Permit #2009090670
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-1090-00000-00B0 |
| Total Square Footage: 2595 sqft |
| Subdivision: 1228 - SOUTHWEST QUADRANT |
| Job Phone: 386-338-7785 |
| Location Address: 160 CYPRESS POINT PKWY |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 10/09/2009 |
| NOC: Unknown |
| Applicant name: THOMAS M SCAGLIONE |
| Owner: ASNACO LLC C/O INTERSTATE HOLDINGS INC |
|
Address 1307 S INTERNATIONAL PKWY LAKE MARY, FL 32746 |
|
Address SUITE 2051 LAKE MARY, FL 32746 |
| Contracted Stated Job Value: ¤1,000.00 |
| Job Description: BLDG. B UNIT 206/207-- CONSTRUCT PARTITION WALLS |
| Type: CN |
Contractor
T-CON GROUP, INC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
3246 NORTH POWERLINE ROAD POMPANO BEACH, FL 33069 |
CBC1251999 (Exp: 08/31/2020) | 954-825-8369 |
Sub Contractors
HAROLD C WINTZ
| Status | Location Address | State License Number | Phone |
| CANCEL |
1721 Palm Road Ormond Beach, FL 32174 |
EC13001342 (Exp: 08/31/2018) | (386) 212-4786 |
Inspection History
| Type | Request Date | Result | Inspector |
| FIRE FINAL | 03/08/2011 | FINAL APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| COMMERCIAL BUILDING FINAL | 03/04/2011 | APPROVED | RMARVEL |
| UTILITY COMMERCIAL FINAL | 03/04/2011 | APPROVED | DSPENCER |
| UTILITY COMPANY FINAL | 03/04/2011 | APPROVED | DSPENCER |
| FIRE FINAL | 03/04/2011 | CANCELLED BY APPLICANT | LHITES |
| Note: Tom came in to cancel inspection. | |||
| COMMERCIAL POWER INSPECTION | 02/11/2011 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| COMMERCIAL POWER INSPECTION | 04/27/2010 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 4/27/2010 3:32:48 PM EMERGENCY LIGHT NEEDS TO BE INSTALLED OR BOX BLANKED FOR THIS INSPECTION SINCE THERE ARE NO LOCKS ARE INSTALLED ON PANELS. | |||
| 2ND ROUGH ELECTRICAL | 03/30/2010 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| COMMERCIAL POWER INSPECTION | 03/26/2010 | CANCELLED BY APPLICANT | RMARVEL |
| 2ND ROUGH ELECTRICAL | 03/26/2010 | CANCELLED BY APPLICANT | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 03/24/2010 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| 2ND ROUGH ELECTRICAL | 03/24/2010 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/24/2010 2:51:06 PM NEED TO REPLACE OVERBENT BROKEN M.C .... NEED NAIL PLATE WHERE M.C IS LESS THAN 1- 1/4" TO FRAMING MEMBER | |||
| FRAMING | 01/27/2010 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 1/27/2010 2:11:03 PM PLAN SPECIFIES METAL STUD FRAMING WOOD FRAMING INSTALLED NEED REVISION....WALLS NOT ALL INSTALLED PER PLAN.. | |||
| 2ND ROUGH ELECTRICAL | 01/27/2010 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 1/27/2010 3:24:46 PM ELECTRICAL IS NOT COMPLETE. DOES NOT MATCH PLANS. |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 03/23/2010 | 03/23/2010 |
| Note: Released By: LHITES only adding 3 receptacles instead of 6 per print/crossed iff akk receptacles not being put in run 3 recep to 20amp breaker all ran in 12-2 m.c cable stapled and fire caulked wall circuit #30 | |||
| FD1 | COMPLETE | 03/01/2010 | 03/01/2010 |
| Note: Released By: JPATTEE | |||
| BLD | COMPLETE | 02/26/2010 | 03/01/2010 |
| Note: Released By: JJOSEPH Revision Indicated emergency light locations and exit lights. Changed office to reception | |||
| BLD | HOLD | 02/09/2010 | 02/09/2010 |
| Note: Held By: JMCGOWEN Revision change framing material from metal studs to wood framing, eliminated some partition walls and changed lat out in206(doors) provide revised locations of emergency lights and exit lights, the office that egresses through an other office is prohibited as per FBC 1014.2 | |||
| FD1 | HOLD | 02/09/2010 | 02/10/2010 |
| Note: Held By: JPATTEE Comments and revisions are confusing, what is the work to be done? Where? | |||
| FI1 | COMPLETE | 10/07/2009 | 10/08/2009 |
| Note: Released By: JPATTEE | |||
| BLD | COMPLETE | 10/07/2009 | 10/07/2009 |
| Note: Released By: JJOSEPH Correction REMOVE WATER HEATER OFF PLAN CHANGE DOOR SWING ADD SPRING HINGE DOOR CLOSURES TO B.R NOTE ON LEVEL DOORS ADD WATER COOLER | |||
| PLUM | COMPLETE | 10/07/2009 | 10/07/2009 |
| Note: Released By: FREODICA | |||
| ELEC | COMPLETE | 10/02/2009 | 10/02/2009 |
| Note: Released By: LHITES | |||
| PLUM | HOLD | 10/01/2009 | 10/01/2009 |
| Note: Held By: FREODICA 1. Provide drinking fountain per FPC 2007 Table 403.1. | |||
| BLD | HOLD | 10/01/2009 | 10/01/2009 |
| Note: Held By: JMCGOWEN panel squedules provide self closing door hardware for rest room door that swings in to corridor | |||
| BLD | HOLD | 09/30/2009 | 09/30/2009 |
| Note: Held By: JJOSEPH 1.Revise the restroom doors as per section 1008.1.8 of the FBC 2007 to provide hardware. | |||
| ELEC | HOLD | 09/30/2009 | 09/30/2009 |
| Note: Held By: LHITES 1.) Provide panel locations,schedule,and load calculations. 2.) Provide power and lighting circuits. 3.) Provide water heater size.. these units have existing insta-hot in bathrooms. | |||
| FI1 | HOLD | 09/30/2009 | 10/01/2009 |
| Note: Held By: JPATTEE Does this unit have emergency lights? Change bathroom door swing on both. What is a sensor? | |||
| PLUM | HOLD | 09/30/2009 | 09/30/2009 |
| Note: Held By: FREODICA 1. Plan shows water heaters in mechanical rooms. Clarify where those water heaters are intended to be used as the existing restrooms have instant heaters already installed. | |||
| ZON | COMPLETE | 09/30/2009 | 09/30/2009 |
| Note: Released By: BBARTON interior office renevations only |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FIRE PLANS REVIEW | ¤25.95 | 10/09/2009 |
| PERMIT FEE | ¤50.00 | 10/09/2009 |
| PLAN CHECK FEE | ¤100.00 | 10/09/2009 |
| PLUMBING FEE | ¤60.60 | 10/09/2009 |
| RADON FEE | ¤12.98 | 10/09/2009 |
| ADMIN COMMERCIAL | ¤60.00 | 10/09/2009 |
| BUILDING CODE ADMIN FUND | ¤12.98 | 10/09/2009 |
| BUILDING DISCOUNT 100% | (¤298.08) | 10/09/2009 |
| ELECTRIC FEE | ¤60.60 | 10/09/2009 |
| SITE PLAN 20 | ¤20.00 | 10/09/2009 |
| ADDITIONAL FEE | ¤40.00 | |
| EXTENSION | ¤40.00 | |
| REINSPECTION FEE | ¤40.00 | |
| REINSPECTION FEE | ¤40.00 | |
| REINSPECTION FEE | ¤40.00 | |
| REINSPECTION FEE | ¤40.00 | |
| REVISION | ¤80.00 | |
| REVISION | ¤40.00 | |
| Fees | Total Due: ¤360.00 | Total Paid: ¤105.03 |