Permit #2009030549

Permit Details

Status: COED

Parcel Id: 09-12-31-5117-00000-0030
COMMERCIAL SQUARE FOOTAGE: 3800 sqft
Total Square Footage: 3800 sqft
Block: 00000
Subdivision: 2121 - Pinnacles Professional Park
Job Phone: 386-437-4699
Location Address: 140 PINNACLES DR
Type: BC - BUILDING COMMERCIAL
Issue Date: 05/18/2009
NOC: RECORDED
Applicant name: RICHARD JAMES SMITH
Owner: D & D MEDICAL BUILDING ASSO LLC

Address

6 OFFICE PARK DRIVE

PALM COAST, FL 32137

Lot: 0030
Contracted Stated Job Value: ¤551,000.00
Job Description: 2 STORY MEDICAL CLINIC - "MEDIQUICK" SP-WVR-08-15
Type: CN

Contractor

HAMMOCK COMMUNITIES INC
Status Location Address State License Number Phone
ACTIVE

725 NORTH OCEANSHORE BLVD

FLAGLER BEACH, FL 32136

CGC1516033 (Exp: 08/31/2026) 386-693-4947

Sub Contractors

KIPP S GARDNER
Status Location Address State License Number Phone Fax
CANCEL

PO Box 1350

Bunnell, FL 32110

EC0001298 (Exp: 08/31/2018) (386) 437-3369 (386)437-5228
THOMAS P MCGUIRE JR
Status Location Address State License Number Phone Fax
ACTIVE

935 ALEXANDER AVE

PORT ORANGE, FL 32119

CAC012263 (Exp: 08/31/2026) 386-767-3900 386-761-1205
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
PAUL SCOTT WEISS
Status Location Address State License Number Phone Fax
INACTIVE

129 W. Marion Ave.

EDGEWATER, FL 32132

CCC057555 (Exp: 08/31/2025) 386-788-7750 (386)423-3030

Inspection History

Type Request Date Result Inspector
ENGINEERING FINAL 11/24/2009 APPROVED MCOBB
TRAFFIC ENGINEER 11/24/2009 APPROVED MCOBB
UTILITY COMMERCIAL FINAL 11/19/2009 APPROVED DSPENCER
UTILITY COMPANY FINAL 11/19/2009 APPROVED DSPENCER
LANDSCAPE FINAL 11/19/2009 APPROVED WBUTLER
Note: THIS IS A REINSPECTION
LANDSCAPE FINAL 11/17/2009 PARTIALLY APPROVED WBUTLER
Note: Irrigation as-built needs to be modified to more closely reflect the on-site installation location of heads and zones. One signed and sealed copy is needed of the revised sheet.
COMMERCIAL BUILDING FINAL 11/16/2009 FINAL APPROVED CMINI
ELECTRICAL FINAL 11/13/2009 APPROVED RMARVEL
FIRE FINAL 11/12/2009 APPROVED JPATTEE
PLUMBING FINAL 10/30/2009 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
PLUMBING FINAL 10/28/2009 CANCELLED BY APPLICANT JHINDMAN
H.V.A.C. FINAL 10/28/2009 APPROVED JHINDMAN
ELECTRIC FEEDER 09/18/2009 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/18/2009 2:56:18 PM CHECKED TORQUE ON FEEDER PANEL.
COMMERCIAL POWER INSPECTION 09/18/2009 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/18/2009 2:56:18 PM STIRLING ANDASSOCIATES
ABOVE CEILING 09/17/2009 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 9/17/2009 1:25:43 PM MECHANICAL ONLY
ABOVE CEILING 09/17/2009 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION above ceiling electric
INSULATION INSPECTION 08/03/2009 APPROVED CMINI
SECOND ROUGH PLUMBING INSPECTION 07/24/2009 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
2ND ROUGH ELECTRICAL 07/23/2009 APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 7/23/2009 10:45:03 AM WALLS ONLY
2ND ROUGH ELECTRICAL 07/22/2009 PARTIALLY APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 7/22/2009 3:26:17 PM INNER WALLS ONLY.
2ND ROUGH ELECTRICAL 07/17/2009 Disapproved -FEE REQUIRED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 7/17/2009 2:39:43 PM 300.4 WHERE ENT RACEWAYS ARE WITHIN 1.25IN OF EDGE OF FRAMING MEMBER IT NEEDS TO BE PROTECTED AS MENTIONED IN PRIOR LIST. THE STRAPPING OF ONE RACEWAY TO ANOTHER RACEWAY THE WAY YOU HAVE IT DOES NOT MEET THE REQUIREMENTS OF 300.11(B)1)2)3)
2ND ROUGH ELECTRICAL 07/15/2009 Disapproved -FEE REQUIRED RMARVEL
Note: Mark called to schedule this inspection Inspection Resulted at 7/15/2009 3:22:52 PM STRAP ENT EVERY 3FT. PROTECT ENT WHERE WITHIN 1 1/4IN FROM EDGE OF FRAMING MEMBER. MISSING K.O. PLUG. STRAP EMT WITHIN 3FT OF ENCLOSURE.
SECOND ROUGH PLUMBING INSPECTION 07/15/2009 Disapproved -FEE REQUIRED JHINDMAN
Note: Mark called to schedule this inspection Inspection Resulted at 7/15/2009 2:55:00 PM VENT SYSTEM DOES NOT MATCH PLANS.
H.V.A.C. ROUGH 07/15/2009 APPROVED JHINDMAN
Note: Mark called to schedule this inspection
FRAMING 07/15/2009 APPROVED CMINI
Note: Mark called to schedule this inspection
ROOF IN PROGRESS 07/07/2009 APPROVED CMINI
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 06/18/2009 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 6/18/2009 3:19:41 PM NEED REVISION FOR CHANGE OF STAIR DETAIL AND REVISION FOR CHANGE OF 2- 2X12 RIDGE TO 1 - 2X12.CHECK ON FRAMING.
LINTEL 06/05/2009 APPROVED CMINI
FOUNDATION SURVEY APPROVED BY ZONING 06/04/2009 APPROVED BBARTON
Note: As-Built checked by Larry Torrino
TEMPORARY POLE 06/01/2009 APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 6/1/2009 1:06:42 PM STIRLING AND ASSOCIATES
FOOTER 05/29/2009 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 5/29/2009 3:22:58 PM FOOTER FOR SIGN
MONOLITHIC SLAB INSPECTION/SLAB 05/29/2009 APPROVED CMINI
Note: THIS IS A REINSPECTION
FOOTER 05/28/2009 CANCELLED BY APPLICANT CMINI
MONOLITHIC SLAB INSPECTION/SLAB 05/28/2009 CANCELLED BY APPLICANT CMINI
UNDERGROUND ELECTRICAL 05/28/2009 APPROVED RMARVEL
Note: Inspection Resulted at 5/28/2009 2:03:27 PM UNDERSLAB ONLY
TEMPORARY POLE 05/28/2009 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 5/28/2009 2:03:27 PM CANNOT USE NM CABLE IN WET LOCATIONS IF NOT RATED FOR THAT LOCATION. METER CAN COONECTIONS ARE SEVERELY CORRODED AND IN A UNSAFE CONDITION NEEDS REPLACED.
UNDERGROUND ELECTRICAL 05/27/2009 APPROVED RMARVEL
FIRST ROUGH PLUMBING INSPECTION 05/22/2009 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
FIRST ROUGH PLUMBING INSPECTION 05/19/2009 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 5/19/2009 2:10:07 PM CANNOT DETERMINE IF SANITARY PIPING IS LEAKING DUE TO THE HEAVY RAINS THAT ARE FILLING UP THE VENT STACKS.

Review History

Department Status Date In Date Out
ELEC COMPLETE 11/12/2009 11/12/2009
Note: Released By: LHITES Revision re circuit
ELEC HOLD 11/10/2009 11/10/2009
Note: Held By: LHITES electric revisions - re-circuit Revision sheets must be signed and sealed by engineer. circuit P1-19 is for x-ray room. Panel schedule says it is for exam room 3. please correct.
PLUM COMPLETE 07/22/2009 07/23/2009
Note: Released By: JMCGOWEN Isometric changes
MECH COMPLETE 07/14/2009 07/14/2009
Note: Released By: FREODICA REQUEST FOR 2ND SET OF PLANS Revisions: 1. Building & mechanical charge $80.00 2. Mech- Revised AHU installation and ductwork. 3. Bldg.- Added covered entry at front door, etc. See listing.
ZON COMPLETE 07/14/2009 07/14/2009
Note: Released By: ECOYNE revision for front door covered entrance 8' X 4'
BLD COMPLETE 07/10/2009 07/13/2009
Note: Released By: JJOSEPH revision - framing changes, air handler changes, fire- directions of travel change
MECH HOLD 07/10/2009 07/10/2009
Note: Held By: FREODICA revision - framing changes, air handler changes, fire- directions of travel change 1. Provide another one(1) set of revision plans.
FD1 COMPLETE 07/09/2009 07/10/2009
Note: Released By: JPATTEE revision - framing changes, air handler changes, fire- directions of travel change
BLD COMPLETE 06/08/2009 06/08/2009
Note: Released By: JJOSEPH highlighted trusses have been changed to product or 'Dutch Hoz" at front of building.
ELEC COMPLETE 05/07/2009 05/07/2009
Note: Released By: SKNOPF Approved for Release.
MECH COMPLETE 05/07/2009 05/07/2009
Note: Released By: FREODICA response to comments
FI1 COMPLETE 05/01/2009 05/01/2009
Note: Released By: JPATTEE correction - fire updates to the holds
BLD COMPLETE 04/30/2009 04/30/2009
Note: Released By: JJOSEPH
FI1 HOLD 04/29/2009 04/30/2009
Note: Held By: JPATTEE correction - for all areas on hold Rooms 120, 115, 110 exceed allowable swing into corridor. Minimum tread depth is 11". Provide listing agency for rated closet # 116 Exit lighting still appears to be lacking on the first floor. Does a code allow for an electrical room to be unfinished and expose combustible materials?
BLD HOLD 04/27/2009 04/28/2009
Note: Held By: JJOSEPH According to the Florida Product Approval Number 11638, the exterior door is not impact resistant then needs to be protected.
PLUM COMPLETE 04/27/2009 04/28/2009
Note: Released By: FREODICA correction - for all areas on hold
ELEC HOLD 04/27/2009 04/27/2009
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application #2009030549 (Medi-Quick Walk-In Clinic) 4/27/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Sheet 4/19: Previous comments from 4-7-2009 1) Completed b. The following devices/items have no circuit shown on plans: 1) Completed 2) Completed 3) Completed 4) Completed 5) Completed 6) Completed 7) All emergency lights 8) Completed 9) Completed 10) GFCI receptacle on exterior wall outside room 107 11) Completed c. Completed d. Completed e. Disconnect will be required for Water Heater in 201. f. Completed g. Completed h. Revise Demand Load Calculation per NEC for each panel and for service entrance feeders. Demand load calculation given for both panels has incorrect quantity of 180VA convenience receptacles, and does not take into account equipment loads, ie. refrigerators, exhaust fans, copiers, fax machines, x-ray machine, etc. Equipment and appliances must be included at rated load per NEC 220.14(A). i. Plumbing plan shows water heater has (2) 4500W elements total 9000W @ 240V yielding 38A. Revise circuit breaker size as required per nameplate for water heater P1-26:28, and revise load in load calculation. j. Provide electrical data for AHU's, ACU's, Mitsubishi Mini-split, and exhaust fans for circuit breaker size requirements and load determination. None provided. k. Completed l. Completed m. Completed n. Completed o. Completed p. Completed 2. New Comments from revised plan 4/19: a. Circuit P1-2 shows 10 duplex receptacles @ 180VA plus (5) 'A' fixtures @ 128W yielding 2440W on a 20A circuit. Revise circuit breaker size or adjust load. b. Circuit p1-8 is shown for 2 refrigerators, rooms 100 and 111. Revise circuit load and load calculation to reflect both appliances. c. Circuit P2-15 is shown for duplex receptacles and lighting in room 203, but panel schedule is shown as "space". Review and revise. Include load for this circuit. d. Identify circuit breaker size for mini-split. e. Revise circuit load for circuit P1-32 shown room 100, 101 and 112. f. The following circuits have incorrect load shown in panel schedules: 1) P1-4, 29, 32, 33 2) P2-5, 9 …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
MECH HOLD 04/27/2009 04/27/2009
Note: Held By: FREODICA Comments to submitted corrections dated April 23, 2009: 1. Item 1: Energy calculations shall be signed by the preparer. Also, the input data report is missing. 2. Item 3: Identify on plan all exhaust fans to match Equipment Schedule. The exhaust duct termination from dark room shall be at least 10 ft away from outside air intake for AHU-1 & AHU-2. 3. Item 10: Condensate drain disposal from AHU-2 shows passing down along the window? Plase clarify. How about the condensate drain from AHU-1.
UD1 COMPLETE 04/22/2009 04/22/2009
Note: Released By: CJOHNSON
ZON COMPLETE 04/14/2009 04/14/2009
Note: Released By: ECOYNE
FI1 HOLD 04/07/2009 04/08/2009
Note: Held By: JPATTEE Cover sheet, Maximum dead end corridor is incorrect. Closet 116 required to be fire rated Provide stair construction type. Sheet 3/19 rooms 201, 202, 203 are indicated as unfinished. Does room 106 require wall shielding for x-ray? Rooms 120, 115, 110 doors exceed allowable swing into corridor. Exit lighting appears to be lacking. Plans do not indicate fire rated walls, room 205 shows a 1 hour rated door??
MECH HOLD 04/06/2009 04/07/2009
Note: Held By: FREODICA 1. Revise energy calculations to comply with the new code FBC 2007 using Form 400B-07 for method B per Section 13-400.3.B. 2. The energy calculations show (1) 1-ton unit split-system which is not shown on the plan. Please clarify. 3. Provide exhaust fan specifications, duct size, routing or termination. 4. Provide size of louver for outside air and indicate the amount of air in CFM supplied to each AHU. 5. Provide return air from office adjacent to waiting room. 6. Provide information on dark room as there is no return or exhaust air shown. 7. Indicate return duct sizes on first floor plan for both AHU-1 & AHU-2. 8. Indicate supply/return duct sizes on attic plan for AHU-2. 9. Provide material specifications for ductwork system. 10. Provide condensate disposal per FMC 2007 Section 307.
PLUM HOLD 04/06/2009 04/07/2009
Note: Held By: FREODICA 1. Provide material specifications for DWV and domestic water (hot & cold). 2. Provide pipe sizes on domestic water either on plan or riser diagram.
ELEC HOLD 04/06/2009 04/07/2009
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application #2009030549 (Medi-Quick Walk-In Clinic) 4/7/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Sheet 4/19 signed and sealed 11-13-08: a. The following circuits are shown tied together: 1) P1-1 to P1-3 2) P1-19 to P1-23 3) P1-11 to P1-13 4) P1-9 to P1-12 b. The following devices/items have no circuit shown on plans: 1) GFCI, lighting, exhaust fan, and ceiling receptacle in Dark Room 2) Light in Chart Storage 3) Duplex receptacle in Corridor outside Chart Storage 4) Light in Closet 116 5) Lighting in stairs 6) Lighting, exhaust fan, receptacle in Drug Testing 7) All exit and emergency lights 8) Service receptacle at ACU's. 9) Interior lighting 10) GFCI receptacle on exterior wall outside room 107 11) Lighting and exhaust fan in room 102 Employee's lavatory c. Match lighting Sheet 4 to lighting Sheet 8. Reflected ceiling does not coincide with quantity of fixtures on Electrical Plan. d. Exit and emergency lighting will be required in room 204, and exit lighting will be required at top of stairs in 205. e. Disconnects will be required for AHU-1, AHU-2, and Water Heater in 201. f. Lighting fixture in 205 at door to periphery unfinished area needs circuit. g. Provide Fixture schedule showing total wattage for each fixture. h. Provide Demand Load Calculation per NEC for each panel and for service entrance feeders. i. Plumbing plan shows water heater is (2) 4500 total 9000W @ 240V yielding 38A. Revise circuit breaker size as required per nameplate for water heater P1-26:28. j. Provide electrical data for AHU's, ACU's, Mitsubishi Mini-split, and exhaust fans for circuit breaker size requirements and load determination. k. Electrical Riser shows 1PH meter can, but Note 1 shows 4 conductors. Revise feeder from FPL to meter, since grounding electrode appears to be developed at the meter. l. Identify size of grounding electrode conductor and quantity and type of grounding electrodes per NEC 250. m. Identify location of meter and service wireway on power plans. n. Provide loads in panel schedules for all circuits. o. Identify X-ray equipment load per nameplate rating. p. Sheet 5 Panel P2 identifies panel as 3-phase 4-wire. Sheet 4 P2 panel schedule shows 1-phase 3-wire. Coordinate. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
BLD HOLD 04/03/2009 04/06/2009
Note: Held By: JJOSEPH 1.Provide Statement of 2007 Florida Building Code as the design code. 2.Provide the LVLSs size. 3. Provide Florida Product Approval Number for all doors and windows. 4.The wall and soffits within enclosed usable spaces under enclosed and unenclosed stairways need to be protected per section 1009.5.3 of FBC 2007. 4.Any door swinging in a means of egress shall leave unobstructed at least one half of the required width of a corridor per section 1008.1.8.8 of FBC 2007. 5. Two roof coverings were sumbmitted (Asphalt shingle and metal) wich one that will be used for that project. 6. Provide the correct Dead End Corridor distance per section 1017.3 (2) of FBC 2007 7.Provide Floor Joists details 8. Identify Area of Rescue Assistance location. 9. Precise the construction type ( IIIA or IIIB) 10.Provide two stories wall section details. 11. Others comments may be necessary based on your responses to these comments.
ZON HOLD 04/01/2009 04/01/2009
Note: Held By: ECOYNE need approved site plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/07/2009
REINSPECTION FEE ¤40.00 12/07/2009
REINSPECTION FEE ¤40.00 12/07/2009
REINSPECTION FEE ¤40.00 12/07/2009
REINSPECTION FEE ¤40.00 12/07/2009
REVISION ¤40.00 12/07/2009
REVISION ¤40.00 12/07/2009
REVISION ¤40.00 12/07/2009
REVISION ¤80.00 12/07/2009
TRANSPORTATION IMPACT FEE ¤10,053.36 12/07/2009
TRANSPORTATION IMPACT FEE ¤20,106.70 12/07/2009
REVISION ¤80.00 05/18/2009
SITE PLAN 20 ¤20.00 05/18/2009
TRANSPORTATION IMPACT FEE ¤10,053.36 05/18/2009
ADMIN COMMERCIAL ¤60.00 05/18/2009
BUILDING CODE ADMIN FUND ¤19.00 05/18/2009
ELECTRIC FEE ¤390.60 05/18/2009
FIRE PLANS REVIEW ¤38.00 05/18/2009
FIRE IMPACT FEE RES 4/01/08 ¤2,004.12 05/18/2009
MECHANICAL FEE ¤390.60 05/18/2009
PERMIT FEE ¤3,030.50 05/18/2009
PLAN CHECK FEE ¤633.65 05/18/2009
PLUMBING FEE ¤390.60 05/18/2009
RADON FEE ¤19.00 05/18/2009
Fees Total Due: ¤0.00 Total Paid: ¤47,689.49