I want to search for...

Permit #2010020595

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00400-0280
CONDITIONED SPACE: 1958 sqft
GARAGE: 488 sqft
OPENED PORCH (WITH ROOF) : 300 sqft
OPENED PORCH (WITH ROOF) : 50 sqft
Total Square Footage: 2796 sqft
Block: 00400
Subdivision: 2191 - SECTION 23-WYNNFIELD
Job Phone: (386) 246-6125
Location Address: 112 WHITE HALL DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/05/2010
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: SEAGATE HOMES LLC

Address

STE 7

PALM COAST, FL 32164

Address

185 CYPRESS POINT PKWY

PALM COAST, FL 32164

Lot: 0280
Contracted Stated Job Value: ¤187,883.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC052446 (Exp: 08/31/2026) 386-445-5023 386-446-4614
DENNIS GENE GAINEY
Status Location Address State License Number Phone Fax
INACTIVE

P.O. BOX 1203

Bunnell, FL 32110

CFC046004 (Exp: 08/31/2026) (386) 437-5637 386-437-3012
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone Fax
CANCEL

531 CODISCO WAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2018) (407)333-2665 (407)585-1002

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 07/16/2010 FINAL APPROVED ACOOPER
Note: THIS IS A REINSPECTION
FINAL COMPLETE BUILDING INSPECTION 07/14/2010 Disapproved -FEE REQUIRED ACOOPER
Note: THIS IS A REINSPECTION Inspection Resulted at 7/14/2010 2:42:38 PM MOCP FOR AHU IS 50 AMP. (60 AMP. IN PANEL)
FINAL COMPLETE BUILDING INSPECTION 07/13/2010 CANCELLED BY APPLICANT RMARVEL
STORMWATER FINAL INSPECTION 07/08/2010 APPROVED DRANDALL
Note: THIS IS A REINSPECTION 7/19/10 road damage repaired//dr
STORMWATER FINAL INSPECTION 07/06/2010 CANCELLED BY APPLICANT DRANDALL
Note: 4/8/10 silt fence in place in swale downstream...site check ok/jc/la
UTILITY COMPANY FINAL 07/01/2010 APPROVED MBACON
R.O.W. DAMAGE INSPECTION 07/01/2010 APPROVED - AS NOTED DRANDALL
Note: Please mark road for necessary repairs...no pre-inspect completed. 7/1/10 marked 38 sq ft road damage///(check across street...dirt on vacant lot)//dr
RESIDENTIAL EARLY POWER 06/22/2010 APPROVED CMINI
Note: Inspection Resulted at 6/22/2010 3:12:45 PM CALLED SUSAN AT FPL AT 3:8 P.M.
PRE DRIVEWAY 06/21/2010 APPROVED DRANDALL
R.O.W. DAMAGE INSPECTION 05/24/2010 APPROVED - AS NOTED JCOLASANTI
Note: please check swale for obstructions///called contractor///there is temporary culvert installed 5/24/10 no visible swale blockage....at time of inspection ....no water in the swale and silt fence is in place and maintained.//jc
LATH /BRICK FLASHING 05/14/2010 APPROVED ACOOPER
INSULATION INSPECTION 05/13/2010 APPROVED ACOOPER
ALL ROUGH 05/11/2010 APPROVED - AS NOTED ACOOPER
Note: Inspection Resulted at 5/11/2010 1:59:18 PM LOWER DRYER VENT NAIL PLATE TO COVER THE VENT PIPE.
EXTERIOR WALL SHEATHING/SHEAR WALL 05/11/2010 APPROVED ACOOPER
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 05/03/2010 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 5/3/2010 3:09:15 PM CHECK TIE DOWN OF POCKET FOR SLIDER ON EXTERIOR WALL INSPECTION.
LINTEL 04/16/2010 APPROVED ACOOPER
FOUNDATION SURVEY APPROVED BY STORMWATER 04/15/2010 APPROVED LAPTEKAR
FOUNDATION SURVEY APPROVED BY ZONING 04/15/2010 APPROVED ECOYNE
MONOLITHIC SLAB INSPECTION/SLAB 04/12/2010 APPROVED ACOOPER
FIRST ROUGH PLUMBING INSPECTION 04/07/2010 APPROVED ACOOPER

Review History

Department Status Date In Date Out
BLD COMPLETE 05/12/2010 05/12/2010
Note: Released By: LHITES energy cal/product approval
ELEC COMPLETE 03/04/2010 03/04/2010
Note: Released By: SKNOPF correction- revised load calc, addwd micro, disposal,& pep tank Garden tub in master bath is not whirlpool
MECH COMPLETE 03/01/2010 03/01/2010
Note: Released By: FREODICA
ZON COMPLETE 02/25/2010 02/25/2010
Note: Released By: ECOYNE
ELEC HOLD 02/25/2010 02/25/2010
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application #2010020595 (Single Family Residence @ 112 Whitehall Dr.) 2/25/2010 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Revise square footage in demand load calculation. 2. Revise demand load calculation to include microwave, disposal, and pep tank. 3. Clarify if master garden tub includes jetted whirlpool per details on Sheet 4.2FF. Adjust demand load calculation as required. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
MECH HOLD 02/25/2010 02/25/2010
Note: Held By: FREODICA 1. Provide duct sizes of main supply and return.
PLUM COMPLETE 02/25/2010 02/25/2010
Note: Released By: FREODICA
SW1 COMPLETE 02/25/2010 02/25/2010
Note: Released By: LAPTEKAR
BLD COMPLETE 02/24/2010 02/25/2010
Note: Released By: JJOSEPH
ZON HOLD 02/23/2010 02/24/2010
Note: Held By: ECOYNE provide landscaping (3 gallon plants) around a/c pad e-mail 02/24/10 12:54pm

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EARLY POWER INSPECTION ¤40.00 07/16/2010
ADDITIONAL FEE ¤40.00 07/16/2010
REVISION ¤40.00 07/16/2010
REINSPECTION FEE ¤40.00 07/16/2010
NEW RESIDENTIAL INSPECTIONS ¤432.00 03/05/2010
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 03/05/2010
SITE PLAN 20 ¤20.00 03/05/2010
STORM WATER PERMIT FEES ¤80.00 03/05/2010
TRANS IMPACT FEE 7-RESIDENTIAL ¤3,565.34 03/05/2010
BUILDING CODE ADMIN FUND ¤13.98 03/05/2010
BUILDING DISCOUNT 100% (¤996.48) 03/05/2010
ELECTRIC FEE ¤189.60 03/05/2010
FIRE COMM IMPACT FEE 4/1/09 ¤190.48 03/05/2010
MECHANICAL FEE ¤189.60 03/05/2010
PERMIT FEE ¤20.00 03/05/2010
PARKS IMPACT FEE 4/1/09 ¤1,230.83 03/05/2010
PLAN CHECK FEE ¤86.40 03/05/2010
PLUMBING FEE ¤189.60 03/05/2010
RADON FEE ¤13.98 03/05/2010
Fees Total Due: ¤0.00 Total Paid: ¤8,985.33