I want to search for...
Permit #2009060749
Permit Details
Status: COED
| Parcel Id: 07-11-31-1090-00000-00B0 |
| Subdivision: 1228 - SOUTHWEST QUADRANT |
| Job Phone: 386-585-0410 |
| Location Address: 160 CYPRESS POINT PKWY |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 07/16/2009 |
| NOC: Unknown |
| Applicant name: THOMAS M SCAGLIONE |
| Owner: ASNACO LLC |
|
Address PO BOX 953966 LAKE MARY, FL 32795 |
| Lot: B |
| Contracted Stated Job Value: ¤800.00 |
| Job Description: BLDG. A UNIT 210 & 211--- DEMO WALL & BUILD PARTITION WALLS FOR "KINGDOM TO AMERICA MINISTRIES" |
| Type: CN |
Contractor
T-CON GROUP, INC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
3246 NORTH POWERLINE ROAD POMPANO BEACH, FL 33069 |
CBC1251999 (Exp: 08/31/2020) | 954-825-8369 |
Sub Contractors
CHARLES RICHARD NAVAS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 353645 PALM COAST, FL 32164 |
CFC1427794 (Exp: 08/31/2026) | 386-447-9521 |
JOHN R JOHNSON
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12 SEAMAN TRAIL EAST PALM COAST, FL 32164 |
ER13012527 (Exp: 08/31/2014) | (386)627-0236 | (386) 586-5944 |
Inspection History
| Type | Request Date | Result | Inspector |
| COMMERCIAL BUILDING FINAL | 09/10/2009 | FINAL APPROVED | CMINI |
| FIRE FINAL | 09/10/2009 | APPROVED | JPATTEE |
| Note: Certify fire extinguishers move exit sign over east door remove clip from fire sprinkler head (ladies restroom) remove cover for fire sprinkler head in hvac closet remove multi plug adapters X3 | |||
| UTILITY COMMERCIAL FINAL | 08/19/2009 | APPROVED | CJOHNSON |
| UTILITY COMPANY FINAL | 08/19/2009 | APPROVED | CJOHNSON |
| ELECTRICAL FINAL | 08/19/2009 | APPROVED | RMARVEL |
| COMMERCIAL POWER INSPECTION | 07/22/2009 | APPROVED | RMARVEL |
| SECOND ROUGH PLUMBING INSPECTION | 07/22/2009 | APPROVED | JHINDMAN |
| ABOVE CEILING | 07/22/2009 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 7/22/2009 3:26:20 PM ELECTRIC ONLY. | |||
| 2ND ROUGH ELECTRICAL | 07/21/2009 | APPROVED | RMARVEL |
| FRAMING | 07/21/2009 | APPROVED | CMINI |
| FIRST ROUGH PLUMBING INSPECTION | 07/21/2009 | APPROVED | JHINDMAN |
| DEMOLITION INSPECTION | 07/21/2009 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| PLUM | COMPLETE | 07/10/2009 | 07/10/2009 |
| Note: Released By: FREODICA REVISED DRAWING TO REFLECT MEN & WOMEN B.R. NOTED WATER BOTTLE LOCATION PROVEDE PLUMBING SUBMITTED PLUMBING CONTRACTOR NAME | |||
| ELEC | COMPLETE | 07/08/2009 | 07/08/2009 |
| Note: Released By: SKNOPF Approved for Release. | |||
| PLUM | HOLD | 07/08/2009 | 07/08/2009 |
| Note: Held By: FREODICA Added utility sink provided plumbing diagram for sink Review comments for submitted corrections: Previous comments dated 7/1/2009 need to be addressed as follows: 1. Item (1) - revise plan to indicate separate facility for each sex. 2. Item (2) - Provide drinking fountain - Please see FPC 2007 Section 420. 3. Item (3) - Provide plumbing layout and riser diagram showing the connections of additional fixtures to the existing plumbing system. 4. Item (4) - Submitted plumbing subcontractor is not registered in the city. | |||
| UD1 | COMPLETE | 07/02/2009 | 07/07/2009 |
| Note: Released By: CJOHNSON | |||
| FI1 | COMPLETE | 07/01/2009 | 07/01/2009 |
| Note: Released By: JPATTEE Relocate manual pull station to within 5ft of relocated exit door | |||
| MECH | COMPLETE | 07/01/2009 | 07/01/2009 |
| Note: Released By: FREODICA 1. Not applicable. No change in HVAC system. | |||
| PLUM | HOLD | 07/01/2009 | 07/01/2009 |
| Note: Held By: FREODICA 1. Existing unisex h.c. toilets shall be renamed as as a separate facilities for men and women per FPC 2007 Section 403.2. 2. Provide (1) drinking fountain and (1) service sink to comply with FPC 2007 Table 403.1 for the minimum number of required plumbing fixtures. 3. Provide plumbing layout and riser diagram showing the connections of the additional fixtures as described above (item 2) to existing plumbing system. 4. Provide plumbing sub-contractor to the permit application. | |||
| BLD | COMPLETE | 06/30/2009 | 06/30/2009 |
| Note: Released By: JJOSEPH | |||
| ELEC | HOLD | 06/30/2009 | 06/30/2009 |
| Note: Held By: LHITES 1.) Provide electrical contractor and electrical scope of work | |||
| ZON | COMPLETE | 06/30/2009 | 06/30/2009 |
| Note: Released By: ECOYNE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN COMMERCIAL | ¤60.00 | 07/16/2009 |
| BUILDING DISCOUNT 100% | (¤352.30) | 07/16/2009 |
| ELECTRIC FEE | ¤60.48 | 07/16/2009 |
| FIRE PLANS REVIEW | ¤25.00 | 07/16/2009 |
| MECHANICAL FEE | ¤60.48 | 07/16/2009 |
| PERMIT FEE | ¤50.00 | 07/16/2009 |
| PLAN CHECK FEE | ¤100.00 | 07/16/2009 |
| PLUMBING FEE | ¤60.48 | 07/16/2009 |
| SITE PLAN 20 | ¤20.00 | 07/16/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤84.14 |