Permit #2008060333
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7014-00020-1810 |
| Block: 00020 |
| Subdivision: - |
| Job Phone: (386)445-7466 |
| Location Address: 11 COLLINGWOOD LN |
| Type: SW - SEAWALL |
| Issue Date: 06/30/2008 |
| NOC: RECORDED |
| Applicant name: KEN ERIKSEN |
| Owner: BEAN, W SCHAFER- TRUSTEE |
|
Address 13 COLLINGWOOD LANE PALM COAST, FL 32137 |
| Lot: 1810 |
| Contracted Stated Job Value: ¤9,000.00 |
| Job Description: 60 FT STEEL REINFORCED CONCRETE SEAWALL |
| Type: CN |
Contractor
ERIKSEN MARINE CONSTRUCTION, INC.
| Status | Location Address | Phone | Fax |
| CANCEL |
P.O. BOX 352918 PALM COAST, FL 32135 |
(386)445-7466 | (386)445-0926 |
Inspection History
| Type | Request Date | Result | Inspector |
| LANDSCAPE FINAL | 02/26/2009 | FINAL APPROVED | PARENA |
| Note: THIS IS A REINSPECTION 2/26/09 (PA) - SOD - SEED AND STRAW INSTALLED | |||
| STORMWATER FINAL INSPECTION | 02/23/2009 | APPROVED | DRANDALL |
| Note: THIS IS A REINSPECTION | |||
| LANDSCAPE FINAL | 02/10/2009 | Disapproved - NO FEE | JBEAUDET |
| Note: 2/10/09 (JB) need to sod 10' back from seawall and seed and straw all bare area of the lot. | |||
| STORMWATER FINAL INSPECTION | 02/10/2009 | Disapproved - NO FEE | DRANDALL |
| Note: place sod 10' wide from seawall, fill in to finish grade befour sod.....seed & straw all exposed earth on entire property.....remove silt fence from seawall 2/10 per MB | |||
| SEA WALL DEADMEN / CAP | 09/12/2008 | APPROVED - AS NOTED | LHITES |
| Note: Inspection Resulted at 9/12/2008 2:25:58 PM MUST PUMP OUT EXCESS WATER BEFORE SETTING CONCRETE | |||
| TURBIDITY BARRIER | 08/08/2008 | APPROVED | DRANDALL |
| PRE CLEARING INSPECTION | 07/15/2008 | APPROVED | JBEAUDET |
| Note: barricades are installed for a parcel clear |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/24/2008 | 06/24/2008 |
| Note: Released By: JMCGOWEN | |||
| ZON | COMPLETE | 06/24/2008 | 06/24/2008 |
| Note: Released By: ECOYNE | |||
| SW1 | COMPLETE | 06/20/2008 | 06/20/2008 |
| Note: Released By: LAPTEKAR Received site plan with seawall added. | |||
| URB | COMPLETE | 06/20/2008 | 06/24/2008 |
| Note: Released By: JBEAUDET received plan showing partial clearing for seawall | |||
| SW1 | COMPLETE | 06/19/2008 | 06/20/2008 |
| Note: Released By: MDEFREITAS Held By: LAPTEKAR Site plan missing the "proposed concrete seawall" location notation. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ARC SEAWALL REVIEW | ¤20.00 | 06/30/2008 |
| PERMIT FEE | ¤54.00 | 06/30/2008 |
| PLAN CHECK FEE | ¤40.00 | 06/30/2008 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/30/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤194.00 |