Permit #2009040045
Permit Details
Status: COED
| Parcel Id: 09-12-31-0000-02030-0020 |
| COMMERCIAL SQUARE FOOTAGE: 1897 sqft |
| Total Square Footage: 1897 sqft |
| Block: 02030 |
| Subdivision: - |
| Job Phone: 407-916-7235 |
| Location Address: 60 MEMORIAL MEDICAL PKWY |
| Type: CA - COMM ADDITION |
| Issue Date: 04/30/2009 |
| NOC: RECORDED |
| Applicant name: ROCKY MCMICHEN |
| Owner: MEMORIAL HOSPITAL-FLAGLER INC |
|
Address 875 STERTHAUS AVENUE ORMOND BEACH, FL 32174 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤1,085,000.00 |
| Job Description: MEMORIAL MEDICAL PARK HOSPITAL CATH LAB ADDITION-- APPLICATION # 1662 |
| Type: CN |
Contractor
THE ROBINS & MORTON GROUP
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
1900 SUMMIT TOWER BLVD. ORLANDO, FL 32810 |
SUITE 150 ORLANDO, FL 32810 |
CGC1506087 (Exp: 08/31/2012) | 407-916-7235 | 407-916-7632 |
Sub Contractors
ANTHONY A TIDWELL
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1300 FT. NEGLEY BLVD NASHVILLE, TN 37203 |
EC0002156 (Exp: 08/31/2012) | 615-350-7270 | 615-350-7242 |
TODD SHERWOOD MORGAN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
777 BENNETT DRIVE LONGWOOD , FL 32750 |
CMC039581 (Exp: 08/31/2022) | 407-682-1313 | (407)682-5166 |
TODD SHERWOOD MORGAN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
777 BENNETT DRIVE LONGWOOD, FL 32750 |
CFC043045 (Exp: 08/31/2022) | (407)682-1313 | (407)682-5166 |
DAVID HENRY SCHMITT
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
405 NEWTECH COURT DEBARY, FL 32713 |
CCC045926 (Exp: 08/31/2020) | (386)753-1388 | (386)753-1588 |
Inspection History
| Type | Request Date | Result | Inspector |
| LANDSCAPE FINAL | 11/30/2009 | APPROVED | WBUTLER |
| COMMERCIAL BUILDING FINAL | 11/13/2009 | APPROVED | RMARVEL |
| UTILITY COMMERCIAL FINAL | 11/06/2009 | APPROVED | DSPENCER |
| UTILITY COMPANY FINAL | 11/06/2009 | APPROVED | TSCHWEERS |
| FIRE FINAL | 11/06/2009 | APPROVED | JPATTEE |
| FIREWALL FINAL INSPECTION | 11/06/2009 | APPROVED | JPATTEE |
| H.V.A.C. FINAL | 11/03/2009 | APPROVED | JMCGOWEN |
| PLUMBING FINAL | 11/02/2009 | APPROVED | JHINDMAN |
| ENGINEERING FINAL | 11/02/2009 | APPROVED | MCOBB |
| TRAFFIC ENGINEER | 11/02/2009 | FINAL APPROVED | MCOBB |
| ELECTRIC FEEDER | 11/02/2009 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| COMMERCIAL POWER INSPECTION | 11/02/2009 | APPROVED | RMARVEL |
| ELECTRICAL FINAL | 11/02/2009 | APPROVED - AS NOTED | RMARVEL |
| Note: Inspection Resulted at 11/2/2009 1:53:06 PM CHECK FOR REVISED PANEL SCH. CPB IN ROOM. | |||
| SECOND ROUGH PLUMBING INSPECTION | 10/13/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC FEEDER | 10/13/2009 | PARTIALLY APPROVED | RMARVEL |
| ABOVE CEILING | 10/13/2009 | APPROVED | JHINDMAN |
| H.V.A.C. ROUGH | 09/24/2009 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 9/24/2009 2:55:31 PM MECHANICAL PIPING COMPLETE. | |||
| 2ND ROUGH ELECTRICAL | 08/28/2009 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. ROUGH | 08/26/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/26/2009 2:59:59 PM OK TO INSULATE VTU LINES | |||
| 2ND ROUGH ELECTRICAL | 08/18/2009 | PARTIALLY APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/18/2009 1:30:58 PM NEED REVISION FOR HEAD WALL AND BACK WALL. OTHER WALLS ARE APPROVED. | |||
| INSULATION INSPECTION | 08/18/2009 | APPROVED - AS NOTED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/18/2009 1:30:59 PM NEED AN APPROVED ENERGY SHOWING INSULATION R-VALUE. THERE IS R-19 AT PRESENT.(8/18/2009) | |||
| SECOND ROUGH PLUMBING INSPECTION | 08/17/2009 | CANCELLED BY APPLICANT | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| SECOND ROUGH PLUMBING INSPECTION | 08/14/2009 | PARTIALLY APPROVED | JMCGOWEN |
| Note: med. gas test pressure ok, plumbing test pressure ok, need to provide approved revised plumbing plans. | |||
| FRAMING | 08/14/2009 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. ROUGH | 08/14/2009 | PARTIALLY APPROVED | LHITES |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/14/2009 12:46:19 PM AREAS APPROVED ARE HIGHLITED ON PLANS | |||
| H.V.A.C. ROUGH | 08/07/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 8/7/2009 2:45:52 PM PARTIAL SUPPLY DUCTS OK TO INSULATE, PARTIAL RETURN DUCT. SEE PLANS FOR LOCATIONS. | |||
| FRAMING | 08/06/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 8/6/2009 1:20:26 PM SHAFTWALL FRAMING | |||
| FIREWALL INSPECTION 2ND ROUGH | 08/06/2009 | Disapproved - NO FEE | JPATTEE |
| Note: Unable to determine what to inspect | |||
| ROOF IN PROGRESS | 08/05/2009 | APPROVED | CMINI |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/05/2009 | APPROVED | CMINI |
| H.V.A.C. ROUGH | 08/05/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 8/5/2009 2:58:30 PM PARTIAL CHILLED WATER LINES ARE OK TO WRAP. | |||
| INSULATION INSPECTION | 08/03/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 8/3/2009 2:37:57 PM WALL INSULATION FOR THE HILL HOUSE. | |||
| 2ND ROUGH ELECTRICAL | 07/30/2009 | PARTIALLY APPROVED | RMARVEL |
| Note: penthouse holding cooling unit walls only. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 07/22/2009 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 07/22/2009 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| LINTEL | 07/21/2009 | APPROVED | CMINI |
| FRAMING | 07/21/2009 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 07/21/2009 | PARTIALLY APPROVED | CMINI |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 07/21/2009 | APPROVED | CMINI |
| UNDERGROUND ELECTRICAL | 07/21/2009 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION Hooten called to schedule this inspection | |||
| FRAMING | 07/16/2009 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 7/16/2009 3:32:19 PM PARTIAL METAL STUD WALLS 1ST FL TO ROOF ONLY AND 2ND FL SECTION COMPLETE. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 07/02/2009 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 7/2/2009 3:37:48 PM 1ST FL PERIMETER SLAB AND SECOND FL SECTION OF SLAB. | |||
| UNDERGROUND ELECTRICAL | 07/02/2009 | PARTIALLY APPROVED | CMINI |
| Note: Hooten called to schedule this inspection Inspection Resulted at 7/2/2009 3:37:47 PM ELECTRIC CONDUIT IN SLAB TO BE POURED. | |||
| FIRST ROUGH PLUMBING INSPECTION | 06/29/2009 | APPROVED | JHINDMAN |
| FIRST ROUGH PLUMBING INSPECTION | 06/26/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 6/26/2009 2:37:50 PM DWV DOES NOT MATCH PLANS. TEST PRESSURE IS OK. | |||
| FIRST ROUGH PLUMBING INSPECTION | 06/19/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 6/19/2009 3:15:27 PM UNDER SLAB STORM DRAIN LINE. | |||
| FOOTER | 05/13/2009 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 11/12/2009 | 11/12/2009 |
| Note: Released By: SKNOPF revision - S & S revised schedule Approved for Release. | |||
| ELEC | COMPLETE | 08/31/2009 | 08/31/2009 |
| Note: Released By: LHITES | |||
| PLUM | COMPLETE | 08/31/2009 | 08/31/2009 |
| Note: Released By: FREODICA Revision 1 dated 2/17/09- Sheets P001, P202 & P203. | |||
| BLD | COMPLETE | 08/31/2009 | 09/01/2009 |
| Note: Released By: JJOSEPH Revision Life safety G111 A11, A641, A801- Detail changes Pool- Plumbing schedule P202- water change P203 | |||
| MECH | COMPLETE | 08/27/2009 | 08/27/2009 |
| Note: Released By: JMCGOWEN revision- relocation of outlet, mcb panel, modify duct, headwall layout, med-gas outlets. | |||
| ELEC | COMPLETE | 08/27/2009 | 08/27/2009 |
| Note: Released By: JMCGOWEN revision- relocation of outlet, mcb panel, modify duct, headwall layout | |||
| PLUM | COMPLETE | 08/27/2009 | 08/27/2009 |
| Note: Released By: JMCGOWEN revision- relocation of outlet, mcb panel, modify duct, headwall layout, med-gas outlets. | |||
| MECH | HOLD | 08/25/2009 | 08/25/2009 |
| Note: Held By: FREODICA revision- relocation of outlet, mcb panel, modify duct, headwall layout, med-gas outlets. Review comment: 1. Provide (2) stamped copies of full size plan instead of 8-1/2 x11 size drawing. | |||
| ELEC | HOLD | 08/25/2009 | 08/25/2009 |
| Note: Held By: SKNOPF revision- relocation of outlet, mcb panel, modify duct, headwall layout CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application #2009040045 (Cath Lab Renovation @ 60 Memorial Medical Pkwy.) 8/25/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Provide revision plan changes on plan size sheets, signed and sealed by the architect/engineer of record (2 copies). …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| PLUM | HOLD | 08/25/2009 | 08/25/2009 |
| Note: Held By: FREODICA revision- relocation of outlet, mcb panel, modify duct, headwall layout, med-gas outlets. Review comment: 1. Provide (2) stamped copies of full size plan instead of 8-1/2 x11 size drawing. | |||
| BLD | COMPLETE | 08/17/2009 | 08/17/2009 |
| Note: Released By: JMCGOWEN revision - rev # 3 | |||
| FD1 | COMPLETE | 08/17/2009 | 08/18/2009 |
| Note: Released By: JPATTEE revision - rev # 3 | |||
| ELEC | COMPLETE | 08/14/2009 | 08/17/2009 |
| Note: Released By: JMCGOWEN revision - rev # 3 Approved for Release. Revision: Relocated Cath Panel Moved a receptacle and a data outlet Added a Warning Light Revised overhead and floor duct locations | |||
| PLUM | COMPLETE | 06/26/2009 | 06/26/2009 |
| Note: Released By: JMCGOWEN revision - p 201 - underground | |||
| MECH | COMPLETE | 04/24/2009 | 04/27/2009 |
| Note: Released By: BBEMBRY Correction submitted indicating a mechanical/electrical review was necessary. it was determinted the correction letter submitted was only necessary for fire. | |||
| FD1 | COMPLETE | 04/23/2009 | 04/23/2009 |
| Note: Released By: JPATTEE correction - electricial & mechanical s and s code letters | |||
| FD1 | COMPLETE | 04/22/2009 | 04/23/2009 |
| Note: Released By: JPATTEE In reviewing the AHCA letter dated February 5, 2009 it has become apparent that the code review completed by AHCA after January 1, 2009 had referenced the codes which were no longer applicable and approved the the plans. I will forward this Information to the State Fire Marshal for follow up investigation | |||
| MECH | COMPLETE | 04/21/2009 | 04/21/2009 |
| Note: Released By: FREODICA Correction Sheet M002- new constant volume terminal unit schedule Email Corr. and AHCA approved letter dated 2/5/09 Signed & Sealed construction documents dated 1/23/09 | |||
| BLD | COMPLETE | 04/13/2009 | 04/13/2009 |
| Note: Released By: JJOSEPH | |||
| FI1 | COMPLETE | 04/13/2009 | 04/23/2009 |
| Note: Released By: JPATTEE | |||
| UD1 | COMPLETE | 04/06/2009 | 04/08/2009 |
| Note: Released By: CJOHNSON | |||
| ELEC | COMPLETE | 04/06/2009 | 04/06/2009 |
| Note: Released By: SKNOPF Approved for Release. | |||
| FI1 | HOLD | 04/06/2009 | 04/08/2009 |
| Note: Held By: JPATTEE Sheet G001, Various NFPA codes indicated are outdated, resubmit corrected plans according to current adopted codes. | |||
| MECH | HOLD | 04/03/2009 | 04/03/2009 |
| Note: Held By: FREODICA 1. Sheet M002: New Constant Volume Terminal Unit Schedule: a. Clarify if the units are constant or variable volume units as the plans and schedule do not match. | |||
| PLUM | COMPLETE | 04/03/2009 | 04/03/2009 |
| Note: Released By: FREODICA | |||
| BLD | HOLD | 04/03/2009 | 04/06/2009 |
| Note: Held By: JJOSEPH 1.The design code needs to be updated to the Statement 2007 and supplement 2009 of The Florida Building Code | |||
| ZON | COMPLETE | 04/02/2009 | 04/02/2009 |
| Note: Released By: ECOYNE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤80.00 | 11/16/2009 |
| REVISION | ¤40.00 | 11/16/2009 |
| REVISION | ¤40.00 | 11/16/2009 |
| REVISION | ¤80.00 | 11/16/2009 |
| REVISION | ¤40.00 | 11/16/2009 |
| REVISION | ¤40.00 | 08/18/2009 |
| REINSPECTION FEE | ¤40.00 | 08/18/2009 |
| REVISION | ¤40.00 | 08/18/2009 |
| REVISION | ¤80.00 | 08/18/2009 |
| SITE PLAN 20 | ¤20.00 | 04/30/2009 |
| TRANSPORTATION IMPACT FEE | ¤8,502.39 | 04/30/2009 |
| ADMIN COMMERCIAL | ¤60.00 | 04/30/2009 |
| BUILDING CODE ADMIN FUND | ¤9.49 | 04/30/2009 |
| ELECTRIC FEE | ¤711.00 | 04/30/2009 |
| FIRE PLANS REVIEW | ¤25.00 | 04/30/2009 |
| FIRE IMPACT FEE RES 4/01/08 | ¤1,000.48 | 04/30/2009 |
| MECHANICAL FEE | ¤711.00 | 04/30/2009 |
| PERMIT FEE | ¤7,595.00 | 04/30/2009 |
| PLAN CHECK FEE | ¤1,247.75 | 04/30/2009 |
| PLUMBING FEE | ¤711.00 | 04/30/2009 |
| RADON FEE | ¤9.49 | 04/30/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,082.60 |