Permit #2008120087
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-1090-00000-00B0 |
| Total Square Footage: 0 sqft |
| Subdivision: 1228 - SOUTHWEST QUADRANT |
| Job Phone: (386)252-5555 |
| Location Address: 160 CYPRESS POINT PKWY |
| Type: GA - GAS |
| Issue Date: 01/27/2009 |
| NOC: Unknown |
| Applicant name: GEOFRRY DEFOREST |
| Owner: ASNACO LLC |
|
Address C/O INTERSTATE HOLDINGS INC LAKE MARY, FL 32746 |
|
Address 1307 S INTERNATIONAL PKWY SUITE 2051 LAKE MARY, FL 32746 |
| Contracted Stated Job Value: ¤1,000.00 |
| Job Description: BLDG. A -- UNIT 106 INSTALL 1000 UNDERGROUND TANK FOR "EL POTOSI" |
| Type: CN |
Contractor
AMERIGAS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
411 6TH STREET HOLLY HILL, FL 32117 |
01612 (Exp: 08/31/2010) | (386)252-5555 | (386)255-6657 |
Inspection History
| Type | Request Date | Result | Inspector |
| LANDSCAPE FINAL | 03/16/2009 | FINAL APPROVED | WBUTLER |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 03/13/2009 | APPROVED | JHINDMAN |
| Note: Inspection Resulted at 3/13/2009 3:43:26 PM FINAL OK BUT LANDSCAPE HAS NOT PASSED. OK TO 99 AFTER IT PASSES. | |||
| LANDSCAPE FINAL | 03/13/2009 | PARTIALLY APPROVED | WBUTLER |
| Note: requested by MARTHA It was noted in the permit that prior to final the loose dirt needs to be removed from the top of the rootball of the holly tree and the tree saucer mulched. Also, it appears that the irrigation line in the area was broken or otherwise compromised, as the zone did not run in the area of the tree and one head was clogged. Need to excavate to find the problem, clean and adjust the heads and run the system. Suggest contacting the irrigation maintenance contractor for the development to do this. WMB | |||
| GAS ROUGH | 03/05/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| GAS ROUGH | 02/17/2009 | APPROVED - AS NOTED | JHINDMAN |
| Note: Inspection Resulted at 2/17/2009 3:14:29 PM WILL CHECK BONDING OF GAS LINE AT FINAL. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/10/2009 | 03/10/2009 |
| Note: Released By: JMCGOWEN relocate underground tank | |||
| PLLA | COMPLETE | 03/10/2009 | 03/11/2009 |
| Note: Released By: ECOYNE ok Bill Butler | |||
| ZON | COMPLETE | 03/06/2009 | 03/10/2009 |
| Note: Released By: ECOYNE need location of UG tank on site plans with setback information from property line and building ecoyne called contractor 03/06/09 spoke with | |||
| ZON | COMPLETE | 03/03/2009 | 03/03/2009 |
| Note: Released By: ECOYNE no change in location - reduce UG tank size from 1,000 to 250 gal | |||
| MECH | COMPLETE | 03/03/2009 | 03/03/2009 |
| Note: Released By: JMCGOWEN change 1000 gal underground tank to a 250 gal underground tank, same location | |||
| ZON | HOLD | 02/27/2009 | 03/02/2009 |
| Note: Held By: ECOYNE putting in 2500g instead of 1000 ug running 60' 3/4" poly piping location has changed per contractor - require site plan location for approval fax 386-2556657 03/02/09 9:11 am ecoyne | |||
| BLD | COMPLETE | 01/21/2009 | 01/21/2009 |
| Note: Released By: FREODICA | |||
| BLD | HOLD | 12/29/2008 | 12/29/2008 |
| Note: Held By: FREODICA 1. Submitted correction does not address the previous comment on the total gas consumption per hr and therefore can not verify the required pipe size. 2. Additional correction was submitted showing the piping layout inside the building using an approved stamped copy of a different permit number which is not allowed. Provide a separate layout or gas riser diagram showing all the information from previous layout PLUS the total gas consumption or load in BTU/HR in order to process the permit application. | |||
| BLD | HOLD | 12/12/2008 | 12/12/2008 |
| Note: Held By: FREODICA 1. Provide the total gas load comsumption in BTU/HR. | |||
| ZON | COMPLETE | 12/12/2008 | 12/12/2008 |
| Note: Released By: ECOYNE | |||
| ZON | HOLD | 12/04/2008 | 12/03/2008 |
| Note: Held By: ECOYNE need setback information from building as well as property line | |||
| PLLA | COMPLETE | 12/03/2008 | 12/05/2008 |
| Note: Released By: BBARTON Completed per Bill Butler Contractor must meet with Bill prior to installation of tank. faxed comment to contractor 12/05/08 @ 6:51 am | |||
| ENGIN1 | COMPLETE | 03/11/2009 | |
| Note: Released By: AWEBB |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 03/11/2009 |
| REVISION | ¤40.00 | 03/11/2009 |
| SITE PLAN 20 | ¤20.00 | 01/27/2009 |
| PERMIT FEE | ¤20.00 | 01/27/2009 |
| PLAN REVIEW 25 | ¤25.00 | 01/27/2009 |
| PLUMBING FEE | ¤60.60 | 01/27/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤205.60 |