Permit #2008040205
Permit Details
Status: COED
| Parcel Id: 31-12-31-5371-00000-0040 |
| CONDITIONED SPACE: 1816 sqft |
| GARAGE: 1968 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 275 sqft |
| Total Square Footage: 4241 sqft |
| Block: 00000 |
| Subdivision: 2138 - SEMINOLE POINTE SUBDIVISION |
| Job Phone: 386-586-0781 |
| Location Address: 745 SHADY OAKS DR |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 08/15/2008 |
| NOC: RECORDED |
| Applicant name: JAMES G PYLE |
| Owner: PALM COAST SEMINOLE GROUP LLC 1 FLORIDA PARK DRIVE |
|
Address #307 PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤174,714.00 |
| Job Description: BUILDING 30- TYPE 3 A (2 FLOORS, 2 APT. UNITS) SP-MAJ-07-06 FOR "INTEGRA WOODS" |
| Type: CN |
Contractor
LANDSOUTH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1680 THE GREENS WAY JACKSONVILLE , FL 32277 |
CBC035104 (Exp: 08/31/2010) | 386-586-0781 | 386-586-2805 |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
NINO JOE PARRALES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6824 PHILLIPS PKWY DR. S JACKSONVILLE , FL 32256 |
CAC057164 (Exp: 08/31/2010) | (904)346-1774 | (904)346-4788 |
STEPHEN JOHN CHASTAIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1923 TAMPA EAST BLVD TAMPA, FL 33619 |
CFC024520 (Exp: 08/31/2012) | (813)246-5341 | (813)246-5345 |
FRED M POMAR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1025 6TH STREET DAYTONA BEACH, FL 32117 |
CCC1328140 (Exp: 08/31/2010) | (386)255-6113 | (386)254-8816 |
Inspection History
| Type | Request Date | Result | Inspector |
| COMMERCIAL BUILDING FINAL | 06/29/2009 | FINAL APPROVED | JHINDMAN |
| LANDSCAPE FINAL | 06/22/2009 | APPROVED - AS NOTED | WBUTLER |
| Note: Landscape final approved however a punch list has been submitted and bonded that must be completed prior to the last building c.o. and prior to the release of the bond. | |||
| ENGINEERING FINAL | 06/18/2009 | APPROVED | MCOBB |
| TRAFFIC ENGINEER | 06/18/2009 | APPROVED | MCOBB |
| UTILITY COMPANY FINAL | 06/15/2009 | APPROVED | KKING |
| UTILITY COMMERCIAL FINAL | 06/12/2009 | APPROVED | KKING |
| H.V.A.C. FINAL | 04/29/2009 | APPROVED | JHINDMAN |
| ELECTRICAL FINAL | 04/29/2009 | APPROVED | RMARVEL |
| ELECTRICAL FINAL | 04/28/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| FIRE FINAL | 04/24/2009 | APPROVED | JPATTEE |
| PLUMBING FINAL | 04/23/2009 | APPROVED | JHINDMAN |
| COMMERCIAL POWER INSPECTION | 04/17/2009 | APPROVED | RMARVEL |
| INSULATION INSPECTION | 03/06/2009 | APPROVED | JHINDMAN |
| LATH /BRICK FLASHING | 03/03/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Requested at 3/2/2009 10:57:33 AM LATHE / FELT PAPER | |||
| SECOND ROUGH PLUMBING INSPECTION | 03/02/2009 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: Inspection Requested at 2/27/2009 1:43:23 PM WATER AND TUBS | |||
| FRAMING | 03/02/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| LATH /BRICK FLASHING | 02/27/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: Kelly called in this inspection Inspection Resulted at 2/27/2009 3:23:41 PM CANCELLED BY JOHN | |||
| SECOND ROUGH PLUMBING INSPECTION | 02/27/2009 | APPROVED | JHINDMAN |
| FRAMING | 02/26/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| H.V.A.C. ROUGH | 02/06/2009 | APPROVED | JHINDMAN |
| 2ND ROUGH ELECTRICAL | 01/08/2009 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| 2ND ROUGH ELECTRICAL | 01/07/2009 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 1/7/2009 3:15:10 PM TORQUE LUGS IN PANEL. | |||
| FRAMING | 12/31/2008 | APPROVED | DROCKWELL |
| Note: Inspection Requested at 12/30/2008 4:36:49 PM WINDOW SCREW INSPECTION Inspection Resulted at 12/31/2008 3:17:32 PM WINDOW FRAME SCREW PATTERN | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/29/2008 | APPROVED - AS NOTED | DROCKWELL |
| Note: THIS IS A REINSPECTION Inspection Requested at 12/23/2008 4:08:48 PM TRUSS BRACES/ENGINEERING REMAINS TO BE VIEWED. Inspection Resulted at 12/29/2008 3:14:07 PM TRUSS ENGINNERING AND BRACING OK.....DR | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/16/2008 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Requested at 12/15/2008 2:38:16 PM QUICK TIE CABLES Inspection Resulted at 12/16/2008 2:41:50 PM CABLE TIES ONLY | |||
| ROOF IN PROGRESS | 12/15/2008 | APPROVED | JHINDMAN |
| Note: Inspection Requested at 12/12/2008 12:11:26 PM DRY IN | |||
| TEMPORARY POLE | 12/04/2008 | APPROVED | JHINDMAN |
| Note: Inspection Resulted at 12/4/2008 2:01:26 PM CALLED FPL 2:00 P.M. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 12/03/2008 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/26/2008 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Requested at 11/25/2008 2:21:11 PM PARTIAL ROOF SHEATHING ONLY FOR DRY IN Inspection Resulted at 11/26/2008 3:34:19 PM NAIL PATTERN ONLY OK TO DRY IN. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/26/2008 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Requested at 11/25/2008 6:34:13 PM PARTIAL, TO CLOSE INSPECTION HOLES Inspection Resulted at 11/26/2008 3:34:19 PM COLUMN TIE DOWNS AND BREEZE WAY SHEATHING ONLY. | |||
| FOUNDATION SURVEY APPROVED BY ZONING | 11/21/2008 | APPROVED | DRAMIREZ |
| TIE DOWN | 11/12/2008 | APPROVED | BBEMBRY |
| Note: letter submitted from engineer regarding the quick tie cables | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 10/06/2008 | APPROVED | JHINDMAN |
| FIRST ROUGH PLUMBING INSPECTION | 09/24/2008 | APPROVED | PGALLMANN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 04/21/2009 | 04/21/2009 |
| Note: Released By: SKNOPF Approved for Release. Revision: panel schedule changes. | |||
| ELEC | COMPLETE | 03/25/2009 | 03/25/2009 |
| Note: Released By: SKNOPF Approved for Release. Added Site lighting, revised panel schedules, added building identification. | |||
| MECH | COMPLETE | 03/25/2009 | 03/25/2009 |
| Note: Released By: FREODICA Revision: Air handler tonage changed (Rev. 12, dated 2-23-09.) | |||
| PLLA | COMPLETE | 03/25/2009 | 03/26/2009 |
| Note: Released By: ECOYNE per Bill Butler | |||
| ELEC | HOLD | 01/30/2009 | 01/30/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Integra Woods #2008040172, 2008040174, 2008040177, 2008040181, 2008040182, 2008040183, 2008040184, 2008040185, 2008040186, 2008040187, 2008040188, 2008040189, 2008040190, 2008040191, 2008040192, 2008040193, 2008040194, 2008040195, 2008040198, 2008040200, 2008040202, 2008040203, 2008040204, 2008040205 1/30/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. This plan sheet shows circuits P-1, 2, 3, 4 and 6 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. b. This plan sheet shows circuit TC-2 for unknown type and quantities of landscape lights. Identify lighting fixtures and provide fixture locations on site plan. Identify Fixture loads and voltage for Load Calculation verification. c. A total of 4000W of fixture load is shown on a 1P20A circuit breaker on circuit HP3-10. Panel schedule shows an 1100W total load for both HP3-10 and HP3-11. Revise. d. A total of 3900W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-20. Panel schedule shows a 2800W total load for 3 circuits, HP1-20, 22, and 24. Revise. e. A total of 2700W of fixture load is shown on a 1P20A circuit breaker on circuit HP2-17. Revise. f. A total of 4100W of fixture load is shown on a 1P20A circuit breaker on circuit HP1-22. Revise. g. Circuit HP2-17 thru 19 is shown as Bldg/Site lights in panel schedule, but HP2-19 does not appear on E1.01 Site Plan. Coordinate. 2. E1.91: a. Compactor Power Riser Diagram shows #6 grounding electrode conductor for a #250 Aluminum service feeder. Revise grounding electrode conductor on this sheet per NEC Table 250.66 and Grounding Electrode Table on Sheet E6.02. b. Identify HP for garage door opener circuit S-3 and GP-1, 2. Panel shows load is only 500W per motor, which would make motor smaller than 1/4HP. Confirm HP size for motor and provide load in panel schedule per NEC Table 430.248. c. Mail Kiosk Detail 1 does not identify circuit number or which Clubhouse Panel the Mail Kiosk lighting is fed from. E6.01 Clubhouse panel schedules also do not reflect Mail Kiosk lighting. Revise. d. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L1E is 2P60A on circuit C1-2:4. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. e. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L2I is 2P60A on circuit C1-6:8. Panel Schedule on E6.01 has a 2P35A circuit breaker for this unit. Resolve conflict. f. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L3 is 2P60A with a 5.7KVA load on circuit C1-10:12. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. g. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L5 is 2P60A with a 5.7KVA load on circuit C2-6:8. Panel Schedule on E6.01 has a 2P50A circuit breaker with a 6.6KVA load for this unit. Resolve conflict. h. Equipment Schedule on ME1.43 shows circuit breaker size for CU-L4 is 2P60A on circuit C2-35:37. Panel Schedule on E6.01 has a 2P50A circuit breaker for this unit. Resolve conflict. i. Equipment Schedule ME1.43 still shows HVAC unit PTHP1 on a 2P60A circuit breaker on C2-2:4. Panel schedule C2 now shows this circuit as blank. If PTHP1 is no longer an HVAC unit on this building, delete unit from equipment schedule and submit revised drawings. Resolve conflict. j. Revise loads for circuit GP-3, 4 which are undersized in panel schedule. 3. E6.01 and E1.01: Clarify how (1) 2P40A circuit breaker on circuit HP1-16:18 is protecting feeders to (2) MLO sub-panels, "GP" and "S", in accordance with NEC 240.21(B)(5). 4. E6.02: a. Clubhouse Service Calculation - revise loads for panels in load calculation to match Demand Loads calculated in Panel Schedules on Sheet E6.01. b. Indicate which House Panel is associated with each Load Calculation for Meter Centers A & B, Bldg. Types 1, 2, and 3. Also indicate building number where each Meter Center is located. c. Revise Demand Load Calculations for Meter Centers A & B, Buildings 1, 2, and 3 to reflect Demand Load, not Connected Loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| MECH | COMPLETE | 01/27/2009 | 01/29/2009 |
| Note: Released By: FREODICA Revision: Specs for dryers in A2 units. | |||
| BLD | COMPLETE | 01/26/2009 | 01/26/2009 |
| Note: Released By: JJOSEPH screeen enclosure submittals and locations | |||
| PLLA | COMPLETE | 01/21/2009 | 01/22/2009 |
| Note: Released By: WBUTLER | |||
| ELEC | HOLD | 01/21/2009 | 01/21/2009 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2008040205 (Integra Woods Bldg 30 Type 3A @ 745 Shady Oaks Dr.) 1/21/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. E1.01: a. Information on Sheet E1.01 regarding Electrical service feeders from FPL transformers has been deleted from this plan sheet. Reinsert this information back on this sheet. b. Identify panel circuits on plan sheet and provide revised House panel schedules with updated load calculations. c. Identify Bldg # on Site Plan for Building #30. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| BLD | COMPLETE | 12/18/2008 | 12/18/2008 |
| Note: Released By: JJOSEPH Revision: Applying Simpson RPS28 Straps. | |||
| PLUM | COMPLETE | 12/08/2008 | 12/08/2008 |
| Note: Released By: FREODICA Revision: Plumbing revision 7, dated 11-26-08. | |||
| ZON | CANCEL | 11/19/2008 | |
| BLD | COMPLETE | 11/06/2008 | 11/06/2008 |
| Note: Released By: JMCGOWEN rvision trusses | |||
| FD1 | CANCEL | 10/24/2008 | |
| Note: correction | |||
| PLUM | HOLD | 10/22/2008 | 10/23/2008 |
| Note: Held By: FREODICA REVISION 1. Provide (2) sets of plumbing plans, signed and sealed by FL. Registered Engineer. | |||
| BLD | COMPLETE | 10/22/2008 | 10/23/2008 |
| Note: Released By: JJOSEPH REVISION code compliant Hardware | |||
| BLD | COMPLETE | 09/22/2008 | 09/22/2008 |
| Note: Released By: JMONTARULI Released by: J Joseph Anchor placement plans that show anchor spacing for all bearing walls | |||
| BLD | COMPLETE | 09/15/2008 | 09/22/2008 |
| Note: Released By: JJOSEPH Anchor placement plans that show anchor spacing for all bearing walls REVISION | |||
| FI1 | COMPLETE | 07/02/2008 | 07/11/2008 |
| Note: Released By: JPATTEE | |||
| ELEC | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: SKNOPF Approved for Release. | |||
| FI1 | HOLD | 04/11/2008 | 05/06/2008 |
| Note: Held By: JPATTEE 1) Plans do not provide design criteria for automatic fire sprinkler system(s) 2) Unable to locate detail for the rated garage wall and rated floor ceiling.Ok JDP 3) Sheet A1.32 Detail #1, Is the ridge vent directly over stiarwell fire walls? | |||
| MECH | COMPLETE | 04/10/2008 | 04/11/2008 |
| Note: Released By: JJOSEPH | |||
| PLUM | COMPLETE | 04/10/2008 | 04/11/2008 |
| Note: Released By: JJOSEPH | |||
| BLD | COMPLETE | 04/09/2008 | 04/11/2008 |
| Note: Released By: JJOSEPH |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤60.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REVISION | ¤40.00 | 06/29/2009 |
| REINSPECTION FEE | ¤40.00 | 01/27/2009 |
| 10/07 TRANS MULTI - FAMILY | ¤4,452.70 | 08/15/2008 |
| PLUMBING FEE | ¤186.60 | 08/15/2008 |
| RADON FEE | ¤21.21 | 08/15/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤1,862.00 | 08/15/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤2,459.20 | 08/15/2008 |
| PERMIT FEE | ¤1,435.50 | 08/15/2008 |
| PLAN CHECK FEE | ¤300.15 | 08/15/2008 |
| ADMIN FEE | ¤20.00 | 08/15/2008 |
| ELECTRIC FEE | ¤186.60 | 08/15/2008 |
| BUILDING CODE ADMIN FUND | ¤21.21 | 08/15/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤380.58 | 08/15/2008 |
| MECHANICAL FEE | ¤186.60 | 08/15/2008 |
| MECHANICAL FEE | ¤186.60 | 07/18/2008 |
| PERMIT FEE | ¤1,435.50 | 07/18/2008 |
| PERMIT FEE | (¤1,435.50) | 07/18/2008 |
| MECHANICAL FEE | (¤186.60) | 07/18/2008 |
| ELECTRIC FEE | (¤186.60) | 07/18/2008 |
| ELECTRIC FEE | ¤186.60 | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | ¤380.58 | 07/18/2008 |
| FIRE IMPACT FEE RES 4/01/08 | (¤380.58) | 07/18/2008 |
| ADMIN FEE | ¤20.00 | 07/18/2008 |
| BUILDING CODE ADMIN FUND | ¤21.21 | 07/18/2008 |
| BUILDING CODE ADMIN FUND | (¤21.21) | 07/18/2008 |
| PLUMBING FEE | (¤186.60) | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | (¤2,459.20) | 07/18/2008 |
| PARKS IMPACT FEE 4/01/08 | ¤2,459.20 | 07/18/2008 |
| PLAN CHECK FEE | ¤300.15 | 07/18/2008 |
| PLAN CHECK FEE | (¤300.15) | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | ¤1,862.00 | 07/18/2008 |
| SCHOOL BOARD IMPACT FEE MULTI | (¤1,862.00) | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | (¤4,452.70) | 07/18/2008 |
| ADMIN FEE | (¤20.00) | 07/18/2008 |
| PLUMBING FEE | ¤186.60 | 07/18/2008 |
| RADON FEE | ¤21.21 | 07/18/2008 |
| RADON FEE | (¤21.21) | 07/18/2008 |
| 10/07 TRANS MULTI - FAMILY | ¤4,452.70 | 07/18/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,972.35 |