Permit #2009060749

Permit Details

Status: COED

Parcel Id: 07-11-31-1090-00000-00B0
Subdivision: 1228 - SOUTHWEST QUADRANT
Job Phone: 386-585-0410
Location Address: 160 CYPRESS POINT PKWY
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 07/16/2009
NOC: Unknown
Applicant name: THOMAS M SCAGLIONE
Owner: ASNACO LLC

Address

PO BOX 953966

LAKE MARY, FL 32795

Lot: B
Contracted Stated Job Value: ¤800.00
Job Description: BLDG. A UNIT 210 & 211--- DEMO WALL & BUILD PARTITION WALLS FOR "KINGDOM TO AMERICA MINISTRIES"
Type: CN

Contractor

T-CON GROUP, INC.
Status Location Address State License Number Phone
CANCEL

3246 NORTH POWERLINE ROAD

POMPANO BEACH, FL 33069

CBC1251999 (Exp: 08/31/2020) 954-825-8369

Sub Contractors

CHARLES RICHARD NAVAS JR
Status Location Address State License Number Phone
ACTIVE

PO BOX 353645

PALM COAST, FL 32164

CFC1427794 (Exp: 08/31/2026) 386-447-9521
JOHN R JOHNSON
Status Location Address State License Number Phone Fax
CANCEL

12 SEAMAN TRAIL EAST

PALM COAST, FL 32164

ER13012527 (Exp: 08/31/2014) (386)627-0236 (386) 586-5944

Inspection History

Type Request Date Result Inspector
COMMERCIAL BUILDING FINAL 09/10/2009 FINAL APPROVED CMINI
FIRE FINAL 09/10/2009 APPROVED JPATTEE
Note: Certify fire extinguishers move exit sign over east door remove clip from fire sprinkler head (ladies restroom) remove cover for fire sprinkler head in hvac closet remove multi plug adapters X3
UTILITY COMMERCIAL FINAL 08/19/2009 APPROVED CJOHNSON
UTILITY COMPANY FINAL 08/19/2009 APPROVED CJOHNSON
ELECTRICAL FINAL 08/19/2009 APPROVED RMARVEL
COMMERCIAL POWER INSPECTION 07/22/2009 APPROVED RMARVEL
SECOND ROUGH PLUMBING INSPECTION 07/22/2009 APPROVED JHINDMAN
ABOVE CEILING 07/22/2009 APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 7/22/2009 3:26:20 PM ELECTRIC ONLY.
2ND ROUGH ELECTRICAL 07/21/2009 APPROVED RMARVEL
FRAMING 07/21/2009 APPROVED CMINI
FIRST ROUGH PLUMBING INSPECTION 07/21/2009 APPROVED JHINDMAN
DEMOLITION INSPECTION 07/21/2009 APPROVED CMINI

Review History

Department Status Date In Date Out
PLUM COMPLETE 07/10/2009 07/10/2009
Note: Released By: FREODICA REVISED DRAWING TO REFLECT MEN & WOMEN B.R. NOTED WATER BOTTLE LOCATION PROVEDE PLUMBING SUBMITTED PLUMBING CONTRACTOR NAME
ELEC COMPLETE 07/08/2009 07/08/2009
Note: Released By: SKNOPF Approved for Release.
PLUM HOLD 07/08/2009 07/08/2009
Note: Held By: FREODICA Added utility sink provided plumbing diagram for sink Review comments for submitted corrections: Previous comments dated 7/1/2009 need to be addressed as follows: 1. Item (1) - revise plan to indicate separate facility for each sex. 2. Item (2) - Provide drinking fountain - Please see FPC 2007 Section 420. 3. Item (3) - Provide plumbing layout and riser diagram showing the connections of additional fixtures to the existing plumbing system. 4. Item (4) - Submitted plumbing subcontractor is not registered in the city.
UD1 COMPLETE 07/02/2009 07/07/2009
Note: Released By: CJOHNSON
FI1 COMPLETE 07/01/2009 07/01/2009
Note: Released By: JPATTEE Relocate manual pull station to within 5ft of relocated exit door
MECH COMPLETE 07/01/2009 07/01/2009
Note: Released By: FREODICA 1. Not applicable. No change in HVAC system.
PLUM HOLD 07/01/2009 07/01/2009
Note: Held By: FREODICA 1. Existing unisex h.c. toilets shall be renamed as as a separate facilities for men and women per FPC 2007 Section 403.2. 2. Provide (1) drinking fountain and (1) service sink to comply with FPC 2007 Table 403.1 for the minimum number of required plumbing fixtures. 3. Provide plumbing layout and riser diagram showing the connections of the additional fixtures as described above (item 2) to existing plumbing system. 4. Provide plumbing sub-contractor to the permit application.
BLD COMPLETE 06/30/2009 06/30/2009
Note: Released By: JJOSEPH
ELEC HOLD 06/30/2009 06/30/2009
Note: Held By: LHITES 1.) Provide electrical contractor and electrical scope of work
ZON COMPLETE 06/30/2009 06/30/2009
Note: Released By: ECOYNE

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN COMMERCIAL ¤60.00 07/16/2009
BUILDING DISCOUNT 100% (¤352.30) 07/16/2009
ELECTRIC FEE ¤60.48 07/16/2009
FIRE PLANS REVIEW ¤25.00 07/16/2009
MECHANICAL FEE ¤60.48 07/16/2009
PERMIT FEE ¤50.00 07/16/2009
PLAN CHECK FEE ¤100.00 07/16/2009
PLUMBING FEE ¤60.48 07/16/2009
SITE PLAN 20 ¤20.00 07/16/2009
Fees Total Due: ¤0.00 Total Paid: ¤84.14