I want to search for...
Permit #2010040679
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7011-00010-1280 |
| Block: 00010 |
| Subdivision: 2193 - SECTION 11-BELLE TERRE |
| Job Phone: 386-586-7093 |
| Location Address: 174 BELLEAIRE DR |
| Type: DK - DOCK |
| Issue Date: 05/07/2010 |
| NOC: Unknown |
| Applicant name: ERIC GLENN SAMUELSON |
| Owner: DIAMOND KENNETH J & NANCY H&W |
|
Address 174 BELLEAIRE DRIVE PALM COAST, FL 32137 |
| Lot: 1280 |
| Contracted Stated Job Value: ¤2,450.00 |
| Job Description: INSTALL 12' X 10' DOCK ON BACK PROPERTY INTO BELLAIRE WATERWAY |
| Type: CN |
Contractor
VIKING CONTRACTORS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
597 JOHN ANDERSON HIGHWAY PALM COAST, FL 32164 |
CBC1257381 (Exp: 08/31/2014) | 386-586-7093 | 386-586-6146 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL INSPECTION (MISC) | 05/18/2010 | FINAL APPROVED | DROCKWELL |
| STORMWATER FINAL INSPECTION | 05/14/2010 | APPROVED | DRANDALL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/06/2010 | 05/06/2010 |
| Note: Released By: JJOSEPH | |||
| ZON | COMPLETE | 05/06/2010 | 05/06/2010 |
| Note: Released By: BBARTON revised site plan & dock plan | |||
| SW1 | COMPLETE | 05/06/2010 | 05/06/2010 |
| Note: Released By: LAPTEKAR revised site plan & dock plan 5/6/10 plans have eliminated picket railing ...no walkway ramp noted/// | |||
| SW1 | HOLD | 04/28/2010 | 04/28/2010 |
| Note: Held By: LAPTEKAR amended site plan///however still need to correct plans for picket railing | |||
| SW1 | HOLD | 04/23/2010 | 04/26/2010 |
| Note: Held By: LAPTEKAR 1. site plan needs to show distance of rear property line to the water's edge and accurately depict the dock location...current site plan shows dock in side property line 2. site plan missing distance of dock from side property lines (minimum of 10 feet required from side property line) 3. picket rails are not allowed on freshwater docks//plans also show existing bulkhead? 4/26/10 emailed comments | |||
| ZON | COMPLETE | 04/23/2010 | 04/23/2010 |
| Note: Released By: ECOYNE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| BUILDING DISCOUNT 100% | (¤90.00) | 05/07/2010 |
| PERMIT FEE | ¤20.00 | 05/07/2010 |
| PLAN CHECK FEE | ¤40.00 | 05/07/2010 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 05/07/2010 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/07/2010 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤90.00 |