I want to search for...
Permit #2009040491
Permit Details
Status: COED
| Parcel Id: 07-11-31-7014-00070-0850 |
| CONDITIONED SPACE: 2598 sqft |
| GARAGE: 715 sqft |
| OPENED PORCH (WITH ROOF) : 149 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| GARAGE: 81 sqft |
| Total Square Footage: 3603 sqft |
| Block: 00070 |
| Subdivision: - |
| Job Phone: 386-246-6125 |
| Location Address: 14 CROSSLEAF CT E |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/04/2009 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: GRIMES, ROBERT D |
|
Address 9016 ALISON ROAD CEDAR GROVE, NC 27231 |
| Lot: 0850 |
| Contracted Stated Job Value: ¤220,076.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES INC.
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CRC057202 (Exp: 08/31/2010) | 386-246-6125 | 386-246-6124 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL G MORELLO JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32137 |
CAC014293 (Exp: 08/31/2014) | (386)447-3950 | (386)446-4614 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
KENNETH MARTIN REED
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
83 LANCELOT DRIVE BUNNELL , FL 32110 |
CCC1328712 (Exp: 08/31/2026) | 386-446-3100 | 386-445-6074 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 03/24/2010 | FINAL APPROVED | DROCKWELL |
| STORMWATER FINAL INSPECTION | 03/22/2010 | APPROVED | JCOLASANTI |
| STORMWATER FINAL INSPECTION | 03/19/2010 | CANCELLED BY INSPECTOR | DRANDALL |
| Note: 9/9/09 checked site///some dirt is on the street//DR 9/24/09 site checked///everything ok//no dirt on road// 3/19/10 not ready for inspection, see report | |||
| UTILITY COMPANY FINAL | 03/18/2010 | APPROVED | TSCHWEERS |
| R.O.W. DAMAGE INSPECTION | 03/15/2010 | Disapproved - NO FEE | LAPTEKAR |
| Note: check conditions of vacant lot swales and mark road for damage repairs 3/15/10 could not determine road damage...road needs to be cleaned off, also need more sod in the exposed areas of the adjacent lot swale. | |||
| PRE DRIVEWAY | 03/04/2010 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| PRE DRIVEWAY | 03/02/2010 | CANCELLED BY APPLICANT | LAPTEKAR |
| Note: THIS IS A REINSPECTION cancel per David | |||
| PRE DRIVEWAY | 03/01/2010 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: 1. driveway not formed correctly: need 5" coverage over pipe left mitered end section, need 5" coverage 10' from edge of pavement, need to remove water from culvert ends before pour, need 6" along the edge of pavement. | |||
| RESIDENTIAL EARLY POWER | 02/19/2010 | APPROVED | CMINI |
| LATH /BRICK FLASHING | 01/26/2010 | APPROVED | DROCKWELL |
| INSULATION INSPECTION | 01/25/2010 | APPROVED | DROCKWELL |
| ALL ROUGH | 01/21/2010 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 1/21/2010 12:03:29 PM PROVIDE NAIL PLATE ACCROSS 1X4 TOP OF PANEL BOX FRAMING. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/23/2009 | APPROVED | DROCKWELL |
| LINTEL | 10/06/2009 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 10/6/2009 12:20:08 PM SEE LINTEL RETURN AT MASTER FRONT WINDOW OUT OF SQUARE DOWN ROD IN WRONG CELL AT TOP. | |||
| FOUNDATION SURVEY APPROVED BY ZONING | 10/02/2009 | APPROVED | ECOYNE |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 10/02/2009 | APPROVED | WKINELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 09/25/2009 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 9/25/2009 3:29:22 PM SOME CONCERNS ABOUT CORNER OF HOUSE TO CLOSE TO PROPRTY LINE.NOTIFIED CONTRACTOR ABOUT IT. | |||
| FIRST ROUGH PLUMBING INSPECTION | 09/23/2009 | APPROVED | DROCKWELL |
| RETAINING WALL | 08/27/2009 | APPROVED | DROCKWELL |
| STEM FOOTING FOUNDATION | 08/21/2009 | APPROVED | DROCKWELL |
| TEMPORARY POLE | 07/10/2009 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION requested by David Inspection Resulted at 7/10/2009 3:15:24 PM PALMETTO | |||
| TEMPORARY POLE | 07/08/2009 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 7/8/2009 3:41:23 PM CONDUCTOR PULLED OUT OF LUG NEEDS TO BE CORRECTED. | |||
| STORMWATER EROSION CONTROL | 05/18/2009 | APPROVED | DRANDALL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/28/2009 | 09/28/2009 |
| Note: Released By: LAPTEKAR move house forward 9/28/09 moved house forward//rear set back 10' | |||
| ZON | COMPLETE | 09/25/2009 | 09/28/2009 |
| Note: Released By: ECOYNE move the house forward | |||
| BLD | COMPLETE | 07/09/2009 | 07/09/2009 |
| Note: Released By: JMCGOWEN changed product approval exterior doors,sliding & windows | |||
| BLD | COMPLETE | 06/29/2009 | 06/29/2009 |
| Note: Released By: JMCGOWEN corrected width of footer at rear of house tobe 3'-8" 3.0 st sheet only affected | |||
| ZON | COMPLETE | 06/18/2009 | 06/18/2009 |
| Note: Released By: BBARTON | |||
| ZON | COMPLETE | 05/01/2009 | 05/01/2009 |
| Note: Released By: ECOYNE | |||
| SW1 | COMPLETE | 05/01/2009 | 05/01/2009 |
| Note: Released By: LAPTEKAR site plan amended to omit the rear door pad in the utility easement Erosion control measures are required along the rear property line | |||
| SW1 | HOLD | 04/28/2009 | 04/28/2009 |
| Note: Held By: LAPTEKAR File contained grade elevation profile..however ..per MB noted that home is setting on possible seawall tie back locations and rear door slab by others needs to be removed from site plan as it encroaches into 5' utility easement...questioned location of door pad.... are there stairs? | |||
| BLD | COMPLETE | 04/27/2009 | 04/28/2009 |
| Note: Released By: JMCGOWEN reviewed by Auba and check by Joe M. | |||
| SW1 | HOLD | 04/24/2009 | 04/24/2009 |
| Note: Held By: LAPTEKAR Grade elevation profile required for saltwater canal lots. | |||
| ZON | HOLD | 04/24/2009 | 04/27/2009 |
| Note: Held By: ECOYNE Must show front setback plantings around a/c & equipment pads. Rear pad in easement. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 03/24/2010 |
| CONTRACTOR CHANGE | ¤40.00 | 03/24/2010 |
| REINSPECTION FEE | ¤40.00 | 03/24/2010 |
| REVISION | ¤40.00 | 03/24/2010 |
| REVISION | ¤40.00 | 03/24/2010 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 03/24/2010 |
| TRANS IMPACT FEE 6 - RESIDENTI | ¤3,841.11 | 05/04/2009 |
| BUILDING CODE ADMIN FUND | ¤18.02 | 05/04/2009 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 05/04/2009 |
| SITE PLAN 20 | ¤20.00 | 05/04/2009 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/04/2009 |
| NEW RESIDENTIAL INSPECTIONS | ¤564.00 | 05/04/2009 |
| ELECTRIC FEE | ¤229.20 | 05/04/2009 |
| FIRE COMM IMPACT FEE 4/1/09 | ¤190.48 | 05/04/2009 |
| MECHANICAL FEE | ¤229.20 | 05/04/2009 |
| PERMIT FEE | ¤20.00 | 05/04/2009 |
| PARKS IMPACT FEE 4/1/09 | ¤1,230.83 | 05/04/2009 |
| PLAN CHECK FEE | ¤112.80 | 05/04/2009 |
| PLUMBING FEE | ¤229.20 | 05/04/2009 |
| RADON FEE | ¤18.02 | 05/04/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,617.86 |