I want to search for...

Permit #2010050461

Permit Details

Status: COED

Parcel Id: 07-11-31-7031-00210-0010
CONDITIONED SPACE: 1514 sqft
CONDITIONED SPACE: 991 sqft
OPENED PORCH (WITH ROOF) : 252 sqft
GARAGE: 498 sqft
Total Square Footage: 3255 sqft
Block: 00210
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 386-672-6101
Location Address: 18 RIPTIDE PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/01/2010
NOC: RECORDED
Applicant name: JOHN DAVID MINABERRY
Owner: ALMEIDA MARLENE & JULIO VASQUEZ JTWROS

Address

5550 E MICHIGAN ST #3207

ORLANDO, FL 32822

Lot: 0010
Contracted Stated Job Value: ¤2,000,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

KEYSTONE HOMES
Status Location Address State License Number Phone Fax
ACTIVE

1339 W GRANADA BLVD

ORMOND, FL 32174

CRC1329222 (Exp: 08/31/2026) 386-672-6101 386-672-6102

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
PAUL S AIELLO
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 351926

PALM COAST, FL 32137

CAC1815808 (Exp: 08/31/2016) (386)239-0053 (386)323-1955
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 11/18/2010 FINAL APPROVED RMARVEL
STORMWATER FINAL INSPECTION 11/16/2010 APPROVED CMINI
Note: THIS IS A REINSPECTION
FINAL SURVEY 11/15/2010 APPROVED JJOSEPH
UTILITY COMPANY FINAL 11/15/2010 APPROVED TSCHWEERS
STORMWATER FINAL INSPECTION 11/15/2010 Disapproved -FEE REQUIRED CMINI
Note: 5/27/10 no existing swale or raod damage/gl/la 6/8/10 left message in job box, need to bury silt fence 4" to 6" into ground and back fill downward side of fence 6/18/10 everything ok//dr Inspection Resulted at 11/15/2010 3:32:07 PM NEED TO HAVE FINAL SURVEY ON SITE.
RESIDENTIAL EARLY POWER 10/21/2010 APPROVED RMARVEL
Note: requested by contractor Inspection Resulted at 10/21/2010 2:41:02 PM PALMETTO
RESIDENTIAL EARLY POWER 10/20/2010 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 10/20/2010 3:29:47 PM THE CONDUIT AT THE ELECTRICAL SERVICE PANEL HAS BEEN PULLED OFF THE WALL. 2ND TRIP
RESIDENTIAL EARLY POWER 10/19/2010 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 10/19/2010 11:06:41 AM THE CONDUIT AT THE ELECTRICAL SERVICE PANEL HAS BEEN PULLED OFF THE WALL.
PRE DRIVEWAY 09/28/2010 APPROVED BCHAMBERLAIN
INSULATION INSPECTION 08/31/2010 APPROVED CMINI
Note: THIS IS A REINSPECTION
INSULATION INSPECTION 08/30/2010 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 8/30/2010 12:30:25 PM NEED TO FIRECAULK OR FIREFOAM ALL ANNULAR AND OPENINGS...NEED APPROVED NAIL PLATE AT DRYER VENT.
ALL ROUGH 08/24/2010 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 8/24/2010 12:45:06 PM APPROVED NAIL PLATE AT DRYER DUCT/STRAP DRYER DUCT MID-POINT SAME ROOM/NAIL PLATE AT LOW-VOLT WIRING-CHECK AT NEXT INSPECTION
ALL ROUGH 08/19/2010 Disapproved -FEE REQUIRED JHINDMAN
Note: Inspection Resulted at 8/19/2010 2:46:19 PM HVAC DUCT PLAN IS MISSING. THE EXPOSED WIRES ABOVE THE ELECTRIC PANEL NEED TO BE PROTECTED. THE KITCHEN AND BONUS ROOM LIGHTING IS NOT PER PLAN. THE PLUMBING DRAIN,WASTE AND VENT SYSTEM NEEDS TO HAVE TEST PRESSURE ON IT.
LATH /BRICK FLASHING 08/09/2010 APPROVED CMINI
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 07/29/2010 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 07/27/2010 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 7/27/2010 2:56:20 PM TIGHTEN ALLTHREAD. ALLTHREAD MISSING IN LOCATIONS. RECHECK PER PLANS. MISSING ENGINEERING ON TRUSS 18. MULTIPLE SHINERS. SHOW PAPER WORK FOR ZIP BOARD THAT ALLOWS NO CLIPS BETWEEN TRUSSES.
LINTEL 06/28/2010 APPROVED JHINDMAN
FOUNDATION SURVEY APPROVED BY STORMWATER 06/24/2010 APPROVED LAPTEKAR
FOUNDATION SURVEY APPROVED BY ZONING 06/24/2010 APPROVED BBARTON
MONOLITHIC SLAB INSPECTION/SLAB 06/21/2010 APPROVED JHINDMAN
FIRST ROUGH PLUMBING INSPECTION 06/17/2010 APPROVED JHINDMAN
Note: per request from robby
TEMPORARY POLE 06/17/2010 APPROVED JHINDMAN
Note: per request from Robby Inspection Resulted at 6/17/2010 2:44:19 PM CALLED FPL ON 6-17-10 AT 3:45 P.M.
STORMWATER EROSION CONTROL 06/11/2010 APPROVED DRANDALL
Note: THIS IS A REINSPECTION
STEM WALL FOUNDATION 06/11/2010 APPROVED JHINDMAN
MONOLITHIC SLAB INSPECTION/SLAB 06/09/2010 APPROVED JHINDMAN
Note: Robbie called to schedule this inspection Inspection Resulted at 6/9/2010 3:09:28 PM THE STEMWALL FOOTING IS OK.
STORMWATER EROSION CONTROL 06/08/2010 Disapproved - NO FEE DRANDALL
Note: left notice....need to bury silt fence 4" to 6" into ground and back fill back side of fence

Review History

Department Status Date In Date Out
ZON HOLD 11/15/2010 11/15/2010
Note: Held By: JJOSEPH Revise the final survey to match it to the original site plan submitted. FINAL SURVEY
SW1 COMPLETE 11/10/2010 11/15/2010
Note: Released By: JJOSEPH FINAL SURVEY
BLD COMPLETE 08/23/2010 08/23/2010
Note: Released By: LHITES REVISION- light fixture changes called contractor 3:32 pm
BLD COMPLETE 07/29/2010 07/29/2010
Note: Released By: LHITES roof & wall sheating materials changed
BLD COMPLETE 07/23/2010 07/23/2010
Note: Released By: JMCGOWEN correction to the revision - truss corrections
BLD HOLD 07/21/2010 07/21/2010
Note: Held By: JMCGOWEN New truss layout truss modifications and repairs will need to be designed by the truss manufactures engineer. provide proper signed and sealed drawings
MECH COMPLETE 05/28/2010 05/28/2010
Note: Released By: JMCGOWEN revision- duct layout & duct size
BLD COMPLETE 05/28/2010 05/28/2010
Note: Released By: JMCGOWEN
BLD HOLD 05/26/2010 05/26/2010
Note: Held By: JMCGOWEN provide a florida registered engineer to seal structural pages of plan
MECH HOLD 05/26/2010 05/26/2010
Note: Held By: JMCGOWEN duct layout provide duct sizes
ELEC COMPLETE 05/26/2010 05/26/2010
Note: Released By: JMCGOWEN electrical load calcs & pep tank outlet
BLD HOLD 05/24/2010 05/24/2010
Note: Held By: JMCGOWEN provide an other truss package, two complete
ELEC HOLD 05/24/2010 05/24/2010
Note: Held By: JMCGOWEN provide pep tank j-box location. provide a revised load calculation to include 20 amp pep tank circuit.
MECH HOLD 05/24/2010 05/24/2010
Note: Held By: JMCGOWEN provide duct layout {supply, return, and transfer grills, size and location}
PLUM COMPLETE 05/24/2010 05/24/2010
Note: Released By: JMCGOWEN
ZON COMPLETE 05/21/2010 05/21/2010
Note: Released By: BBARTON
SW1 COMPLETE 05/19/2010 05/19/2010
Note: Released By: LAPTEKAR Received upgraded survey and grading plan///erosion control measures will be required//la
SW1 HOLD 05/14/2010 05/14/2010
Note: Held By: LAPTEKAR 1. topographic survey missing the road centerline elevation. 2. Grading plan missing grade elevation proposals of property line, rear yard and side yard between property line and structure. Majority of drainage should be directed to the front swale as possible...with as little drainage directed to the adjacent ditch. 5/14/10 emailed comments
ZON HOLD 05/14/2010 05/17/2010
Note: Held By: BBARTON 1. Show the AC pad on site plans, submit new site plans showing AC pad. 2. Site plans need to indicate if there are or are not any index trees on the lot, submit a new site plan indicating index trees. 3. The submitted landscape plan is incomplete. Submit new landscaping plans showing the following: (a) Indicate the tree types, caliper (measured above grade) and height. (b) There are bare spots in the front of the residence where landscaping is required. Show the required landscaping along the left side of the driveway parallel to the walkway and wrapping the right corner of the house. (c) Front landscaping needs to have a variety of shrubbery with varying heights. Provide a new landscape plan that indicates more that one shrub being used for the required front landscaping. (d) Show the AC pad with the required landscaping (min of 24"-30" in height). 4. Site plans are missing the walkway and driveway width. Submit new site plans indicating widths. 5. The submitted site plans and the site plan in the construction drawings do not match. The porch sizes are different, indicate the correct porch size and revise plans an/or site plans to match. 6. The wooden deck indicated on the construction plans are not shown of the site plans, show deck on site plans with dimensions and setbacks. faxed and emailed hold comments to contractor 05/17/10 @ 10:54 am
ZON COMPLETE 11/15/2010
Note: Released By: JJOSEPH

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EARLY POWER INSPECTION ¤40.00 11/19/2010
REINSPECTION FEE ¤40.00 11/19/2010
REINSPECTION FEE ¤40.00 11/19/2010
REINSPECTION FEE ¤40.00 11/19/2010
REINSPECTION FEE ¤40.00 11/19/2010
REINSPECTION FEE ¤40.00 11/19/2010
REVISION ¤40.00 11/19/2010
REVISION ¤40.00 07/29/2010
REINSPECTION FEE ¤40.00 07/29/2010
REVISION ¤40.00 07/26/2010
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 06/01/2010
SITE PLAN 20 ¤20.00 06/01/2010
STORM WATER PERMIT FEES ¤80.00 06/01/2010
TRANS IMPACT FEE 7-RESIDENTIAL ¤3,565.34 06/01/2010
NEW RESIDENTIAL INSPECTIONS ¤548.00 06/01/2010
BUILDING CODE ADMIN FUND ¤16.28 06/01/2010
BUILDING DISCOUNT 100% (¤1,215.72) 06/01/2010
ELECTRIC FEE ¤224.40 06/01/2010
FIRE IMPACT FEE RES 4/1/10 ¤195.62 06/01/2010
MECHANICAL FEE ¤224.40 06/01/2010
PERMIT FEE ¤20.00 06/01/2010
PARKS IMPACT FEE 4/01/10 ¤1,264.06 06/01/2010
PLAN CHECK FEE ¤109.60 06/01/2010
PLUMBING FEE ¤224.40 06/01/2010
RADON FEE ¤16.28 06/01/2010
Fees Total Due: ¤0.00 Total Paid: ¤9,292.66