I want to search for...
Permit #2009100698
Permit Details
Status: COED
| Parcel Id: 07-11-31-7001-00090-0150 |
| CONDITIONED SPACE: 1781 sqft |
| GARAGE: 403 sqft |
| OPENED PORCH (WITH ROOF) : 68 sqft |
| Total Square Footage: 2252 sqft |
| Block: 00090 |
| Subdivision: 2143 - SECTION 1-FLORIDA PARK |
| Job Phone: 386-246-6125 |
| Location Address: 12 FELTER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/05/2009 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: NICASTRO, KYLE N |
|
Address 35483 STATE RTE 37 THERESA, NY 13691 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤150,868.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES INC.
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CRC057202 (Exp: 08/31/2010) | 386-246-6125 | 386-246-6124 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL G MORELLO JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32137 |
CAC014293 (Exp: 08/31/2014) | (386)447-3950 | (386)446-4614 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 04/20/2010 | FINAL APPROVED | DROCKWELL |
| STORMWATER FINAL INSPECTION | 04/16/2010 | APPROVED | DRANDALL |
| Note: 11/4/09 new asphalt site ok//jc 11/20/09 Site check ok 4/16/10 passed as noted///clean out culvert ends///will recheck 4/19/10/DR 4/19/10 culverts cleaned///good job. thank you/DR | |||
| UTILITY COMPANY FINAL | 04/15/2010 | APPROVED - AS NOTED | MBACON |
| Note: PLEASE CUT 4" RISER TO GRADE | |||
| R.O.W. DAMAGE INSPECTION | 04/13/2010 | APPROVED - AS NOTED | JCOLASANTI |
| Note: please mark road for necessary repairs...(pre-inspect noted new road). 4/12/10 cars blocking view/reschedule 4/13/10 marked 21 sq ft of road for repair//jc | |||
| PRE DRIVEWAY | 04/05/2010 | APPROVED | JCOLASANTI |
| RESIDENTIAL EARLY POWER | 03/23/2010 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 3/23/2010 3:36:19 PM PALMETTO | |||
| LATH /BRICK FLASHING | 03/04/2010 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 3/4/2010 3:49:36 PM NEED TO HAVE STUCCO STOP AT FRAMED WALL REAR OF HOUSE WHER WOOD MEETS BLOCK,CHECK ON FINAL | |||
| INSULATION INSPECTION | 02/26/2010 | APPROVED | CMINI |
| ALL ROUGH | 01/20/2010 | APPROVED | DROCKWELL |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/19/2010 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION Inspection Resulted at 1/19/2010 3:24:37 PM TIGHTEN ANCHOR BOLT IN GARAGE | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/18/2009 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 12/18/2009 3:05:47 PM OVERNOTCHED STUD WHERE WATER HEATER PIPE CUT IN NEEDS REPAIR..6" WALL IN GARAGE NEEDS BEARING WHERE IT IS OVERHANGING...ANCHOR BOLT IN WALL IS LOOSE.PLAN CALLS FOR 2 HETAS WHERE THERE IS AN LGT IN ITS PLACE... | |||
| LINTEL | 12/02/2009 | APPROVED | DROCKWELL |
| FOUNDATION SURVEY APPROVED BY ZONING | 11/30/2009 | APPROVED | BBARTON |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 11/30/2009 | APPROVED | LAPTEKAR |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/23/2009 | APPROVED | CMINI |
| FIRST ROUGH PLUMBING INSPECTION | 11/19/2009 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 10/30/2009 | 10/30/2009 |
| MECH | COMPLETE | 10/30/2009 | 10/30/2009 |
| PLENV | COMPLETE | 10/30/2009 | 11/04/2009 |
| Note: Released By: DBEVAN tortoise nest found on property - Inspected the site on 11/4/09 and observed three burrows within the northern extent of the property. All appeared to be armadillo in nature. This site inspection should not be construed as a formal gopher tortoise survey and does not satisfy criteria set forward by Florida Fish and Wildlife Conservation Commission or other applicable agencies. | |||
| PLUM | COMPLETE | 10/28/2009 | 10/28/2009 |
| MECH | HOLD | 10/28/2009 | 10/28/2009 |
| Note: Provide return duct layout. | |||
| ZON | COMPLETE | 10/28/2009 | 10/28/2009 |
| BLD | COMPLETE | 10/28/2009 | 10/28/2009 |
| SW1 | COMPLETE | 11/02/2009 | |
| Note: Missing driveway detail plan for construction in the right of way. Driveway detail received |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 04/20/2010 |
| REINSPECTION FEE | ¤40.00 | 04/20/2010 |
| NEW RESIDENTIAL INSPECTIONS | ¤301.74 | 11/05/2009 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 11/05/2009 |
| SITE PLAN 20 | ¤20.00 | 11/05/2009 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/05/2009 |
| TRANS IMPACT FEE 7-RESIDENTIAL | ¤3,565.34 | 11/05/2009 |
| BUILDING CODE ADMIN FUND | ¤11.26 | 11/05/2009 |
| BUILDING DISCOUNT 100% | (¤750.29) | 11/05/2009 |
| ELECTRIC FEE | ¤150.52 | 11/05/2009 |
| FIRE COMM IMPACT FEE 4/1/09 | ¤190.48 | 11/05/2009 |
| MECHANICAL FEE | ¤150.52 | 11/05/2009 |
| PERMIT FEE | ¤20.00 | 11/05/2009 |
| PARKS IMPACT FEE 4/1/09 | ¤1,230.83 | 11/05/2009 |
| PLAN CHECK FEE | ¤60.35 | 11/05/2009 |
| PLUMBING FEE | ¤150.52 | 11/05/2009 |
| RADON FEE | ¤11.26 | 11/05/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤8,872.53 |