Permit #2009030089
Permit Details
Status: COED
| Parcel Id: 06-12-31-5825-00000-0090 |
| COMMERCIAL SQUARE FOOTAGE: 8070 sqft |
| Total Square Footage: 8070 sqft |
| Subdivision: 2088 - TOWN CENTER |
| Job Phone: (386)677-8736 |
| Location Address: 145 CITY PL |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 04/29/2009 |
| NOC: RECORDED |
| Applicant name: LEONARD MARINACCO |
| Owner: CITY CENTRE OF PALM COAST, INC. |
|
Address 4B OLD KINGS RD NORTH PALM COAST, FL 32137 |
| Lot: 9 |
| Contracted Stated Job Value: ¤325,000.00 |
| Job Description: SUITE 300-- INTERIOR OFFICE BUILDOUT |
| Type: CN |
Contractor
BOMAR CONSTRUCTION INC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
27 S ORCHARD STREET ORMOND BEACH, FL 32174 |
CGC015648 (Exp: 08/31/2022) | (386)677-8736 | (386)677-7726 |
Sub Contractors
MATTHEW JOHN WITTWER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
231 JEAN STREET DAYTONA BEACH, FL 32114 |
EC0002058 (Exp: 08/31/2026) | (386)255-1418 | (386)255-3429 |
DONALD G MEYER
| Status | Location Address | State License Number | Phone |
| CANCEL |
P. O. Drawer 730008 Ormond Beach, FL 32174 |
CAC039739 (Exp: 08/31/2016) | (386) 253-7774 |
ISAAC WALTER JOHNSTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
887 BRENTWOOD DRIVE Daytona Beach, FL 32117 |
CFC023634 (Exp: 08/31/2026) | (386) 252-7047 |
Inspection History
| Type | Request Date | Result | Inspector |
| UTILITY COMPANY FINAL | 10/22/2009 | FINAL APPROVED | DSPENCER |
| UTILITY COMMERCIAL FINAL | 10/21/2009 | APPROVED | DSPENCER |
| FINAL COMPLETE BUILDING INSPECTION | 10/21/2009 | APPROVED | CMINI |
| H.V.A.C. FINAL | 10/07/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ELECTRICAL FINAL | 10/06/2009 | APPROVED | RMARVEL |
| FIRE FINAL | 10/02/2009 | APPROVED | JPATTEE |
| H.V.A.C. FINAL | 09/28/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| PLUMBING FINAL | 09/28/2009 | APPROVED | JHINDMAN |
| COMMERCIAL POWER INSPECTION | 09/17/2009 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 9/17/2009 3:16:34 PM POWER FOR FEEDERS ON UNIT 300. | |||
| ABOVE CEILING | 09/14/2009 | PARTIALLY APPROVED | RMARVEL |
| Note: Inspection Resulted at 9/14/2009 3:23:30 PM ELECTRICAL ONLY. | |||
| ABOVE CEILING | 09/11/2009 | APPROVED - AS NOTED | JHINDMAN |
| H.V.A.C. ROUGH | 09/11/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. ROUGH | 07/29/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 7/29/2009 12:41:59 PM OK TO WRAP METEL DUCT. | |||
| FRAMING | 07/22/2009 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 07/20/2009 | APPROVED | JHINDMAN |
| INSULATION INSPECTION | 07/06/2009 | CANCELLED BY INSPECTOR | CMINI |
| FRAMING | 06/25/2009 | CANCELLED BY APPLICANT | CMINI |
| 2ND ROUGH ELECTRICAL | 06/23/2009 | PARTIALLY APPROVED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/23/2009 3:49:10 PM WALLS ONLY. | |||
| 2ND ROUGH ELECTRICAL | 06/19/2009 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 6/19/2009 3:35:08 PM NOT READY. | |||
| SECOND ROUGH PLUMBING INSPECTION | 05/28/2009 | APPROVED | JHINDMAN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 10/01/2009 | 10/01/2009 |
| Note: Released By: SKNOPF plan revisions showing as-built conditions for electric Approved for Release. Revision: Moved Electric panels to different wall same room Moved phone board Moved receptacle in electric room Added 1 each receptacle to circuits 17, 46 and 50. Added disposal in lounge on dedicated circuit. Added multiple phone outlets | |||
| MECH | COMPLETE | 09/09/2009 | 09/10/2009 |
| Note: Released By: JMCGOWEN revision - field modifications | |||
| BLD | COMPLETE | 07/15/2009 | 07/16/2009 |
| Note: Released By: JJOSEPH interior wall & vision lite changes | |||
| FD1 | COMPLETE | 07/14/2009 | 07/15/2009 |
| Note: Released By: JPATTEE | |||
| MECH | COMPLETE | 04/24/2009 | 04/24/2009 |
| Note: Released By: FREODICA plan review comment corrections | |||
| PLUM | COMPLETE | 04/09/2009 | 04/09/2009 |
| Note: Released By: FREODICA | |||
| BLD | COMPLETE | 04/08/2009 | 04/08/2009 |
| Note: Released By: JJOSEPH provide plan review comments changes | |||
| MECH | HOLD | 04/08/2009 | 04/09/2009 |
| Note: Held By: FREODICA 1. Provide an approved and tested drywell. | |||
| UD1 | COMPLETE | 03/16/2009 | 03/17/2009 |
| Note: Released By: CJOHNSON | |||
| FI1 | COMPLETE | 03/13/2009 | 03/16/2009 |
| Note: Released By: JPATTEE Sheet E-1 detail 2 indicates fire alarm horn/strobe paint to match wall. Device cannot be painted except by manufacturer. Fire alarm installation shall be a separate permit. | |||
| MECH | HOLD | 03/11/2009 | 03/11/2009 |
| Note: Held By: FREODICA 1. Revise the energy calculations using the updated Form 400A-07 based on FBC 2007 which is in effect since March 1, 2009. Please see Section 13- 400.3. ABC.3 Forms. 2. Sheet M-2: Plan keynote 8 indicates condensate piping drains to be discharged to drywell. Provide location of drywell and its detail. 3. Sheet M5: Mechanical Specifications: Update all FBC reference codes for building, mechanical and plumbing from 2004 to 2007. | |||
| PLUM | HOLD | 03/11/2009 | 03/11/2009 |
| Note: Held By: FREODICA 1. Provide piping material specifications for sanitary drainage, vent and domestic water (hot & cold). | |||
| ELEC | COMPLETE | 03/11/2009 | 03/13/2009 |
| Note: Released By: SKNOPF Approved for Release. | |||
| BLD | HOLD | 03/09/2009 | 03/11/2009 |
| Note: Held By: JJOSEPH 1. Provide accessible counters and elevation details (offics 115and 109) 2.Provide Statement of 2007 Florida Building code as the design code. 3. Page A2.1 indicating '' Enlarge Ceiling Plan and Details" is missing. | |||
| ZON | COMPLETE | 03/06/2009 | 03/09/2009 |
| Note: Released By: ECOYNE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/21/2009 |
| REVISION | ¤40.00 | 10/21/2009 |
| REVISION | ¤40.00 | 10/21/2009 |
| REVISION | ¤40.00 | 10/21/2009 |
| SITE PLAN 20 | ¤20.00 | 04/29/2009 |
| ADMIN COMMERCIAL | ¤60.00 | 04/29/2009 |
| ELECTRIC FEE | ¤255.00 | 04/29/2009 |
| FIRE PLANS REVIEW | ¤80.70 | 04/29/2009 |
| MECHANICAL FEE | ¤255.00 | 04/29/2009 |
| PERMIT FEE | ¤2,275.00 | 04/29/2009 |
| PLAN CHECK FEE | ¤373.75 | 04/29/2009 |
| PLUMBING FEE | ¤255.00 | 04/29/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤3,734.45 |