Permit #2008060313

Permit Details

Status: FINAL

Parcel Id: 18-11-31-3391-00000-0100
Block: 00000
Subdivision: 1108 - KINGSWOOD CENTER PHASE II
Job Phone: (904)246-7316
Location Address: 400 OLD KINGS RD
Type: GA - GAS
Issue Date: 07/15/2008
NOC: Unknown
Applicant name: TOM FLOYD FITE
Owner: PALM COAST LODGING ASSO LLP

Address

5701 PROGRESS ROAD

INDIANAPOLIS, IN 46241

Lot: 0100
Contracted Stated Job Value: ¤100.00
Job Description: BURY (3) 1000 GALLON TANK ON NORTH SIDE OF BUILDING & RUN PLASTIC LINE TO STUBOUT ON SIDE
Type: CN

Contractor

FERRELLGAS
Status Location Address State License Number Phone Fax
CANCEL

922 SOUTH 9TH STREET

JACKSONVILLE, FL 32250

00838 (Exp: 08/31/2011) (904)246-7316 (904)249-0719

Inspection History

Type Request Date Result Inspector
GAS FINAL 11/20/2008 FINAL APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Requested at 11/19/2008 3:25:07 PM DOMES HAVE BEEN REPLACED
GAS FINAL 11/17/2008 Disapproved -FEE REQUIRED JHINDMAN
Note: REQUESTED BY CHARLES BROWN Inspection Resulted at 11/17/2008 3:49:44 PM 1. TANK VALVES ARE BURIED. 2. TWO OF THE THREE TANKS ARE MISSING COVERS.
GAS ROUGH 07/24/2008 APPROVED PGALLMANN
Note: called by contractor

Review History

Department Status Date In Date Out
BLD COMPLETE 07/01/2008 07/02/2008
Note: Released By: JMCGOWEN Correction Gas piping from tanks to bldg "stub out" to be approx 125 Gas piping material to be 1" poly installed @ a depth of 18" presure of 1016 from tanks to bldg. Appliances connected...
BLD HOLD 06/27/2008 06/27/2008
Note: Held By: JMCGOWEN provide gas riser detail to include pipe size and pressure, and to what the gas line will be run to.
ZON COMPLETE 06/27/2008 06/27/2008
Note: Released By: ECOYNE
PLLA COMPLETE 06/23/2008 06/27/2008
Note: Released By: ECOYNE Bill Butler signed off on location
ZON HOLD 06/18/2008 06/19/2008
Note: Held By: ECOYNE need setback information on site plan - route to landscape architect need building plans

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 11/19/2008
PLUMBING FEE ¤30.06 07/15/2008