I want to search for...
Permit #2009110084
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7027-00RP0-00A2 |
| Block: 00RP0 |
| Subdivision: 0 - |
| Job Phone: (386) 437-5834 |
| Location Address: 94 WHITE VIEW PKWY |
| Type: EL - ELECTRICAL |
| Issue Date: 11/25/2009 |
| NOC: Unknown |
| Applicant name: COBEY SCOTT WETHERBY |
| Owner: PALM COAST BIBLE CHURCH OF THE CHRISTIAN& MISSIONA |
|
Address 94 WHITEVIEW PKWY PALM COAST, FL 32164 |
|
Address OF PALM COAST PALM COAST, FL 32164 |
| Lot: 00A2 |
| Contracted Stated Job Value: ¤1,000.00 |
| Job Description: FURNISH (2) 18 FT POWER POLES |
| Type: CN |
Contractor
SUNCOAST ELECTRICAL (ELECTRICAL CONTRACTOR)
| Status | Location Address | State License Number | Phone |
| INACTIVE |
POST OFFICE BOX 2521 BUNNELL, FL 32110 |
EC0002486 (Exp: 08/31/2026) | (386) 437-5834 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRICAL FINAL | 01/05/2010 | FINAL APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION Contractor came in to schedule this inspection | |||
| LANDSCAPE FINAL | 12/29/2009 | APPROVED | WBUTLER |
| ELECTRICAL FINAL | 12/29/2009 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: Inspection Resulted at 12/29/2009 1:46:14 PM NEED SCH 80 PVC WHERE SUBJECT TO PHYSICAL DAMAGE. USE APPROVED FASTENERS FOR STRAPS IN EXTERIOR LOCATION. USE APPROVED SCREWS THAT COME LISTED WITH PVC J-BOXES. DAMAGED BOX NEEDS TO BE REPLACED. GLUE PVC JOINTS TOGETHER. NEED PLANS AND PERMIT POSTED AT SITE. |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 12/21/2009 | 12/21/2009 |
| Note: Released By: JMCGOWEN | |||
| PLLA | CANCEL | 12/15/2009 | |
| ZON | HOLD | 12/15/2009 | 12/15/2009 |
| Note: Held By: ECOYNE additional 2 round poles revision submitted without site plan called left message 12/15/09 ecoyne | |||
| ELEC | HOLD | 12/15/2009 | 12/15/2009 |
| Note: Held By: JMCGOWEN Revision In addition to already permitted work, they are requesting 2 round poles with 2 additional 400 watt m/h hid fixtures in parking lot to the west of permitted poles. provide electric detail and load calculation for added lights | |||
| ZON | COMPLETE | 11/16/2009 | 11/16/2009 |
| Note: Released By: ECOYNE | |||
| BLD | COMPLETE | 11/16/2009 | 11/16/2009 |
| Note: Released By: LHITES | |||
| ZON | HOLD | 11/13/2009 | 11/13/2009 |
| Note: Held By: BBARTON Applicant just needs to put a note on the plans when he comes in that states, "Light pole fixtures must be adjusted in the 0 degree (horizontal) position to meet code requirement of full cut-off fixture." | |||
| PLLA | COMPLETE | 11/13/2009 | 11/13/2009 |
| Note: Released By: WBUTLER Applicant just needs to put a note on the plans when he comes in that states, "Light pole fixtures must be adjusted in the 0 degree (horizontal) position to meet code requirement of full cut-off fixture." | |||
| PLLA | HOLD | 11/05/2009 | 11/06/2009 |
| Note: Held By: WBUTLER 1) Site plan submitted is not at all accurate as to what was constructed. Impossible to tell exactly where the poles are proposed to be placed. Need updated site plan with pole locations on it or stake locations in the field for verification. 2) It appears that the proposed light fixtures are to match the light pole in the right rear area of the site on the pole. This is a non-conforming light fixture that will cast glare onto the right-of-way and adjacent properties if not positioned in the horizontal configuration. New code requires a full cut-off type fixture that will not cause glare. Add note to the plans that these fixtures are not to be angled and are to remain horizontal to reduce off-site glare. | |||
| ENGIN1 | COMPLETE | 11/05/2009 | 11/05/2009 |
| Note: Released By: AWEBB 11/05/09 Spoke to applicant and confirmed that 2nd. new pole is NOT to be located in retention basin. | |||
| ENGIN1 | COMPLETE | 12/21/2009 | |
| Note: Released By: AWEBB | |||
| ZON | CANCEL |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/04/2010 |
| BUILDING DISCOUNT 100% | (¤95.04) | 11/25/2009 |
| ELECTRIC FEE | ¤60.60 | 11/25/2009 |
| PERMIT FEE | ¤20.00 | 11/25/2009 |
| PLAN REVIEW 25 | ¤25.00 | 11/25/2009 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤50.56 |