I want to search for...
Permit #2009100187
Permit Details
Status: COED
| Parcel Id: 06-12-31-5825-00000-0090 |
| Total Square Footage: 17565 sqft |
| Subdivision: 2088 - TOWN CENTER |
| Job Phone: (386)677-8736 |
| Location Address: 145 CITY PL |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 11/02/2009 |
| NOC: RECORDED |
| Applicant name: LEONARD MARINACCO |
| Owner: CITY CENTRE OF PALM COAST, INC. |
|
Address 4B OLD KINGS RD NORTH PALM COAST, FL 32137 |
| Lot: 9 |
| Contracted Stated Job Value: ¤40,000.00 |
| Job Description: SUITE 200-- INTERIOR BUILDOUT FOR "ACI" - OFFICE FOR CLAIM SERVICE |
| Type: CN |
Contractor
BOMAR CONSTRUCTION INC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
27 S ORCHARD STREET ORMOND BEACH, FL 32174 |
CGC015648 (Exp: 08/31/2022) | (386)677-8736 | (386)677-7726 |
Sub Contractors
MATTHEW JOHN WITTWER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
231 JEAN STREET DAYTONA BEACH, FL 32114 |
EC0002058 (Exp: 08/31/2026) | (386)255-1418 | (386)255-3429 |
DONALD G MEYER
| Status | Location Address | State License Number | Phone |
| CANCEL |
P. O. Drawer 730008 Ormond Beach, FL 32174 |
CAC039739 (Exp: 08/31/2016) | (386) 253-7774 |
ISAAC WALTER JOHNSTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
887 BRENTWOOD DRIVE Daytona Beach, FL 32117 |
CFC023634 (Exp: 08/31/2026) | (386) 252-7047 |
ROBERT J CATES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
400 NORTH US HIGHWAY 1 ORMOND BEACH, FL 32174 |
EC13003957 (Exp: 08/31/2026) | 386-672-8494 |
Inspection History
| Type | Request Date | Result | Inspector |
| COMMERCIAL BUILDING FINAL | 04/01/2010 | FINAL APPROVED | RMARVEL |
| ELECTRICAL FINAL | 03/31/2010 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| ELECTRICAL FINAL | 03/29/2010 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/29/2010 2:52:47 PM PANEL SCHEDULE LOADS DONT MATCH OCD IN PANELS. 5KW HEAT STRIPS WERE ADDED TO AHU NO REVISIONS NOTED. REVISE PLANS TO SHOW ADDITIONAL LOAD TO ELECTRICAL. | |||
| UTILITY COMMERCIAL FINAL | 03/26/2010 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 03/26/2010 | APPROVED | KKING |
| ELECTRICAL FINAL | 03/24/2010 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 3/24/2010 3:22:55 PM PANELS SCHEDULES NOT PER PLANS. RECHECK APPROVED LOADS. | |||
| FIRE FINAL | 03/19/2010 | APPROVED | JPATTEE |
| ELECTRICAL FINAL | 03/17/2010 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 3/17/2010 3:15:18 PM MULTIPLE ISSUES NOT MATCHING PLANS. NEED REVISIONS. | |||
| PLUMBING FINAL | 03/02/2010 | APPROVED | JHINDMAN |
| H.V.A.C. FINAL | 03/02/2010 | APPROVED | JHINDMAN |
| Note: Inspection Resulted at 3/2/2010 1:17:46 PM INCLUDING THE ABOVE CEILING MECHANICAL IN CONFERENCE AND SERVER ROOMS. | |||
| H.V.A.C. FINAL | 02/16/2010 | CANCELLED BY APPLICANT | AIRS WEB |
| 2ND ROUGH ELECTRICAL | 02/16/2010 | CANCELLED BY INSPECTOR | JHINDMAN |
| Note: Inspection Resulted at 2/16/2010 12:43:09 PM CONTRACTOR WANTED AN ABOVE CEILING INSPECTION. | |||
| ABOVE CEILING | 02/16/2010 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 2/16/2010 12:43:09 PM ABOVE CEILING IS OK EXCEPT FOR CONFERENCE AND SERVER ROOMS. | |||
| ELECTRICAL FINAL | 02/16/2010 | CANCELLED BY APPLICANT | AIRS WEB |
| FIREWALL FINAL INSPECTION | 02/16/2010 | PARTIALLY APPROVED | JPATTEE |
| Note: Provide opening protection for wiring and conduit penetrating walls. | |||
| COMMERCIAL POWER INSPECTION | 02/04/2010 | APPROVED | LHITES |
| Note: Inspection Resulted at 2/4/2010 10:27:42 AM CALLED FPL 10:35 HIGHLITED ON PLANS | |||
| 2ND ROUGH ELECTRICAL | 02/03/2010 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| COMMERCIAL POWER INSPECTION | 02/03/2010 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 2/3/2010 3:13:52 PM NEED TORQUE WRENCH IS NEEDED FOR THIS INSPECTION. | |||
| 2ND ROUGH ELECTRICAL | 01/26/2010 | PARTIALLY APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/26/2010 2:11:50 PM DRYWALLED PORTIONS OF CIELING. BATHROOMS AND LOBBY. | |||
| H.V.A.C. ROUGH | 01/22/2010 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 12/23/2009 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/23/2009 11:25:34 AM NEED REVISION FOR DOOR LOCATION AND WALL CHANGES BY INSULATION. | |||
| H.V.A.C. ROUGH | 12/22/2009 | PARTIALLY APPROVED | JHINDMAN |
| Note: Inspection Resulted at 12/22/2009 3:50:05 PM SEAMS ON ROUND SUPPLY DUCT | |||
| 2ND ROUGH ELECTRICAL | 12/22/2009 | PARTIALLY APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/22/2009 1:25:07 PM WALLS ONLY. HIGHLIGHTED ON PLANS. | |||
| INSULATION INSPECTION | 12/18/2009 | APPROVED | CMINI |
| FRAMING | 12/15/2009 | PARTIALLY APPROVED | CMINI |
| Note: Inspection Resulted at 12/15/2009 3:06:05 PM PARTIALL FRAMING ON METAL STUD WALLS WHERE ELEC. AND PLUMBING APPROVED. | |||
| 2ND ROUGH ELECTRICAL | 12/14/2009 | PARTIALLY APPROVED | RMARVEL |
| Note: Inspection Resulted at 12/14/2009 2:33:33 PM HIGHLIGHTED ON PLANS. | |||
| SECOND ROUGH PLUMBING INSPECTION | 12/03/2009 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/20/2009 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 11/20/2009 3:04:08 PM GENERATOR PAD. | |||
| UNDERGROUND ELECTRICAL | 11/19/2009 | APPROVED | RMARVEL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 03/30/2010 | 03/30/2010 |
| Note: Released By: LHITES Revision Final revised panel schedule including heat strips. Pwer engineer, load calculations do not change | |||
| ELEC | COMPLETE | 03/25/2010 | 03/26/2010 |
| Note: Released By: SKNOPF panel schedule revisions per inspector's comments Approved for Release. Revision - adjusted panel schedules to reflect actual installation | |||
| ELEC | COMPLETE | 03/23/2010 | 03/23/2010 |
| Note: Released By: LHITES Revision electrical revision and final as-builts per inspectors comments | |||
| ELEC | COMPLETE | 03/16/2010 | 03/16/2010 |
| Note: Released By: LHITES REVISIONS PER PLAN REVIEW COMMENTS DATED 3/10/2010 | |||
| ELEC | HOLD | 03/10/2010 | 03/10/2010 |
| Note: Held By: SKNOPF Final design/as built CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2009100187 (ACI Palm Coast @ 145 City Place) 3/10/2010 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Please clarify circuit P3-5 which is shown for both EWH and AHU-8 on Sheet E1. 2. Clarify phase load totals for P2, P3, and P4, where it appears that the ACU is the larger of the non-coincidental loads. Please correct the loads in MDP accordingly. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 160 Cypress Point Pkwy Ste B106 Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| BLD | COMPLETE | 02/10/2010 | 02/10/2010 |
| Note: Released By: JMCGOWEN response to review comments dated 2/5/2010 | |||
| BLD | HOLD | 02/05/2010 | 02/05/2010 |
| Note: Held By: JMCGOWEN revision- structure revisions for equip. loading requirements provide detail 1/SK-3 as called for on pageSK-1 | |||
| ELEC | COMPLETE | 01/21/2010 | 01/21/2010 |
| Note: Released By: SKNOPF revision to comment responses date 1/11/10 Approved for Release. Revision: Added receptacles and lighting. Added 100A power bus. Added SRV1 panel and feeder. Revised circuits. Replaced EWH with Insta-hots throughout. Updated panel schedules, actual loads and Electrical Riser. | |||
| BLD | COMPLETE | 01/21/2010 | 01/21/2010 |
| Note: Released By: JMCGOWEN relocating door and wall layout | |||
| MECH | COMPLETE | 01/08/2010 | 01/08/2010 |
| Note: Released By: FREODICA Revision: HVAC revision reflecting as-built conditions - Rev.2 dated 12/30/2009. | |||
| ELEC | HOLD | 01/08/2010 | 01/11/2010 |
| Note: Held By: SKNOPF Misc electrical CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Permit #2009100187 (ACI Palm Coast @ 145 City Place) 1/11/2010 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Sheet E1: a. Revision replaced a 2P EWH with an Insta-Hot on the plan sheet for circuits P1-21 and P2-21, but the panel schedules have not been revised for circuit breaker sizes and loads. Submit plumbing revisions as needed for EWH changes to Insta-hots. b. Submit architectural wall and door changes for Office #2. c. Revision added a receptacle to P2-4, but panel loads still need to be updated. d. There are 4 receptacles in "A.D." room with no circuit identification. e. There is 1 receptacle in Lounge/Café with no circuit identification. f. Vending machines are still shown in same location in Lounge, but circuits and receptacles are no longer shown for this equipment. Please clarify. g. MDP-6 circuit is shown on the plans for both the inside unit and the rooftop unit. Please clarify. 2. Sheet E2: a. Multiple circuits have changed, but the panel load totals have not been updated. Please update the panel phase totals for the following panels: P3, P4, SRV, SRV1, and MDP. b. Coordinate loads for all circuit breakers in MDP and update MDP phase load calculations. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| ELEC | COMPLETE | 10/21/2009 | 10/21/2009 |
| Note: Released By: LHITES Load calculations & generator specs per permit review comments | |||
| MECH | COMPLETE | 10/19/2009 | 10/19/2009 |
| Note: Released By: FREODICA per plan review comment responses | |||
| ELEC | HOLD | 10/19/2009 | 10/19/2009 |
| Note: Held By: LHITES 1. Please provide manufacturer specification sheets for ATS switch and generator. 2. Please provide complete load calculations for service, panels and all circuits. | |||
| UD1 | COMPLETE | 10/14/2009 | 10/15/2009 |
| Note: Released By: CJOHNSON | |||
| FI1 | COMPLETE | 10/12/2009 | 10/14/2009 |
| Note: Released By: JMONTARULI | |||
| MECH | HOLD | 10/12/2009 | 10/12/2009 |
| Note: Held By: FREODICA 1. The city record shows there is an existing HVAC system layout (supplied by AHU-2) for the corridor and lobby under Permit No. 2007100054. The new proposed Mechanical Plan shows existing HVAC to remain on lobby only. Please clarify if the existing HVAC along the corridor would remain even if the corridor would be demolished. If not, provide HVAC demolition plan. 2. Provide the required outdoor ventilation air calculation per FMC 2007, Table 403.3. 3. Total supply air in CFM for Unit # 7 does not match with A/C Schedule. 4. Condesate drain layout for Units 5 thu 8 is missing. Provide type of material for condesate drain. Also, clarify Detail A/M1 for auxiliary drain pan which states "Cap for hose connection". 5. Bathroom #2 exhaust duct termination appears to be within 10 ft. from the existing AHU-2 outside air intake. Please clarify. | |||
| PLUM | COMPLETE | 10/12/2009 | 10/12/2009 |
| Note: Released By: FREODICA | |||
| ELEC | HOLD | 10/09/2009 | 10/12/2009 |
| Note: Held By: LHITES 1. Sheet E-1 panel P-2 shows circuits 8, 10 yet appears to be one circuit. 2. Sheet E-1 office #4 and motorized blinds has no circuit identification. 3. Sheet E-1 lounge outlets near data and on wall have no circuit identification 4. Sheet E-1 outlets near vending machines. Need panel identification. 5. Sheet E-1 ground conductor size on this sheet for ATS to generator shows 1/0. Sheet E-3 shows this conductor as 4/0 Please correct. 6. Sheet E-3. Panel P-4 does not have Acu-1 or 2, it has labeled acu 5 and 6 please correct. Please correct acu-7 circuit labeling. 13,17 on sheet E-3 but panel schedule has label of circuits 13,15 7. Provide complete load calculations for all panels and service | |||
| BLD | COMPLETE | 10/08/2009 | 10/09/2009 |
| Note: Released By: JJOSEPH | |||
| ZON | COMPLETE | 10/07/2009 | 10/08/2009 |
| Note: Released By: BBARTON |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 04/01/2010 |
| REINSPECTION FEE | ¤40.00 | 04/01/2010 |
| REINSPECTION FEE | ¤40.00 | 04/01/2010 |
| REINSPECTION FEE | ¤40.00 | 04/01/2010 |
| REINSPECTION FEE | ¤40.00 | 04/01/2010 |
| REVISION | ¤40.00 | 04/01/2010 |
| REVISION | ¤40.00 | 04/01/2010 |
| REVISION | ¤40.00 | 04/01/2010 |
| REVISION | ¤40.00 | 04/01/2010 |
| REVISION | ¤40.00 | 04/01/2010 |
| REVISION | ¤40.00 | 04/01/2010 |
| REVISION | ¤80.00 | 04/01/2010 |
| REVISION | ¤40.00 | 04/01/2010 |
| REVISION | ¤40.00 | 04/01/2010 |
| SITE PLAN 20 | ¤20.00 | 11/02/2009 |
| BUILDING DISCOUNT 100% | (¤622.80) | 11/02/2009 |
| ELECTRIC FEE | ¤84.00 | 11/02/2009 |
| FIRE PLANS REVIEW | ¤175.65 | 11/02/2009 |
| MECHANICAL FEE | ¤84.00 | 11/02/2009 |
| PERMIT FEE | ¤280.00 | 11/02/2009 |
| PLAN CHECK FEE | ¤100.00 | 11/02/2009 |
| PLUMBING FEE | ¤84.00 | 11/02/2009 |
| RADON FEE | ¤87.83 | 11/02/2009 |
| ADMIN COMMERCIAL | ¤60.00 | 11/02/2009 |
| BUILDING CODE ADMIN FUND | ¤87.83 | 11/02/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,040.51 |