I want to search for...
Permit #2008060329
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7012-00030-1210 |
| Total Square Footage: 855 sqft |
| Block: 00030 |
| Subdivision: - |
| Job Phone: (386)931-1183 |
| Location Address: 14 BARRING PL |
| Type: PO - POOL |
| Issue Date: 07/02/2008 |
| NOC: Unknown |
| Applicant name: JASON EUGENE SLESSER |
| Owner: YVROSE, JEAN |
|
Address PO BOX 2595 BUNNEL, FL 32137 |
| Lot: 1210 |
| Contracted Stated Job Value: ¤21,000.00 |
| Job Description: POOL W/SCREEN ENCLOSURE |
| Type: CN |
Contractor
SLESSER POOLS INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P. O. Box 2595 Bunnell, FL 32110 |
CPC1456546 (Exp: 08/31/2022) | (386)931-1183 | 386-437-6470 |
Sub Contractors
COBEY SCOTT WETHERBY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
POST OFFICE BOX 2521 BUNNELL, FL 32110 |
EC0002486 (Exp: 08/31/2026) | (386) 437-5834 |
JEROME P YELVINGTON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 214698 South Daytona, FL 32119 |
CBCA31974 (Exp: 08/31/2012) | 386-547-1349 | (386)304-9603 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL - FINAL | 02/24/2009 | FINAL APPROVED | ACOOPER |
| ELEC & ALARM | 02/23/2009 | APPROVED | ACOOPER |
| STORMWATER FINAL INSPECTION | 12/31/2008 | CANCELLED BY INSPECTOR | WKINELL |
| Note: Stormwater Final Inspection already approved on 12/30/08.\\wk | |||
| STORMWATER FINAL INSPECTION | 12/30/2008 | APPROVED | DRANDALL |
| FOUNDATION SURVEY APPROVED BY ZONING | 12/29/2008 | APPROVED | ECOYNE |
| POOL DECK INSPECTION | 09/26/2008 | APPROVED | ACOOPER |
| STEEL & GROUND | 07/03/2008 | APPROVED | ACOOPER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/28/2009 | 01/28/2009 |
| Note: Released By: JJOSEPH revision - delete gas from permit | |||
| ZON | HOLD | 10/23/2008 | 10/22/2008 |
| Note: Held By: BBARTON -PLEASE REMOVE TANK THAT IS SHOWING ON SURVEY AND OR SPECIFY WHY IT IS THERE -DOES WALKWAY CONNECT TO DRIVEWAY emailed and faxed hold comments to contractor 10/22/08 @ 4:24 pm emailed and faxed hold comments to contractor 12/16/08 @ 7:47 am | |||
| ZON | COMPLETE | 10/22/2008 | 10/22/2008 |
| Note: Released By: ECOYNE | |||
| BLD | COMPLETE | 06/30/2008 | 06/30/2008 |
| Note: Released By: JMCGOWEN | |||
| BLD | HOLD | 06/27/2008 | 06/27/2008 |
| Note: Held By: FREODICA 1. Clarify if the spa requires gas heating. If it does, provide the following: a. Gas sub-contractor to be listed on permit application. b. Gas tank location on site plan, indicate capacity and whether tank is underground or above ground. c. Gas riser diagram showing pipe size, material, gas delivery pressure, BTUs and approximate total lenght of pipe run from tank to spa heater. | |||
| SW1 | COMPLETE | 06/26/2008 | 06/27/2008 |
| Note: Released By: WKINELL | |||
| ZON | COMPLETE | 06/26/2008 | 06/26/2008 |
| Note: Released By: ECOYNE | |||
| ZON | HOLD | 06/19/2008 | 06/20/2008 |
| Note: Held By: BBARTON -pool diagram missing width dimension emailed contractor 06/20/08 @ 8:32am |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 02/23/2009 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/02/2008 |
| ARC POOL/SCREEN REVIEW | ¤50.00 | 07/02/2008 |
| ELECTRIC FEE | ¤49.20 | 07/02/2008 |
| PERMIT FEE | ¤192.00 | 07/02/2008 |
| PLAN CHECK FEE | ¤40.00 | 07/02/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤451.20 |