I want to search for...
Permit #2009090281
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7026-00740-0290 |
| Total Square Footage: 1395 sqft |
| Block: 00740 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: (386)447-3390 |
| Location Address: 76 PINE GROVE DR |
| Type: PO - POOL |
| Issue Date: 09/21/2009 |
| NOC: RECORDED |
| Applicant name: JASON BRET PAVLOW |
| Owner: SHOMAR, HENNY A & JULIE B |
|
Address 76 PINE GROVE DR PALM COAST, FL 32164 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤41,500.00 |
| Job Description: POOL W/SCREEN ENCLOSURE |
| Type: CN |
Contractor
WATERSIDE POOLS INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST , FL 32137 |
#3K PALM COAST , FL 32137 |
CPC1457358 (Exp: 08/31/2026) | (386)447-3390 | (386)447-3391 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 2413 Bunnell, FL 32110 |
EC13002161 (Exp: 08/31/2026) | (386) 437-2966 | 386-437-5042 |
ANDREA L JONES
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
155 DAWSON BROWN RD. DE LEON SPRINGS, FL 32130 |
SCC131149810 (Exp: 08/31/2026) | 850-640-9350 | 866-344-3908 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL - FINAL | 01/13/2010 | FINAL APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| POOL - FINAL | 12/15/2009 | Disapproved -FEE REQUIRED | ACOOPER |
| Note: THIS IS A REINSPECTION Inspection Requested at 12/14/2009 4:26:10 PM JOB IS OK, BUT 2 SPD. PUMP NEEDS BE ON HIGH SPEED Inspection Resulted at 12/15/2009 3:35:11 PM PUMP INSTALLED IS A DUAL SP165Z2BC RATED AT 1.5 HP. LARGER AND DIFFERENT FROM SUBMITTED PUMP. RESUBMIT REVISION AND NEW TDH CALCS. AND IT WILL BE RECHECKED WITH NEW CALCS. | |||
| POOL - FINAL | 12/11/2009 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 12/11/2009 2:56:42 PM VACUUM GAUGE IS NOT REGISTERING ANY VACUUM. | |||
| STORMWATER FINAL INSPECTION | 12/10/2009 | APPROVED - AS NOTED | JCOLASANTI |
| Note: Pre-inspect 9/16/09 10 SF existing road damage on left side. No damage across the street per GL\\wk 12/1/09 JC met with contractor for grade advice//la 12/10/09 ...10 sq ft of road damage was existing// | |||
| UTILITY COMPANY FINAL | 12/10/2009 | APPROVED | MBACON |
| FOUNDATION SURVEY APPROVED BY ZONING | 12/03/2009 | APPROVED | BBARTON |
| ELEC & ALARM | 11/03/2009 | APPROVED | RMARVEL |
| POOL DECK INSPECTION | 10/13/2009 | APPROVED | ACOOPER |
| Note: Jason called to schedule this inspection | |||
| STEEL & GROUND | 09/24/2009 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/12/2010 | 01/12/2010 |
| Note: Released By: JJOSEPH revison - different size pump and changes in the cals. | |||
| BLD | COMPLETE | 11/18/2009 | 11/18/2009 |
| Note: Released By: JJOSEPH revision no vent line off main drain 1 copy submitted ok per AUBA | |||
| BLD | COMPLETE | 09/15/2009 | 09/15/2009 |
| Note: Released By: JJOSEPH | |||
| ZON | COMPLETE | 09/15/2009 | 09/15/2009 |
| Note: Released By: ECOYNE | |||
| SW1 | COMPLETE | 09/15/2009 | 09/15/2009 |
| Note: Released By: LAPTEKAR corrected grading plan | |||
| SW1 | HOLD | 09/14/2009 | 09/15/2009 |
| Note: Held By: LAPTEKAR 1. Grading plan missing proposed elevation of the pool deck//flow arrows on site plan show flow offsite to the rear properties//need more grade proposals to identify how the rear yard will drain 9/15/09 emailed | |||
| ZON | HOLD | 09/11/2009 | 09/14/2009 |
| Note: Held By: ECOYNE provide information as to whether tress will be removed for pool/deck construction provide landscaping around pool equipment faxed 11:18am |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 01/12/2010 |
| REINSPECTION FEE | ¤40.00 | 12/14/2009 |
| REVISION | ¤40.00 | 11/18/2009 |
| SITE PLAN 20 | ¤20.00 | 09/21/2009 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/21/2009 |
| BUILDING DISCOUNT 100% | (¤162.00) | 09/21/2009 |
| PERMIT FEE | ¤180.00 | 09/21/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤238.00 |