I want to search for...

Permit #2009120072

Permit Details

Status: COED

Parcel Id: 09-12-31-0000-02030-0020
Total Square Footage: 1056 sqft
Block: 02030
Subdivision: -
Job Phone: 407-916-7235
Location Address: 60 MEMORIAL MEDICAL PKWY
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 01/07/2010
NOC: RECORDED
Applicant name: ROCKY MCMICHEN
Owner: MEMORIAL HOSPITAL-FLAGLER INC

Address

875 STERTHAUS AVENUE

ORMOND BEACH, FL 32174

Lot: 0020
Contracted Stated Job Value: ¤370,000.00
Job Description: CATH LAB I-- RENOVATION
Type: CN

Contractor

THE ROBINS & MORTON GROUP
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

1900 SUMMIT TOWER BLVD.

ORLANDO, FL 32810

SUITE 150

ORLANDO, FL 32810

CGC1506087 (Exp: 08/31/2012) 407-916-7235 407-916-7632

Sub Contractors

ANTHONY A TIDWELL
Status Location Address State License Number Phone Fax
INACTIVE

1300 FT. NEGLEY BLVD

NASHVILLE, TN 37203

EC0002156 (Exp: 08/31/2012) 615-350-7270 615-350-7242
TODD SHERWOOD MORGAN
Status Location Address State License Number Phone Fax
CANCEL

777 BENNETT DRIVE

LONGWOOD , FL 32750

CMC039581 (Exp: 08/31/2022) 407-682-1313 (407)682-5166
TODD SHERWOOD MORGAN
Status Location Address State License Number Phone Fax
CANCEL

777 BENNETT DRIVE

LONGWOOD, FL 32750

CFC043045 (Exp: 08/31/2022) (407)682-1313 (407)682-5166

Inspection History

Type Request Date Result Inspector
ELECTRICAL FINAL 04/16/2010 APPROVED RMARVEL
Note: THIS IS A REINSPECTION requested by contractor
COMMERCIAL BUILDING FINAL 04/16/2010 FINAL APPROVED RMARVEL
Note: THIS IS A REINSPECTION requested by cotractor
COMMERCIAL BUILDING FINAL 04/07/2010 Disapproved - NO FEE RMARVEL
Note: Inspection Resulted at 4/7/2010 2:15:01 PM NEED ELECTRICAL FINAL BEFORE BUILDING FINAL.
ELECTRICAL FINAL 04/07/2010 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 4/7/2010 2:15:02 PM NEED REVISIONS TO PLANS FOR PNEL SCHEDULES.
H.V.A.C. FINAL 04/07/2010 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
ENGINEERING FINAL 04/05/2010 APPROVED MCOBB
FIRE FINAL 04/05/2010 APPROVED - AS NOTED JPATTEE
Note: Need to label breakers in panel.
H.V.A.C. FINAL 03/31/2010 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 3/31/2010 2:44:39 PM NEED TEST AND BALANCE REPORT. THE FCU UNIT IS NOT THE UNIT SPECIFIED ON THE PLANS.
PLUMBING FINAL 03/31/2010 APPROVED JHINDMAN
UTILITY COMMERCIAL FINAL 03/30/2010 APPROVED DSPENCER
UTILITY COMPANY FINAL 03/30/2010 APPROVED DSPENCER
2ND ROUGH ELECTRICAL 03/30/2010 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
COMMERCIAL POWER INSPECTION 03/30/2010 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
COMMERCIAL POWER INSPECTION 03/15/2010 PARTIALLY APPROVED RMARVEL
Note: Inspection Resulted at 3/15/2010 3:10:32 PM TORQUE ON LOAD SIDE OF MAIN.
ABOVE CEILING 03/12/2010 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
ELECTRIC FEEDER 03/08/2010 APPROVED RMARVEL
Note: Inspection Resulted at 3/8/2010 1:43:22 PM LINE SIDE TO 250A MAIN IS OK. STILL NEED TO CHECK LOADS.
DEMOLITION INSPECTION 03/03/2010 APPROVED CMINI
FRAMING 03/03/2010 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/3/2010 3:12:46 PM UNISTRUL RACKS AT CEILING..
ABOVE CEILING 03/03/2010 APPROVED RMARVEL
Note: Inspection Resulted at 3/3/2010 10:41:08 AM ELECTRICAL ONLY.
ABOVE CEILING 03/03/2010 Disapproved -FEE REQUIRED JHINDMAN
Note: mechanical above ceiling is not ready.
SECOND ROUGH PLUMBING INSPECTION 02/25/2010 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
H.V.A.C. ROUGH 02/12/2010 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 2/12/2010 3:21:32 PM HARD COPPER LINES FOR AC UNITS
2ND ROUGH ELECTRICAL 02/10/2010 PARTIALLY APPROVED RMARVEL
Note: Inspection Resulted at 2/10/2010 1:50:21 PM WALLS ONLY
FRAMING 02/05/2010 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 2/5/2010 2:00:50 PM WALLS AND SOFFITS
SECOND ROUGH PLUMBING INSPECTION 02/05/2010 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 2/5/2010 2:00:51 PM MED GAS PIPING.
H.V.A.C. ROUGH 02/03/2010 PARTIALLY APPROVED LHITES
Note: THIS IS A REINSPECTION Inspection Resulted at 2/3/2010 12:20:50 PM INSULATION APPROVED CIRCLED ON PLANS
H.V.A.C. ROUGH 01/29/2010 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 1/29/2010 3:44:46 PM SUPPLY DUCT ROUGH IS OK.
H.V.A.C. ROUGH 01/28/2010 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 1/28/2010 3:13:19 PM PARTIAL SUPPLY DUCT INSPECTION.
FIRST ROUGH PLUMBING INSPECTION 01/27/2010 APPROVED JHINDMAN
H.V.A.C. ROUGH 01/27/2010 CANCELLED BY APPLICANT AIRS WEB

Review History

Department Status Date In Date Out
ELEC COMPLETE 04/15/2010 04/15/2010
Note: Released By: JMCGOWEN updated as-built electrical panel schedules per inspector's request
PLUM COMPLETE 04/05/2010 04/05/2010
Note: Released By: JMCGOWEN An alternate fan coil unit was provided from what is shown on drawings due to size contracts, an inspector asked for the approved submittal of the alrenate unit the submittal is attached
PLUM COMPLETE 03/03/2010 03/03/2010
Note: Released By: FREODICA Not Applicable. No changes on plumbing. Previous revision request dated 2/16/10 was a mistake.
MECH COMPLETE 03/03/2010 03/03/2010
Note: Released By: FREODICA correction to the revision- shows changes per CCD#1 per comments for CCD#1
BLD COMPLETE 02/25/2010 02/26/2010
Note: Released By: JJOSEPH revision - drawings requested by inspector
PLUM HOLD 02/16/2010 02/16/2010
Note: Held By: FREODICA 1. Plumbing revision was requested but no plans were submitted. Please clarify.
MECH HOLD 02/16/2010 02/16/2010
Note: Held By: FREODICA 1. Revisions for sheets M101 & M201 started with revision #2 but cover sheet shows revision #1. Please clarify.
ELEC COMPLETE 02/16/2010 02/16/2010
Note: Released By: SKNOPF Revision panel schedule comment from revision Approved for Release. Revision: Added 10" floor duct Revised ceiling duct Moved equipment panels Relocated receptacles Added code blue and phone outlets Revised load calculations
BLD HOLD 02/12/2010 02/16/2010
Note: Held By: JJOSEPH Please coordinate and indicate clearly the section of the building that will be revised on the plan. Some parts were clouded with revision number one and no reference was provided. ccd#1 electrical,mechanical, plumbing updates for flagler hospital cath lab renovation
ELEC HOLD 02/12/2010 02/12/2010
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Permit #2009120072 (Cath Lab Renovation @ 60 Memorial Medical Pkwy.) 2/12/2010 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Provide panel schedule and load changes for revision. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
ELEC COMPLETE 12/21/2009 12/21/2009
Note: Released By: SKNOPF Response to plan review comments Approved for Release.
FI1 COMPLETE 12/04/2009 12/04/2009
Note: Released By: JPATTEE
MECH COMPLETE 12/04/2009 12/04/2009
Note: Released By: FREODICA
PLUM COMPLETE 12/04/2009 12/04/2009
Note: Released By: FREODICA
UD1 COMPLETE 12/04/2009 12/07/2009
Note: Released By: CJOHNSON
ZON COMPLETE 12/03/2009 12/03/2009
Note: Released By: BBARTON
BLD COMPLETE 12/03/2009 12/04/2009
Note: Released By: JJOSEPH
ELEC HOLD 12/03/2009 12/03/2009
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application#2009120072 (Cath Lab Renovation @ 60 Memorial Medical Pkwy.) 12/3/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Electrical plans must be signed and sealed. 2. E004: Clarify scale of "Overall Electrical Plan" for determination of distance. 3. E211: Please update loads in panel schedule for circuits L1CF-32 & 66 per plans. 4. E502: Symbols "TR1", "IW", "CR2", and "MMV" are used in Artis Zee Ceiling drawing, but are not listed in any symbol legend on electrical drawings or Siemens "V" drawings. 5. E503: Provide panel schedule for new "CBP1" panel with all circuit breaker sizes, circuit loads, and panel load calculation. 6. E503: Please clarify load calculation for panel "L1CF". Neither phase load totals, nor summary load calculations match actual loads. Please review circuit breaker and feeder size for this panel. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 04/15/2010
REINSPECTION FEE ¤40.00 04/15/2010
REINSPECTION FEE ¤40.00 04/15/2010
REVISION ¤40.00 04/15/2010
REVISION ¤40.00 04/15/2010
REVISION ¤40.00 04/15/2010
REVISION ¤40.00 04/15/2010
REVISION ¤40.00 04/15/2010
REVISION ¤40.00 04/15/2010
SITE PLAN 20 ¤20.00 01/07/2010
ADMIN COMMERCIAL ¤60.00 01/07/2010
BUILDING CODE ADMIN FUND ¤5.28 01/07/2010
BUILDING DISCOUNT 100% (¤3,529.35) 01/07/2010
ELECTRIC FEE ¤282.00 01/07/2010
FIRE PLANS REVIEW ¤25.00 01/07/2010
MECHANICAL FEE ¤282.00 01/07/2010
PERMIT FEE ¤2,590.00 01/07/2010
PLAN CHECK FEE ¤425.50 01/07/2010
PLUMBING FEE ¤282.00 01/07/2010
RADON FEE ¤5.28 01/07/2010
Fees Total Due: ¤0.00 Total Paid: ¤807.71