I want to search for...
Permit #2009050692
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7063-00680-0100 |
| Total Square Footage: 1080 sqft |
| Block: 00680 |
| Subdivision: 2174 - SECTION 63-ZEBULAH'S TRAIL SEMINOLE WOODS |
| Job Phone: (386)774-9191 |
| Location Address: 46 ZEBULAH'S TR |
| Type: PO - POOL |
| Issue Date: 06/10/2009 |
| NOC: RECORDED |
| Applicant name: WILLIAM FRANKLIN COODY JR |
| Owner: JOHNSON, HAROLD & RHONDA |
|
Address 46 ZEBULAH'S TR PALM COAST, FL 32164 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤26,500.00 |
| Job Description: INGROUND POOL & 6 FT PRIVACY FENCE |
| Type: CN |
Contractor
BILL COODY CUSTOM POOLS INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
620 S VOLUSIA AVE ORANGE CITY, FL 32774 |
CPC1456731 (Exp: 08/31/2016) | (386)774-9191 | (386)774-9194 |
Sub Contractors
JEFFREY ADAM MCGREGOR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2400 MARSH ROAD DELAND, FL 32720 |
ER13013328 (Exp: 08/31/2014) | (386)736-7475 | (386)785-1503 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL - FINAL | 02/08/2010 | FINAL APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| POOL - FINAL | 11/19/2009 | Disapproved -FEE REQUIRED | ACOOPER |
| Note: THIS IS A REINSPECTION Inspection Resulted at 11/19/2009 2:40:30 PM WORKSHEET, TDH AND OTHER MEASUREMENT SHEET IS MISSING. UNABLE TO DETERMINE TDH WITHOUT GRAPHING AND PERMITTED TDH. | |||
| POOL - FINAL | 09/16/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 9/16/2009 10:05:23 AM VACUUM GAUGE IS NOT PRESENT TO VERIFY TDH. | |||
| UTILITY COMPANY FINAL | 09/16/2009 | APPROVED | TSCHWEERS |
| STORMWATER FINAL INSPECTION | 09/14/2009 | APPROVED | GLALIMA |
| Note: 6/10/09 GL met with contractor 6/24/09 site check ok per GL\\wk 9/10/09 GL checked site for grade//ok | |||
| FOUNDATION SURVEY APPROVED BY ZONING | 09/11/2009 | APPROVED | ECOYNE |
| ELEC & ALARM | 07/31/2009 | APPROVED | RMARVEL |
| POOL DECK INSPECTION | 07/09/2009 | APPROVED | JHINDMAN |
| STEEL & GROUND | 06/23/2009 | APPROVED | JHINDMAN |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/12/2010 | 01/12/2010 |
| Note: Released By: FREODICA Revision for TDH form | |||
| ZON | COMPLETE | 06/08/2009 | 06/08/2009 |
| Note: Released By: BBARTON Equipment pad on site plan Proposed & existing grade on site plan Cut sheets for pump, filter & main drain set back on site plan FYI: Distance was need from pep panel not from pep lid. | |||
| SW1 | COMPLETE | 06/08/2009 | 06/08/2009 |
| Note: Released By: LAPTEKAR added grading plan and equipment pad to the site plan | |||
| BLD | COMPLETE | 06/08/2009 | 06/08/2009 |
| Note: Released By: JJOSEPH | |||
| BLD | HOLD | 06/02/2009 | 06/02/2009 |
| Note: Held By: JMCGOWEN provide cut sheets for pool pump, filter,and main drain,cover. provide fence contractor to be used as your subcontractor. | |||
| SW1 | HOLD | 06/01/2009 | 06/02/2009 |
| Note: Held By: LAPTEKAR 1. Site plan missing equipment pads 2. Missing lot grading plan...need proposed grades next to exisiting grades...the deck FFE, etc. (Note if existing grades to remain the same please not that on the site plan) 6/2/09 faxed | |||
| ZON | HOLD | 05/29/2009 | 06/01/2009 |
| Note: Held By: BBARTON 1. The site plans are missing the setbacks (write setbacks on site plans) 2. Show the equipment pad on the site plans 3. Show the pep tank and panel on the site plans, write the distance between the pep panel and the fence (there is a 3 foot minimum required distance) FYI: Equipment pads shall be screened by contractor and/or property owner with visual buffer planting, when visible from rights-of-way, parking areas, or adjacent properties. In lieu of a visual buffer planting, solid decorative fencing or walls may be installed to screen from public view. Plants used shall be native or shall be vegetation that conserves water, is adaptable to local conditions, and is drought tolerant. Landscaping is to be a minimum 3 gallons in size, installed 3' on center. Landscaping is required along the front of the fence facing the roadway. 3 gallon plants installed 3 feet on center. emailed and faxed hold comments to contractor 06/01/09 @ 1:38 pm |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 02/05/2010 |
| REINSPECTION FEE | ¤40.00 | 12/03/2009 |
| REINSPECTION FEE | ¤40.00 | 09/16/2009 |
| PERMIT FEE | ¤180.00 | 06/10/2009 |
| SITE PLAN 20 | ¤20.00 | 06/10/2009 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/10/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤400.00 |