I want to search for...

Permit #2009100187

Permit Details

Status: COED

Parcel Id: 06-12-31-5825-00000-0090
Total Square Footage: 17565 sqft
Subdivision: 2088 - TOWN CENTER
Job Phone: (386)677-8736
Location Address: 145 CITY PL
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 11/02/2009
NOC: RECORDED
Applicant name: LEONARD MARINACCO
Owner: CITY CENTRE OF PALM COAST, INC.

Address

4B OLD KINGS RD NORTH

PALM COAST, FL 32137

Lot: 9
Contracted Stated Job Value: ¤40,000.00
Job Description: SUITE 200-- INTERIOR BUILDOUT FOR "ACI" - OFFICE FOR CLAIM SERVICE
Type: CN

Contractor

BOMAR CONSTRUCTION INC
Status Location Address State License Number Phone Fax
INACTIVE

27 S ORCHARD STREET

ORMOND BEACH, FL 32174

CGC015648 (Exp: 08/31/2022) (386)677-8736 (386)677-7726

Sub Contractors

MATTHEW JOHN WITTWER
Status Location Address State License Number Phone Fax
ACTIVE

231 JEAN STREET

DAYTONA BEACH, FL 32114

EC0002058 (Exp: 08/31/2026) (386)255-1418 (386)255-3429
DONALD G MEYER
Status Location Address State License Number Phone
CANCEL

P. O. Drawer 730008

Ormond Beach, FL 32174

CAC039739 (Exp: 08/31/2016) (386) 253-7774
ISAAC WALTER JOHNSTON
Status Location Address State License Number Phone
ACTIVE

887 BRENTWOOD DRIVE

Daytona Beach, FL 32117

CFC023634 (Exp: 08/31/2026) (386) 252-7047
ROBERT J CATES
Status Location Address State License Number Phone
INACTIVE

400 NORTH US HIGHWAY 1

ORMOND BEACH, FL 32174

EC13003957 (Exp: 08/31/2026) 386-672-8494

Inspection History

Type Request Date Result Inspector
COMMERCIAL BUILDING FINAL 04/01/2010 FINAL APPROVED RMARVEL
ELECTRICAL FINAL 03/31/2010 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
ELECTRICAL FINAL 03/29/2010 Disapproved -FEE REQUIRED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 3/29/2010 2:52:47 PM PANEL SCHEDULE LOADS DONT MATCH OCD IN PANELS. 5KW HEAT STRIPS WERE ADDED TO AHU NO REVISIONS NOTED. REVISE PLANS TO SHOW ADDITIONAL LOAD TO ELECTRICAL.
UTILITY COMMERCIAL FINAL 03/26/2010 APPROVED KKING
UTILITY COMPANY FINAL 03/26/2010 APPROVED KKING
ELECTRICAL FINAL 03/24/2010 Disapproved -FEE REQUIRED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 3/24/2010 3:22:55 PM PANELS SCHEDULES NOT PER PLANS. RECHECK APPROVED LOADS.
FIRE FINAL 03/19/2010 APPROVED JPATTEE
ELECTRICAL FINAL 03/17/2010 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 3/17/2010 3:15:18 PM MULTIPLE ISSUES NOT MATCHING PLANS. NEED REVISIONS.
PLUMBING FINAL 03/02/2010 APPROVED JHINDMAN
H.V.A.C. FINAL 03/02/2010 APPROVED JHINDMAN
Note: Inspection Resulted at 3/2/2010 1:17:46 PM INCLUDING THE ABOVE CEILING MECHANICAL IN CONFERENCE AND SERVER ROOMS.
H.V.A.C. FINAL 02/16/2010 CANCELLED BY APPLICANT AIRS WEB
2ND ROUGH ELECTRICAL 02/16/2010 CANCELLED BY INSPECTOR JHINDMAN
Note: Inspection Resulted at 2/16/2010 12:43:09 PM CONTRACTOR WANTED AN ABOVE CEILING INSPECTION.
ABOVE CEILING 02/16/2010 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 2/16/2010 12:43:09 PM ABOVE CEILING IS OK EXCEPT FOR CONFERENCE AND SERVER ROOMS.
ELECTRICAL FINAL 02/16/2010 CANCELLED BY APPLICANT AIRS WEB
FIREWALL FINAL INSPECTION 02/16/2010 PARTIALLY APPROVED JPATTEE
Note: Provide opening protection for wiring and conduit penetrating walls.
COMMERCIAL POWER INSPECTION 02/04/2010 APPROVED LHITES
Note: Inspection Resulted at 2/4/2010 10:27:42 AM CALLED FPL 10:35 HIGHLITED ON PLANS
2ND ROUGH ELECTRICAL 02/03/2010 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
COMMERCIAL POWER INSPECTION 02/03/2010 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 2/3/2010 3:13:52 PM NEED TORQUE WRENCH IS NEEDED FOR THIS INSPECTION.
2ND ROUGH ELECTRICAL 01/26/2010 PARTIALLY APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 1/26/2010 2:11:50 PM DRYWALLED PORTIONS OF CIELING. BATHROOMS AND LOBBY.
H.V.A.C. ROUGH 01/22/2010 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
FRAMING 12/23/2009 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 12/23/2009 11:25:34 AM NEED REVISION FOR DOOR LOCATION AND WALL CHANGES BY INSULATION.
H.V.A.C. ROUGH 12/22/2009 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 12/22/2009 3:50:05 PM SEAMS ON ROUND SUPPLY DUCT
2ND ROUGH ELECTRICAL 12/22/2009 PARTIALLY APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 12/22/2009 1:25:07 PM WALLS ONLY. HIGHLIGHTED ON PLANS.
INSULATION INSPECTION 12/18/2009 APPROVED CMINI
FRAMING 12/15/2009 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 12/15/2009 3:06:05 PM PARTIALL FRAMING ON METAL STUD WALLS WHERE ELEC. AND PLUMBING APPROVED.
2ND ROUGH ELECTRICAL 12/14/2009 PARTIALLY APPROVED RMARVEL
Note: Inspection Resulted at 12/14/2009 2:33:33 PM HIGHLIGHTED ON PLANS.
SECOND ROUGH PLUMBING INSPECTION 12/03/2009 APPROVED JHINDMAN
MONOLITHIC SLAB INSPECTION/SLAB 11/20/2009 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 11/20/2009 3:04:08 PM GENERATOR PAD.
UNDERGROUND ELECTRICAL 11/19/2009 APPROVED RMARVEL

Review History

Department Status Date In Date Out
ELEC COMPLETE 03/30/2010 03/30/2010
Note: Released By: LHITES Revision Final revised panel schedule including heat strips. Pwer engineer, load calculations do not change
ELEC COMPLETE 03/25/2010 03/26/2010
Note: Released By: SKNOPF panel schedule revisions per inspector's comments Approved for Release. Revision - adjusted panel schedules to reflect actual installation
ELEC COMPLETE 03/23/2010 03/23/2010
Note: Released By: LHITES Revision electrical revision and final as-builts per inspectors comments
ELEC COMPLETE 03/16/2010 03/16/2010
Note: Released By: LHITES REVISIONS PER PLAN REVIEW COMMENTS DATED 3/10/2010
ELEC HOLD 03/10/2010 03/10/2010
Note: Held By: SKNOPF Final design/as built CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2009100187 (ACI Palm Coast @ 145 City Place) 3/10/2010 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Please clarify circuit P3-5 which is shown for both EWH and AHU-8 on Sheet E1. 2. Clarify phase load totals for P2, P3, and P4, where it appears that the ACU is the larger of the non-coincidental loads. Please correct the loads in MDP accordingly. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 160 Cypress Point Pkwy Ste B106 Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
BLD COMPLETE 02/10/2010 02/10/2010
Note: Released By: JMCGOWEN response to review comments dated 2/5/2010
BLD HOLD 02/05/2010 02/05/2010
Note: Held By: JMCGOWEN revision- structure revisions for equip. loading requirements provide detail 1/SK-3 as called for on pageSK-1
ELEC COMPLETE 01/21/2010 01/21/2010
Note: Released By: SKNOPF revision to comment responses date 1/11/10 Approved for Release. Revision: Added receptacles and lighting. Added 100A power bus. Added SRV1 panel and feeder. Revised circuits. Replaced EWH with Insta-hots throughout. Updated panel schedules, actual loads and Electrical Riser.
BLD COMPLETE 01/21/2010 01/21/2010
Note: Released By: JMCGOWEN relocating door and wall layout
MECH COMPLETE 01/08/2010 01/08/2010
Note: Released By: FREODICA Revision: HVAC revision reflecting as-built conditions - Rev.2 dated 12/30/2009.
ELEC HOLD 01/08/2010 01/11/2010
Note: Held By: SKNOPF Misc electrical CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Permit #2009100187 (ACI Palm Coast @ 145 City Place) 1/11/2010 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Sheet E1: a. Revision replaced a 2P EWH with an Insta-Hot on the plan sheet for circuits P1-21 and P2-21, but the panel schedules have not been revised for circuit breaker sizes and loads. Submit plumbing revisions as needed for EWH changes to Insta-hots. b. Submit architectural wall and door changes for Office #2. c. Revision added a receptacle to P2-4, but panel loads still need to be updated. d. There are 4 receptacles in "A.D." room with no circuit identification. e. There is 1 receptacle in Lounge/Café with no circuit identification. f. Vending machines are still shown in same location in Lounge, but circuits and receptacles are no longer shown for this equipment. Please clarify. g. MDP-6 circuit is shown on the plans for both the inside unit and the rooftop unit. Please clarify. 2. Sheet E2: a. Multiple circuits have changed, but the panel load totals have not been updated. Please update the panel phase totals for the following panels: P3, P4, SRV, SRV1, and MDP. b. Coordinate loads for all circuit breakers in MDP and update MDP phase load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
ELEC COMPLETE 10/21/2009 10/21/2009
Note: Released By: LHITES Load calculations & generator specs per permit review comments
MECH COMPLETE 10/19/2009 10/19/2009
Note: Released By: FREODICA per plan review comment responses
ELEC HOLD 10/19/2009 10/19/2009
Note: Held By: LHITES 1. Please provide manufacturer specification sheets for ATS switch and generator. 2. Please provide complete load calculations for service, panels and all circuits.
UD1 COMPLETE 10/14/2009 10/15/2009
Note: Released By: CJOHNSON
FI1 COMPLETE 10/12/2009 10/14/2009
Note: Released By: JMONTARULI
MECH HOLD 10/12/2009 10/12/2009
Note: Held By: FREODICA 1. The city record shows there is an existing HVAC system layout (supplied by AHU-2) for the corridor and lobby under Permit No. 2007100054. The new proposed Mechanical Plan shows existing HVAC to remain on lobby only. Please clarify if the existing HVAC along the corridor would remain even if the corridor would be demolished. If not, provide HVAC demolition plan. 2. Provide the required outdoor ventilation air calculation per FMC 2007, Table 403.3. 3. Total supply air in CFM for Unit # 7 does not match with A/C Schedule. 4. Condesate drain layout for Units 5 thu 8 is missing. Provide type of material for condesate drain. Also, clarify Detail A/M1 for auxiliary drain pan which states "Cap for hose connection". 5. Bathroom #2 exhaust duct termination appears to be within 10 ft. from the existing AHU-2 outside air intake. Please clarify.
PLUM COMPLETE 10/12/2009 10/12/2009
Note: Released By: FREODICA
ELEC HOLD 10/09/2009 10/12/2009
Note: Held By: LHITES 1. Sheet E-1 panel P-2 shows circuits 8, 10 yet appears to be one circuit. 2. Sheet E-1 office #4 and motorized blinds has no circuit identification. 3. Sheet E-1 lounge outlets near data and on wall have no circuit identification 4. Sheet E-1 outlets near vending machines. Need panel identification. 5. Sheet E-1 ground conductor size on this sheet for ATS to generator shows 1/0. Sheet E-3 shows this conductor as 4/0 Please correct. 6. Sheet E-3. Panel P-4 does not have Acu-1 or 2, it has labeled acu 5 and 6 please correct. Please correct acu-7 circuit labeling. 13,17 on sheet E-3 but panel schedule has label of circuits 13,15 7. Provide complete load calculations for all panels and service
BLD COMPLETE 10/08/2009 10/09/2009
Note: Released By: JJOSEPH
ZON COMPLETE 10/07/2009 10/08/2009
Note: Released By: BBARTON

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 04/01/2010
REINSPECTION FEE ¤40.00 04/01/2010
REINSPECTION FEE ¤40.00 04/01/2010
REINSPECTION FEE ¤40.00 04/01/2010
REINSPECTION FEE ¤40.00 04/01/2010
REVISION ¤40.00 04/01/2010
REVISION ¤40.00 04/01/2010
REVISION ¤40.00 04/01/2010
REVISION ¤40.00 04/01/2010
REVISION ¤40.00 04/01/2010
REVISION ¤40.00 04/01/2010
REVISION ¤80.00 04/01/2010
REVISION ¤40.00 04/01/2010
REVISION ¤40.00 04/01/2010
SITE PLAN 20 ¤20.00 11/02/2009
BUILDING DISCOUNT 100% (¤622.80) 11/02/2009
ELECTRIC FEE ¤84.00 11/02/2009
FIRE PLANS REVIEW ¤175.65 11/02/2009
MECHANICAL FEE ¤84.00 11/02/2009
PERMIT FEE ¤280.00 11/02/2009
PLAN CHECK FEE ¤100.00 11/02/2009
PLUMBING FEE ¤84.00 11/02/2009
RADON FEE ¤87.83 11/02/2009
ADMIN COMMERCIAL ¤60.00 11/02/2009
BUILDING CODE ADMIN FUND ¤87.83 11/02/2009
Fees Total Due: ¤0.00 Total Paid: ¤1,040.51