sheet A5.01 is not attached | |||
| ELEC | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: SKNOPF Approved for Release. | |||
| FI1 | HOLD | 04/11/2008 | 05/06/2008 |
| Note: Held By: JPATTEE 1) Plans do not provide design criteria for automatic fire sprinkler system(s) 2) Unable to locate detail for the rated garage wall and rated floor ceiling Ok JDP | |||
| MECH | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: FREODICA | |||
| BLD | COMPLETE | 04/09/2008 | 04/11/2008 |
| Note: Released By: FREODICA |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REINSPECTION FEE | ¤40.00 | 06/30/2009 |
| REINSPECTION FEE | ¤40.00 | 06/30/2009 |
| REINSPECTION FEE | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 06/30/2009 |
| REVISION | ¤40.00 | 05/13/2009 |
| REINSPECTION FEE | ¤40.00 | 02/09/2009 |
| PLAN CHECK FEE | ¤3,786.95 | 08/15/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤39,347.20 | 08/15/2008 |
| PLUMBING FEE | ¤2,005.80 | 08/15/2008 |
| RADON FEE | ¤213.47 | 08/15/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤29,792.00 | 08/15/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤71,243.20 | 08/15/2008 |
| BUILDING CODE ADMIN FUND | ¤213.47 | 08/15/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤6,089.28 | 08/15/2008 |
| ELECTRIC FEE | ¤2,005.80 | 08/15/2008 |
| MECHANICAL FEE | ¤2,005.80 | 08/15/2008 |
| PERMIT FEE | ¤18,131.50 | 08/15/2008 |
| PERMIT FEE | ¤18,131.50 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤39,347.20 | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | (¤39,347.20) | 07/18/2008 |
| PERMIT FEE | (¤18,131.50) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | (¤6,089.28) | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤6,089.28 | 07/18/2008 |
| MECHANICAL FEE | ¤2,005.80 | 07/18/2008 |
| MECHANICAL FEE | (¤2,005.80) | 07/18/2008 |
| BUILDING CODE ADMIN FUND | ¤213.47 | 07/18/2008 |
| ELECTRIC FEE | ¤2,005.80 | 07/18/2008 |
| ELECTRIC FEE | (¤2,005.80) | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤71,243.20 | 07/18/2008 |
| BUILDING CODE ADMIN FUND | (¤213.47) | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | (¤71,243.20) | 07/18/2008 |
| RADON FEE | ¤213.47 | 07/18/2008 |
| RADON FEE | (¤213.47) | 07/18/2008 |
| PLAN CHECK FEE | (¤3,786.95) | 07/18/2008 |
| PLAN CHECK FEE | ¤3,786.95 | 07/18/2008 |
| PLUMBING FEE | ¤2,005.80 | 07/18/2008 |
| PLUMBING FEE | (¤2,005.80) | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤29,792.00 | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | (¤29,792.00) | 07/18/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤175,954.47 |