I want to search for...

Permit #2008040512

Permit Details

Status: COED

Parcel Id: 27-11-30-0125-00000-0420
CONDITIONED SPACE: 2855 sqft
GARAGE: 439 sqft
OPENED PORCH (WITH ROOF) : 100 sqft
OPENED PORCH (WITH ROOF) : 83 sqft
Total Square Footage: 3477 sqft
Block: RP0I3
Subdivision: 2092 - Avalon at Lehigh Woods
Job Phone: (407)587-3531
Location Address: 44 ROLLINS LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/30/2008
NOC: RECORDED
Applicant name: GEORGE OLIVER GLANCE III
Owner: KB HOME JACKSONVILLE LLC

Address

10475 FORTUNE PKWY

JACKSONVILLE, FL 32256

Address

SUITE 100

JACKSONVILLE, FL 32256

Lot: 42
Contracted Stated Job Value: ¤261,940.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

KB HOME ORLANDO, LLC.
Status Location Address State License Number Phone Fax
CANCEL

9102 SOUTHPARK CENTER LOOP # 200

ORLANDO, FL 32819

CBC051212 (Exp: 08/31/2010) (407)587-3531 (407)587-2333

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone Fax
CANCEL

531 CODISCO WAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2018) (407)333-2665 (407)585-1002
EDWARD DOUGLAS TENNANT
Status Location Address State License Number Phone Fax
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

ST. AUGUSTINE , FL 32092

CAC1813372 (Exp: 08/31/2026) (904)829-8898 (904)829-6587
ROBERT J HAMILTON
Status Location Address State License Number Phone Fax
CANCEL

4601 DARDANELLE DR

ORLANDO, FL 32808

CFC057446 (Exp: 08/31/2010) (407)298-5550 (407)298-6122
GREGORY SCOTT NOLAND
Status Location Address State License Number Phone Fax
CANCEL

1123 CROWN PARK CIRCLE

WINTER GARDEN, FL 34787

CCC057611 (Exp: 08/31/2010) (407)877-2380 (407)877-5936

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 08/06/2008 FINAL APPROVED DROCKWELL
STORMWATER FINAL INSPECTION 08/05/2008 Disapproved -FEE REQUIRED GLALIMA
Note: ALL WATER IS RUNNING ON TO OTHER PROPERTY RIGHT . WATER FROM # 44 ROLLINS LANE NEEDS TO GO TO THE FRONT ON # 44 ROLLINS , NOT# 42 ROLLINS I WENT OVER THIS WITH G M DAYS BE FOR FINAL STORMWATER. ALL SO WOULD LIKE TO SET UP A SITE MEET SO THAT CITY AND BUILDER HAS SAME UNDER STANDING OF DRAINAGE AND EROSION CONTROL. THANK YOU GARY LALIMA CITY OF PALM COAST STORMWATER.
STORMWATER FINAL INSPECTION 08/05/2008 APPROVED - AS NOTED GLALIMA
Note: THIS IS A REINSPECTION SAME DAY REINSPECTION / NEED TO SWEEP CULVERT AT ROAD , SAND AND TRASH
UTILITY COMPANY FINAL 07/29/2008 APPROVED MBACON
RESIDENTIAL EARLY POWER 07/29/2008 APPROVED RMARVEL
Note: THIS IS A REINSPECTION DEL AIR
RESIDENTIAL EARLY POWER 07/28/2008 Disapproved -FEE REQUIRED RMARVEL
Note: ALL COVER PLATES NEED TO BE INSTALLED AT TIME OF INSPECTION.( WHOLE KITCHEN)
TUG ELECTRIC 07/18/2008 APPROVED RMARVEL
Note: THIS IS A REINSPECTION DEL AIR ELECTRIC.
TUG ELECTRIC 06/27/2008 Disapproved -FEE REQUIRED LHITES
Note: NEED TO FIX GROUND CONDUCTOR
LATH /BRICK FLASHING 06/27/2008 APPROVED MMOORE
INSULATION INSPECTION 06/19/2008 APPROVED MMOORE
ALL ROUGH 06/16/2008 APPROVED MMOORE
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 06/11/2008 APPROVED MMOORE
EXTERIOR WALL SHEATHING/SHEAR WALL 06/06/2008 APPROVED MMOORE
LINTEL 05/28/2008 APPROVED MMOORE
FOUNDATION SURVEY APPROVED BY STORMWATER 05/27/2008 APPROVED LAPTEKAR
FOUNDATION SURVEY APPROVED BY ZONING 05/27/2008 APPROVED BBARTON
MONOLITHIC SLAB INSPECTION/SLAB 05/16/2008 APPROVED JLEVRAULT
STORMWATER EROSION CONTROL 05/15/2008 APPROVED GLALIMA
FIRST ROUGH PLUMBING INSPECTION 05/14/2008 APPROVED MMOORE
Note: OK PER MIKE

Review History

Department Status Date In Date Out
BLD COMPLETE 05/23/2008 05/23/2008
Note: Released By: JJOSEPH Adding a new bedroom at the Loft.
BLD HOLD 05/14/2008 05/14/2008
Note: Held By: JJOSEPH 1. Provide wall section details. 2. Provide electric plan and energy calculation sheet. (short form) 3. Indicate the bedroom area.
ZON COMPLETE 04/25/2008 04/25/2008
Note: Released By: BBARTON Correction
BLD COMPLETE 04/25/2008 04/25/2008
Note: Released By: JJOSEPH
SW1 COMPLETE 04/24/2008 04/24/2008
Note: Released By: WKINELL Silt fence required along rear property line. Erosion Control Inspection (119) required. Inspection hold on permit until erosion control inspection .\\wk
ZON HOLD 04/23/2008 04/24/2008
Note: Held By: BBARTON -survey is missing lot square footage

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EARLY POWER INSPECTION ¤40.00 08/08/2008
EARLY POWER INSPECTION ¤40.00 08/08/2008
REINSPECTION FEE ¤40.00 08/08/2008
REINSPECTION FEE ¤40.00 08/08/2008
STORMWATER REINSPECTION FEE ¤35.00 08/08/2008
REVISION ¤80.00 06/04/2008
STORM WATER PERMIT FEES ¤80.00 04/30/2008
TRANS IMPACT FEE 6 - RESIDENTI ¤592.60 04/30/2008
ADMIN FEE ¤20.00 04/30/2008
BUILDING CODE ADMIN FUND ¤17.39 04/30/2008
ELECTRIC FEE ¤205.20 04/30/2008
FIRE IMPACT FEE RES 4/01/08 ¤16.82 04/30/2008
MECHANICAL FEE ¤205.20 04/30/2008
PERMIT FEE ¤1,138.80 04/30/2008
PARKS IMPACT FEE 4/01/08 ¤108.69 04/30/2008
PLAN CHECK FEE ¤116.80 04/30/2008
PLUMBING FEE ¤205.20 04/30/2008
RADON FEE ¤17.39 04/30/2008
Fees Total Due: ¤0.00 Total Paid: ¤2,999.09