Permit #2009070568
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-RP N -0011 |
| Total Square Footage: 1179 sqft |
| Block: RP N |
| Subdivision: - |
| Job Phone: (386) 445-1342 |
| Location Address: 2 PINE LAKES PKWY N |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 07/30/2009 |
| NOC: RECORDED |
| Applicant name: GIULIO LANCIA |
| Owner: PINE LAKES PROPERTIES LLC |
|
Address PO BOX 1260 FLAGLER BEACH, FL 32136 |
| Lot: 0011 |
| Contracted Stated Job Value: ¤20,000.00 |
| Job Description: SUITE 2-- " EDWARD JONES INVESTMENTS" |
| Type: CN |
Contractor
LANCIA CUSTOM HOMES, INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P. O. Box 351602 FLAGLER BEACH , FL 32136 |
CBC047064 (Exp: 08/31/2018) | (386) 445-1342 | (386)445-7509 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
CHRIS C KOONTZ
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
651 CARSWELL AVE Holly Hill, FL 32117 |
CAC035563 (Exp: 08/31/2024) | (386) 252-1878 | (386)252-9703 |
ALFERD MITCHUM FUTCH
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1218 San Jose Blvd Holly Hill, FL 32117 |
CFC044175 (Exp: 08/31/2012) | (386) 672-3576 | (386)672-0107 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRICAL FINAL | 09/16/2009 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION REQUESTED BY CONTRACTOR | |||
| COMMERCIAL BUILDING FINAL | 09/16/2009 | FINAL APPROVED | CMINI |
| Note: THIS IS A REINSPECTION REQUESTED BY CONTRACTOR | |||
| UTILITY COMMERCIAL FINAL | 09/14/2009 | APPROVED | DSPENCER |
| UTILITY COMPANY FINAL | 09/14/2009 | APPROVED | DSPENCER |
| FIRE FINAL | 09/14/2009 | APPROVED | JPATTEE |
| COMMERCIAL BUILDING FINAL | 09/14/2009 | CANCELLED BY APPLICANT | CMINI |
| ELECTRICAL FINAL | 09/14/2009 | CANCELLED BY APPLICANT | RMARVEL |
| PLUMBING FINAL | 09/14/2009 | APPROVED | JHINDMAN |
| H.V.A.C. FINAL | 09/14/2009 | APPROVED | JHINDMAN |
| INSULATION INSPECTION | 08/24/2009 | APPROVED | CMINI |
| SECOND ROUGH PLUMBING INSPECTION | 08/20/2009 | APPROVED | JHINDMAN |
| 2ND ROUGH ELECTRICAL | 08/20/2009 | APPROVED | RMARVEL |
| COMMERCIAL POWER INSPECTION | 08/20/2009 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 8/20/2009 2:19:43 PM COURTEAUX | |||
| FRAMING | 08/20/2009 | APPROVED | CMINI |
| H.V.A.C. ROUGH | 08/20/2009 | APPROVED | JHINDMAN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 09/15/2009 | 09/15/2009 |
| Note: Released By: FREODICA Revision Electrical panel schedule was revised to match job panel as layed out. Approved for Released per L. Hites | |||
| MECH | COMPLETE | 08/25/2009 | 08/25/2009 |
| Note: Released By: FREODICA 1. Changed name brand of condenser unit from carier to bryant (also made by carier). | |||
| ELEC | COMPLETE | 08/24/2009 | 08/24/2009 |
| Note: Released By: SKNOPF revision - electricial items the inspector saw that wasn't on the plans & change name brand of air compressor Approved for Release. Revision - Change 2 duplex receptacles to quad receptacles. Added 1 duplex at front reception, added 2 junction boxes/receptacles, and added a timer switch in corridor. | |||
| MECH | HOLD | 08/24/2009 | 08/24/2009 |
| Note: Held By: FREODICA revision - electricial items the inspector saw that wasn't on the plans & change name brand of air compressor Review comment: 1. Provide the size of the new condenser unit (CU) to be used that will match with the existing Air handling unit (AHU). | |||
| MECH | COMPLETE | 07/30/2009 | 07/30/2009 |
| Note: Released By: FREODICA Mechanical correction | |||
| PLUM | COMPLETE | 07/29/2009 | 07/29/2009 |
| Note: Released By: FREODICA | |||
| MECH | HOLD | 07/29/2009 | 07/29/2009 |
| Note: Held By: FREODICA correction - ac corrections 1. Provide location of condenser unit. If located on roof, anchoring detail shall be signed and sealed by FL design professinal. 2. Provide energy calculations. | |||
| UD1 | COMPLETE | 07/28/2009 | 07/29/2009 |
| Note: Released By: CJOHNSON | |||
| ZON | COMPLETE | 07/27/2009 | 07/27/2009 |
| Note: Released By: BBARTON verified use interior alterations only | |||
| BLD | COMPLETE | 07/27/2009 | 07/28/2009 |
| Note: reviewed by Larry H. and checked by Joe M. | |||
| ELEC | COMPLETE | 07/27/2009 | 07/27/2009 |
| Note: Released By: JMCGOWEN | |||
| FI1 | COMPLETE | 07/27/2009 | 07/28/2009 |
| Note: Released By: JPATTEE | |||
| MECH | HOLD | 07/27/2009 | 07/27/2009 |
| Note: Held By: FREODICA 1. Provide hvac air supply distribution to each diffuser in CFM. 2. Provide hvac unit and exhaust fan specification. 3. Provide ductwork material specification. | |||
| PLUM | HOLD | 07/27/2009 | 07/27/2009 |
| Note: Held By: JMCGOWEN accessible toilet requires 18 inches from side wall to center of fixture |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 09/15/2009 |
| REVISION | ¤40.00 | 09/09/2009 |
| REVISION | ¤40.00 | 09/09/2009 |
| SITE PLAN 20 | ¤20.00 | 07/30/2009 |
| ADMIN COMMERCIAL | ¤60.00 | 07/30/2009 |
| BUILDING DISCOUNT 100% | (¤464.40) | 07/30/2009 |
| ELECTRIC FEE | ¤72.00 | 07/30/2009 |
| FIRE PLANS REVIEW | ¤25.00 | 07/30/2009 |
| MECHANICAL FEE | ¤72.00 | 07/30/2009 |
| PERMIT FEE | ¤140.00 | 07/30/2009 |
| PLAN CHECK FEE | ¤100.00 | 07/30/2009 |
| PLUMBING FEE | ¤72.00 | 07/30/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤216.60 |