Permit #2008040204
Permit Details
Status: COED
| Parcel Id: 31-12-31-5371-00000-0040 |
| CONDITIONED SPACE: 1816 sqft |
| GARAGE: 1968 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 275 sqft |
| Total Square Footage: 4241 sqft |
| Block: 00000 |
| Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION |
| Job Phone: 386-586-0781 |
| Location Address: 725 SHADY OAKS DR |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 08/15/2008 |
| NOC: RECORDED |
| Applicant name: JAMES G PYLE |
| Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE |
|
Address #307 PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤174,714.00 |
| Job Description: BUILDING 14- TYPE 3 A (2 FLOORS, 2 APT. UNITS) SP-MAJ-07-06 FOR "INTEGRA WOODS" |
| Type: CN |
Contractor
LANDSOUTH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1680 THE GREENS WAY JACKSONVILLE , FL 32277 |
CBC035104 (Exp: 08/31/2010) | 386-586-0781 | 386-586-2805 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
NINO JOE PARRALES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6824 PHILLIPS PKWY DR. S JACKSONVILLE , FL 32256 |
CAC057164 (Exp: 08/31/2010) | (904)346-1774 | (904)346-4788 |
STEPHEN JOHN CHASTAIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1923 TAMPA EAST BLVD TAMPA, FL 33619 |
CFC024520 (Exp: 08/31/2012) | (813)246-5341 | (813)246-5345 |
FRED M POMAR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1025 6TH STREET DAYTONA BEACH, FL 32117 |
CCC1328140 (Exp: 08/31/2010) | (386)255-6113 | (386)254-8816 |
Inspection History
| Type | Request Date | Result | Inspector |
| COMMERCIAL BUILDING FINAL | 06/29/2009 | FINAL APPROVED | JHINDMAN |
| LANDSCAPE FINAL | 06/22/2009 | APPROVED - AS NOTED | WBUTLER |
| Note: Landscape final approved but there is a punch list that has been bonded and must be completed prior to the last building c.o. and the release of the bond. | |||
| ENGINEERING FINAL | 06/18/2009 | APPROVED | MCOBB |
| TRAFFIC ENGINEER | 06/18/2009 | APPROVED | MCOBB |
| UTILITY COMMERCIAL FINAL | 06/12/2009 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 06/12/2009 | APPROVED | KKING |
| H.V.A.C. FINAL | 05/14/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ELECTRICAL FINAL | 05/14/2009 | APPROVED | JHINDMAN |
| H.V.A.C. FINAL | 05/11/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 5/11/2009 1:02:09 PM ANCHOR CONDENSER UNITS | |||
| FIRE FINAL | 04/24/2009 | APPROVED | JPATTEE |
| PLUMBING FINAL | 04/23/2009 | APPROVED | JHINDMAN |
| COMMERCIAL POWER INSPECTION | 04/02/2009 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| COMMERCIAL POWER INSPECTION | 04/01/2009 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 4/1/2009 2:43:46 PM MISSING KNOCKOUTS AT PANEL IN APARTMENT. | |||
| UNDERGROUND ELECTRICAL | 03/20/2009 | APPROVED | RMARVEL |
| Note: Inspection Requested at 3/19/2009 3:00:05 PM SITE LIGHTING | |||
| INSULATION INSPECTION | 01/27/2009 | APPROVED | JHINDMAN |
| LATH /BRICK FLASHING | 01/23/2009 | APPROVED | JHINDMAN |
| FRAMING | 01/21/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| SECOND ROUGH PLUMBING INSPECTION | 01/15/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 01/13/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| SECOND ROUGH PLUMBING INSPECTION | 01/13/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| SECOND ROUGH PLUMBING INSPECTION | 01/12/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| H.V.A.C. ROUGH | 01/09/2009 | APPROVED | JHINDMAN |
| 2ND ROUGH ELECTRICAL | 01/08/2009 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| 2ND ROUGH ELECTRICAL | 01/07/2009 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 1/7/2009 3:15:10 PM TORQUE LUGS IN PANEL. | |||
| TEMPORARY POLE | 12/04/2008 | APPROVED | JHINDMAN |
| Note: Inspection Resulted at 12/4/2008 2:01:25 PM CALLED FPL 2:00 P.M. | |||
| FRAMING | 12/04/2008 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Requested at 12/3/2008 5:19:02 PM THIS IS A WINDOW SCREW INSPECTION Inspection Resulted at 12/4/2008 2:01:23 PM WINDOW ANCHORS | |||
| FOUNDATION SURVEY APPROVED BY ZONING | 11/21/2008 | APPROVED | DRAMIREZ |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/21/2008 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ROOF IN PROGRESS | 11/21/2008 | APPROVED | JHINDMAN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/19/2008 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 11/19/2008 3:49:33 PM ROOF SHEATHING ONLY | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/17/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Robin from Landsouth sent a note requesting this inspection Inspection Resulted at 11/17/2008 3:49:48 PM THIS WAS A ROOF SHEATHING INSPECTION, NAIL ARE EMBEDDED TO DEEP INTO OSB. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/12/2008 | APPROVED | JHINDMAN |
| TIE DOWN | 11/12/2008 | APPROVED | BBEMBRY |
| Note: letter submitted from engineer regarding the quick tie cables | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 10/06/2008 | APPROVED | JHINDMAN |
| FIRST ROUGH PLUMBING INSPECTION | 09/24/2008 | APPROVED | PGALLMANN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 04/21/2009 | 04/21/2009 |
| Note: Released By: SKNOPF Approved for Release. Revision: panel schedule changes. | |||
| ELEC | COMPLETE | 03/25/2009 | 03/25/2009 |
| Note: Released By: SKNOPF Approved for Release. Revision to add Site Lighting, adjusted panel schedules and labeled buildings. | |||
| MECH | COMPLETE | 03/25/2009 | 03/25/2009 |
| Note: Released By: FREODICA Revision: Air handler tonage changed (Rev. 12, dated 2-23-09.) | |||
| PLLA | COMPLETE | 03/25/2009 | 03/26/2009 |
| Note: Released By: ECOYNE per Bill Butler | |||
| ELEC | COMPLETE | 02/26/2009 | 02/26/2009 |
| Note: Released By: JMCGOWEN Revision Site lighting | |||
| ELEC | HOLD | 01/30/2009 | 01/30/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| MECH | COMPLETE | 01/27/2009 | 01/29/2009 |
| Note: Released By: FREODICA Revision: Specs for dryers in A3 units. | |||
| BLD | COMPLETE | 01/26/2009 | 01/26/2009 |
| Note: Released By: JJOSEPH screeen enclosure submittals and location | |||
| ELEC | HOLD | 01/21/2009 | 01/21/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040204 (Integra Woods Bldg 14 Type 3A @ 725 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| PLLA | COMPLETE | 01/21/2009 | 01/22/2009 |
| Note: Released By: WBUTLER | |||
| BLD | COMPLETE | 12/18/2008 | 12/18/2008 |
| Note: Released By: JJOSEPH Revision: Applying Simpson RPS28 Straps. | |||
| PLUM | COMPLETE | 12/08/2008 | 12/08/2008 |
| Note: Released By: FREODICA Revision: Plumbing revision 7, dated 11-26-08. | |||
| ZON | CANCEL | 11/19/2008 | |
| BLD | COMPLETE | 11/06/2008 | 11/06/2008 |
| Note: Released By: JMCGOWEN rrevision for trusses | |||
| PLUM | HOLD | 10/22/2008 | 10/23/2008 |
| Note: Held By: FREODICA REVISION 1. Provide (2) sets of plumbing plans, signed and sealed by FL. Registered Engineer. | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION Roofing submittals | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION code compliant Hardware | |||
| BLD | COMPLETE | 09/22/2008 | 09/22/2008 |
| Note: Released By: JMONTARULI Released by: J Joseph Anchor placement plans that show anchor spacing for all bearing walls | |||
| BLD | COMPLETE | 09/15/2008 | 09/22/2008 |
| Note: Released By: JJOSEPH Anchor placement plans that show anchor spacing for all bearing walls REVISION | |||
| FI1 | COMPLETE | 07/02/2008 | 07/11/2008 |
| Note: Released By: JPATTEE | |||
| ELEC | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: SKNOPF Approved for Release. | |||
| FI1 | HOLD | 04/11/2008 | 05/06/2008 |
| Note: Held By: JPATTEE 1) Plans do not provide design criteria for automatic fire sprinkler system(s) 2) Unable to locate detail for the rated garage wall and rated floor ceiling.Ok JDP 3) Sheet A1.32 Detail #1, Is the ridge vent directly over stiarwell fire walls? | |||
| MECH | COMPLETE | 04/10/2008 | 04/11/2008 |
| Note: Released By: JJOSEPH | |||
| PLUM | COMPLETE | 04/10/2008 | 04/11/2008 |
| Note: Released By: JJOSEPH | |||
| BLD | COMPLETE | 04/09/2008 | 04/11/2008 |
| Note: Released By: JJOSEPH |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤60.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REINSPECTION FEE | ¤40.00 | 04/03/2009 |
| REINSPECTION FEE | ¤40.00 | 01/27/2009 |
| REINSPECTION FEE | ¤40.00 | 01/15/2009 |
| RADON FEE | ¤21.21 | 08/15/2008 |
| PLUMBING FEE | ¤186.60 | 08/15/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤2,459.20 | 08/15/2008 |
| PERMIT FEE | ¤1,435.50 | 08/15/2008 |
| PLAN CHECK FEE | ¤300.15 | 08/15/2008 |
| ADMIN FEE | ¤20.00 | 08/15/2008 |
| ELECTRIC FEE | ¤186.60 | 08/15/2008 |
| BUILDING CODE ADMIN FUND | ¤21.21 | 08/15/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤380.58 | 08/15/2008 |
| MECHANICAL FEE | ¤186.60 | 08/15/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤1,862.00 | 08/15/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤4,452.70 | 08/15/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤4,452.70 | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | (¤4,452.70) | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤1,862.00 | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | (¤1,862.00) | 07/18/2008 |
| MECHANICAL FEE | ¤186.60 | 07/18/2008 |
| PERMIT FEE | ¤1,435.50 | 07/18/2008 |
| PERMIT FEE | (¤1,435.50) | 07/18/2008 |
| MECHANICAL FEE | (¤186.60) | 07/18/2008 |
| ELECTRIC FEE | (¤186.60) | 07/18/2008 |
| ELECTRIC FEE | ¤186.60 | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤380.58 | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | (¤380.58) | 07/18/2008 |
| ADMIN FEE | ¤20.00 | 07/18/2008 |
| BUILDING CODE ADMIN FUND | ¤21.21 | 07/18/2008 |
| BUILDING CODE ADMIN FUND | (¤21.21) | 07/18/2008 |
| PLUMBING FEE | (¤186.60) | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | (¤2,459.20) | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤2,459.20 | 07/18/2008 |
| PLAN CHECK FEE | ¤300.15 | 07/18/2008 |
| PLAN CHECK FEE | (¤300.15) | 07/18/2008 |
| PLUMBING FEE | ¤186.60 | 07/18/2008 |
| RADON FEE | ¤21.21 | 07/18/2008 |
| RADON FEE | (¤21.21) | 07/18/2008 |
| ADMIN FEE | (¤20.00) | 07/18/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,172.35 |