I want to search for...
Permit #2009040573
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01140-0040 |
| CONDITIONED SPACE: 2448 sqft |
| GARAGE: 409 sqft |
| OPENED PORCH (WITH ROOF) : 151 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| Total Square Footage: 3038 sqft |
| Block: 01140 |
| Subdivision: - |
| Job Phone: 386-246-6125 |
| Location Address: 12 BISHOP LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/18/2009 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PKWY PALM COAST, FL 32164 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤207,370.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES INC.
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CRC057202 (Exp: 08/31/2010) | 386-246-6125 | 386-246-6124 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL G MORELLO JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32137 |
CAC014293 (Exp: 08/31/2014) | (386)447-3950 | (386)446-4614 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 09/23/2009 | FINAL APPROVED | ACOOPER |
| FINAL COMPLETE BUILDING INSPECTION | 09/22/2009 | Disapproved -FEE REQUIRED | ACOOPER |
| Note: THIS IS A REINSPECTION David from Seagate called to schedule this inspection Inspection Resulted at 9/22/2009 2:52:40 PM RECEPTACLE LEFT SIDE OF SINK IS LOOSE (BROKE WHEN ATTEMPTING TO CHECK GFI), MASTER BATHROOM MISSING RECEPTACLE PLATES AND SEAL AROUND PIPING FROM HVU IN GARAGE. (ARE YOU AWARE THAT GFI IN GARAGE IS ALSO HOOKED TO ATTIC AND GARAGE LIGHTING?) | |||
| FINAL COMPLETE BUILDING INSPECTION | 09/15/2009 | CANCELLED BY APPLICANT | DROCKWELL |
| STORMWATER FINAL INSPECTION | 09/14/2009 | APPROVED | DRANDALL |
| Note: 5/4/09 no swale, no road damage, also no median damage 6/25/09 everything ok | |||
| UTILITY COMPANY FINAL | 09/14/2009 | APPROVED | TSCHWEERS |
| R.O.W. DAMAGE INSPECTION | 09/09/2009 | APPROVED - AS NOTED | DRANDALL |
| Note: Marked 34 sq ft of road damage that needs repair | |||
| PRE DRIVEWAY | 08/27/2009 | APPROVED | DRANDALL |
| RESIDENTIAL EARLY POWER | 08/20/2009 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 8/20/2009 2:19:44 PM PALMETTO | |||
| LATH /BRICK FLASHING | 07/30/2009 | APPROVED | CMINI |
| INSULATION INSPECTION | 07/29/2009 | APPROVED | DROCKWELL |
| ALL ROUGH | 07/27/2009 | APPROVED | ACOOPER |
| Note: THIS IS A REINSPECTION Inspection Requested at 7/24/2009 5:08:53 PM PLEASE AFTER LUNCH 931-1633 | |||
| ALL ROUGH | 07/24/2009 | CANCELLED BY APPLICANT | ACOOPER |
| Note: Inspection Requested at 7/23/2009 4:58:33 PM PLEASE SCHEDULE AFTER LUNCH THANKS, DF | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 07/21/2009 | APPROVED - AS NOTED | ACOOPER |
| Note: Inspection Resulted at 7/21/2009 3:56:21 PM PROVIDE FASTENING SCHEDULE FOR WALL OVER THE FRONT DOOR (EXTERIOR WALL). ART 931 6966. OK TO SHINGLE. WILL CHECK ON NEXT INSPECTION. | |||
| LINTEL | 07/07/2009 | APPROVED | CMINI |
| FOUNDATION SURVEY APPROVED BY ZONING | 07/06/2009 | APPROVED | BBARTON |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 07/06/2009 | APPROVED | WKINELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 06/26/2009 | APPROVED | CMINI |
| FIRST ROUGH PLUMBING INSPECTION | 06/24/2009 | APPROVED | ACOOPER |
Review History
| Department | Status | Date In | Date Out |
| BLD | CANCEL | 07/24/2009 | 07/24/2009 |
| Note: revision - wall connection to block - requested by inspector Contractor removed documents from file | |||
| ELEC | COMPLETE | 07/22/2009 | 07/22/2009 |
| Note: Released By: JJOSEPH revision - adding missing electricial in master bath | |||
| BLD | COMPLETE | 07/09/2009 | 07/09/2009 |
| Note: Released By: JJOSEPH changed product approval onexterior doors,sliding,windows | |||
| URB | COMPLETE | 05/11/2009 | 05/11/2009 |
| Note: Released By: JBEAUDET 5/11/09 (JB) TREE BARRICADES ARE INSTALLED. | |||
| URB | HOLD | 04/30/2009 | 04/30/2009 |
| Note: Held By: JBEAUDET 4/30/09 (JB) NEED TO INSTALL TREE BARRICADES AROUND ALL SAVED TREES .I CALLED AND LEFT A MESSAGE AND A FAX WITH SEAGATE HOMES | |||
| BLD | COMPLETE | 04/30/2009 | 04/30/2009 |
| Note: Released By: JMCGOWEN reviewed by Auba and checked by Joe M. | |||
| SW1 | COMPLETE | 04/29/2009 | 04/30/2009 |
| Note: Released By: LAPTEKAR Topo suvey notes that Lot 3 has FFE 28.96? | |||
| ZON | COMPLETE | 04/29/2009 | 04/30/2009 |
| Note: Released By: ECOYNE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 09/24/2009 |
| REINSPECTION FEE | ¤40.00 | 09/24/2009 |
| REVISION | ¤40.00 | 09/24/2009 |
| REVISION | ¤40.00 | 09/24/2009 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 05/18/2009 |
| SITE PLAN 20 | ¤20.00 | 05/18/2009 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/18/2009 |
| TRANS IMPACT FEE 6 - RESIDENTI | ¤3,841.11 | 05/18/2009 |
| NEW RESIDENTIAL INSPECTIONS | ¤506.00 | 05/18/2009 |
| BUILDING CODE ADMIN FUND | ¤15.19 | 05/18/2009 |
| ELECTRIC FEE | ¤211.80 | 05/18/2009 |
| FIRE COMM IMPACT FEE 4/1/09 | ¤190.48 | 05/18/2009 |
| MECHANICAL FEE | ¤211.80 | 05/18/2009 |
| PERMIT FEE | ¤20.00 | 05/18/2009 |
| PARKS IMPACT FEE 4/1/09 | ¤1,230.83 | 05/18/2009 |
| PLAN CHECK FEE | ¤101.20 | 05/18/2009 |
| PLUMBING FEE | ¤211.80 | 05/18/2009 |
| RADON FEE | ¤15.19 | 05/18/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,415.40 |