I want to search for...

Permit #2009120105

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7032-00120-0110
SCREEN PORCH (SOLID ROOF) : 348 sqft
Total Square Footage: 719 sqft
Block: 00120
Subdivision: 2155 - SECTION 32-ROYAL PALMS
Job Phone: 407-871-2020
Location Address: 1 ROUND MILL LN
Type: PO - POOL
Issue Date: 12/16/2009
NOC: RECORDED
Applicant name: JOHN NICHOLAS WATTS
Owner: BELLANY, ARTHUR U & MARILYN P

Address

1 ROUND MILL LANE

PALM COAST, FL 32164

Lot: 0110
Contracted Stated Job Value: ¤25,200.00
Job Description: POOL W/SCREEN ENCLOSURE & DECK
Type: CN

Contractor

ALL SEASONS POOL SERVICE INC
Status Location Address State License Number Phone Fax
ACTIVE

185 E AIRPORT BLVD

GENEVA , FL 32732

CPC023576 (Exp: 08/31/2026) 407-871-2020 407-321-5404

Sub Contractors

BRIAN KEITH MILLER
Status Location Address State License Number Phone Fax
INACTIVE

685 S RONALD REAGAN BLVD

LONGWOOD, FL 32750

EC13001686 (Exp: 08/31/2026) (386)668-4222 (386)668-8222
JOHN NICHOLAS WATTS
Status Location Address State License Number Phone Fax
ACTIVE

185 E AIRPORT BLVD

GENEVA , FL 32732

CPC023576 (Exp: 08/31/2026) 407-871-2020 407-321-5404
WILLIAM WOODARD
Status Location Address State License Number Phone Fax
CANCEL

4268 SEABOARD RD

ORLANDO, FL 32808

CGC047465 (Exp: 08/31/2012) (407)298-0096 (407)295-0507

Inspection History

Type Request Date Result Inspector
POOL - FINAL 03/08/2010 FINAL APPROVED RMARVEL
Note: THIS IS A REINSPECTION
POOL - FINAL 03/03/2010 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 3/3/2010 1:45:20 PM NEED VACUUM GAUGE ON PUMP TO CHECK TDH.
STORMWATER FINAL INSPECTION 02/26/2010 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
UTILITY COMPANY FINAL 02/09/2010 APPROVED TSCHWEERS
STORMWATER FINAL INSPECTION 02/09/2010 Disapproved -FEE REQUIRED JCOLASANTI
Note: 1.sod must be placed in city swale and must be grade even with existing grade 2. complete sodding of property required
FOUNDATION SURVEY APPROVED BY ZONING 02/08/2010 APPROVED BBARTON
ELEC & ALARM 01/19/2010 APPROVED - AS NOTED RMARVEL
Note: Inspection Resulted at 1/19/2010 3:24:51 PM SCREEN ENCLOSURE NEEDS TO BE BONDED.
POOL DECK INSPECTION 12/30/2009 APPROVED JHINDMAN
STEEL & GROUND 12/21/2009 APPROVED JHINDMAN

Review History

Department Status Date In Date Out
SW1 COMPLETE 12/15/2009 12/15/2009
Note: Released By: LAPTEKAR Topo survey Lot grading plan w/proposed grade elev. 12/15/09 received topo survey with grade proposals/la
ZON COMPLETE 12/15/2009 12/15/2009
Note: Released By: BBARTON Door pads Equipment pad
BLD COMPLETE 12/14/2009 12/14/2009
Note: Released By: JJOSEPH Simplified TDH calc worksheet, showing selected pump clarified
BLD HOLD 12/04/2009 12/04/2009
Note: Held By: FREODICA 1. Simplified Total Dynamic Head Calculation Worksheet and All Season Pools & Service specs sheet show selected pump as 1 hp but the equipment selection on cut sheet shows 1-1/2 hp. Please clarify. 2. Height of screen enclosure on plan shows 8 ft but the All Seasons Pools Service Sheet shows 7 ft. Please clarify.
SW1 HOLD 12/04/2009 12/04/2009
Note: Held By: LAPTEKAR 1. Topographic survey referencing 1988 NAVD datum required.(See Stormwater requirements for new pool construction) 2. Lot grading plan required with proposed grade elevations. 12/4/09 emailed comments
ZON HOLD 12/04/2009 12/04/2009
Note: Held By: BBARTON 1. Show door pads on site plans 2. Show the equipment pad on the site plan, keep in mind the equipment pad can not encroach into the 5' utlity easement 3. Screen details are missing the done screen length, add to detail (appears there was a measurement there but it has been cut off) 4. Screen details are missing the dimensions for the flat roof, add to detail. faxed and emailed hold comments to contractor 12/04/09 @ 9:54 am
ZON HOLD 12/14/2009
Note: Held By: BBARTON Received screen detail by fax but length of screen is still cut off and the dimensions of the insulated roof is still missing. I still need the following: 1. Show door pads on site plans 2. Show the equipment pad on the site plan, keep in mind the equipment pad can not encroach into the 5' utility easement 3. Screen details are missing the done screen length, add to detail (appears there was a measurement there but it has been cut off) 4. Screen details are missing the dimensions for the flat roof, add to detail. faxed and emailed hold comments to contractor 12/14/09 @ 10:35 am

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 03/03/2010
STORMWATER REINSPECTION FEE ¤35.00 02/25/2010
SITE PLAN 20 ¤20.00 12/16/2009
STORM WATER PERMIT FEES ¤80.00 12/16/2009
BUILDING DISCOUNT 100% (¤198.00) 12/16/2009
PERMIT FEE ¤180.00 12/16/2009
PLAN CHECK FEE ¤40.00 12/16/2009
Fees Total Due: ¤0.00 Total Paid: ¤197.00