Permit #2008110224
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7027-00230-0090 |
| Block: 00230 |
| Subdivision: - |
| Job Phone: (386)447-7077 |
| Location Address: 51 WOOD HAVEN DR |
| Type: PA - PATIO/SLAB (STRUCTURAL) |
| Issue Date: 12/15/2008 |
| NOC: Unknown |
| Applicant name: MARK SCHOFIELD |
| Owner: HEMMER LARRY P & DARBI L JONES JTWROS |
|
Address 51 WOODHAVEN DRIVE PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤2,000.00 |
| Job Description: NEW CONCRETE WALKWAY ON RIGHT SIDE OF HOME-- REFERENCE EXPIRED 2007090124 |
| Type: CN |
Contractor
STAY HARD CONCRETE
| Status | Location Address | Phone |
| CANCEL |
52 LEE DRIVE PALM COAST, FL 32137 |
(386)447-7077 |
Inspection History
| Type | Request Date | Result | Inspector |
| STORMWATER FINAL INSPECTION | 06/12/2009 | FINAL APPROVED | WKINELL |
| Note: Inspection Requested at 6/11/2009 11:07:13 AM PER MARK | |||
| STORMWATER FINAL INSPECTION | 03/03/2009 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: Affidavit on file regarding easment encroachment. 3/3/09 SITE PLAN MUST SHOW SIDEWALK IN RIGHT LOCATION AT THE POOL . |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 06/05/2009 | 06/05/2009 |
| Note: Released By: ECOYNE | |||
| SW1 | COMPLETE | 06/04/2009 | 06/04/2009 |
| Note: Released By: LAPTEKAR received revised plan with correction sheet notified Mark revision is ready 6/8/09.. | |||
| SW1 | COMPLETE | 04/08/2009 | 04/08/2009 |
| Note: Released By: LAPTEKAR Site plan shows revision of sidewalk | |||
| ZON | COMPLETE | 12/02/2008 | 12/02/2008 |
| Note: Released By: BBARTON location of walkway is approved by stormwater, therefore we are approving location as well | |||
| SW1 | COMPLETE | 12/01/2008 | 12/02/2008 |
| Note: Released By: LAPTEKAR Received affidavit regarding encroachment of the sidewalk into the easment. Approved as noted... sidewalk removal is responsibility of owner if a utility agency requests removal to utilize the 5' blanket easment. Per discussion with MB. | |||
| SW1 | HOLD | 11/21/2008 | 11/21/2008 |
| Note: Held By: LAPTEKAR Need length of side walk on site plan. Side walk is in the 5' utility easment (already poured // expired permit) 11/21/08 left message on phone for contractor | |||
| ZON | HOLD | 11/19/2008 | 11/19/2008 |
| Note: Held By: BBARTON can not write in pencil, please use pen provide length of walkway walkway can not be in 5' Utility Easement |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/11/2009 |
| PERMIT FEE | ¤20.00 | 12/15/2008 |
| SITE PLAN 20 | ¤20.00 | 12/15/2008 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/15/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤155.00 |