I want to search for...
Permit #2010050791
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00120-0010 |
| CONDITIONED SPACE: 1512 sqft |
| GARAGE: 496 sqft |
| OPENED PORCH (WITH ROOF) : 56 sqft |
| Total Square Footage: 2064 sqft |
| Block: 00120 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 386-672-6101 |
| Location Address: 1 BALLARD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/11/2010 |
| NOC: RECORDED |
| Applicant name: JOHN DAVID MINABERRY |
| Owner: ASCIONE, RALPH & THERESA |
|
Address 300 SEA ISLAND RD JESSUP, GA 31545 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤130,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
KEYSTONE HOMES
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1339 W GRANADA BLVD ORMOND, FL 32174 |
CRC1329222 (Exp: 08/31/2026) | 386-672-6101 | 386-672-6102 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
PAUL S AIELLO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 351926 PALM COAST, FL 32137 |
CAC1815808 (Exp: 08/31/2016) | (386)239-0053 | (386)323-1955 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 10/27/2010 | FINAL APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION 10/27/10 (JB) APPROVED LANDSCAPING. | |||
| FINAL COMPLETE BUILDING INSPECTION | 10/26/2010 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 10/26/2010 3:10:31 PM INSULATION CERT/WATER HAMMER AT DISHWASHER | |||
| UTILITY COMPANY FINAL | 10/25/2010 | APPROVED | MBACON |
| Note: THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 10/22/2010 | APPROVED - AS NOTED | BCHAMBERLAIN |
| Note: 6/14/10 no swale or road damage/DR/ REQUESTED BY CONTRACTOR 10/22/10 Stmwtr fnl approved as noted: clean out culvert ends, remove silt fence and portable toilet. | |||
| FINAL SURVEY | 10/22/2010 | APPROVED | JJOSEPH |
| UTILITY COMPANY FINAL | 10/22/2010 | Disapproved - NO FEE | TSCHWEERS |
| Note: can't locate sewer cleanout near right of way. needs to be uncovered so it can inspected. | |||
| RESIDENTIAL EARLY POWER | 10/14/2010 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 10/14/2010 1:25:00 PM PALMETTO | |||
| PRE DRIVEWAY | 09/16/2010 | APPROVED | BCHAMBERLAIN |
| Note: THIS IS A REINSPECTION requested by contractor | |||
| PRE DRIVEWAY | 09/15/2010 | CANCELLED BY APPLICANT | BCHAMBERLAIN |
| INSULATION INSPECTION | 08/06/2010 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION per request from Trishia | |||
| INSULATION INSPECTION | 08/05/2010 | Disapproved -FEE REQUIRED | CMINI |
| Note: Trisha from Keystone Homes called to schedule this inspection Inspection Resulted at 8/5/2010 3:10:25 PM NEED TO PROVIDE ENERGY CALCULATGIONS FOR INSPECTION. | |||
| ALL ROUGH | 07/30/2010 | APPROVED - AS NOTED | DROCKWELL |
| Note: Inspection Resulted at 7/30/2010 12:51:32 PM FRAME AT ELECTRIC PANEL/16 GUAGE STRAPPING AT ALL OVER-NOTCHED TOP PLATES | |||
| LATH /BRICK FLASHING | 07/29/2010 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| TEMPORARY POLE | 07/26/2010 | APPROVED | CMINI |
| Note: Inspection Resulted at 7/26/2010 12:55:34 PM CALLED DAWN FROM FPL AT 10:46 AM....PALMETTO ELECTRIC | |||
| LATH /BRICK FLASHING | 07/23/2010 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 7/23/2010 1:14:17 PM LATH TO BE FASTENED TO FRAMING MEMBERS ONLY(TOP CORD,BOTTOM CORD AND UPRIGHTS) A MINIMUM OF 7IN ON CENTER.NAILS MUST PENETRATE FRAMING MEMBERS 3/4 IN MINIMUM/NO NAILS IN THE FIELD AT ALL. BACK OUT NAILS IN FIELD.SEE SHEET I LEFT FOR FUTURE REFERENCE.BEEN IN FORCE FOR OVER A YEAR. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 07/22/2010 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 07/19/2010 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 7/19/2010 3:11:03 PM NEED TO HAVE X-BRACING FOR GABLE END.....NEED TO BLOCK JOINTS FOR OSB LAID HORIZONTALY PER MANUFACTURES SPECS...NEED TO SHIM AND OR GROUT UNDER TRUSSES THAT ARE NOT SITTING FULL BEARING ON BLOCK MOSTLY AT FRONT AND LEFT OF HOUSE...LOOSE SHEETS AT FRONT ENTRANCE... | |||
| LINTEL | 07/02/2010 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| LINTEL | 07/01/2010 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection added by LW per phone call from contractor.Vent not properly attached in masonary wall | |||
| FOUNDATION SURVEY APPROVED BY STORMWATER | 07/01/2010 | APPROVED | LAPTEKAR |
| FOUNDATION SURVEY APPROVED BY ZONING | 07/01/2010 | APPROVED | BBARTON |
| MONOLITHIC SLAB INSPECTION/SLAB | 06/25/2010 | APPROVED | CMINI |
| FIRST ROUGH PLUMBING INSPECTION | 06/23/2010 | APPROVED | RMARVEL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 10/22/2010 | 10/22/2010 |
| Note: Released By: JJOSEPH Revised final survey | |||
| SW1 | HOLD | 10/21/2010 | 10/21/2010 |
| Note: Held By: JJOSEPH Need to show Elevations on all adjacent identified (e.g vacant and improved lots) properties l at a minimum of 20 foot interval ,on a 10 foot offset outside the properties line. Faxed and emailed on 10/21/10 at 2:44PM | |||
| ZON | COMPLETE | 06/10/2010 | 06/10/2010 |
| Note: Released By: ECOYNE CORRECTION BONDING PLANTINGS TREE SIZE | |||
| BLD | COMPLETE | 06/10/2010 | 06/10/2010 |
| Note: Released By: JMCGOWEN LOAD CALC CONDUCTOR SIZES SERVICE ENTERANCE GROUNDING SMOKE DETECTORS CARBON MONOXIDE VENT FOR BATH TUB & SHOWER ENGINEER SEAL DOOR & WINDOW ENGINEERING HANGAR STRAP SCHEDULE | |||
| PLUM | COMPLETE | 06/10/2010 | 06/10/2010 |
| Note: Released By: JMCGOWEN | |||
| ELEC | COMPLETE | 06/10/2010 | 06/10/2010 |
| Note: Released By: JMCGOWEN | |||
| SW1 | COMPLETE | 06/01/2010 | 06/02/2010 |
| Note: Released By: LAPTEKAR received grading plan//checked with MB | |||
| SW1 | HOLD | 05/27/2010 | 05/27/2010 |
| Note: Held By: JMCGOWEN provide an florida registered engineer to sign and seal structural pages of plans, provide florida produce approvals for all windows and doors,provide site specific hanger and strap schedule, | |||
| ELEC | HOLD | 05/27/2010 | 05/27/2010 |
| Note: Held By: JMCGOWEN provide load calculation, provide conductor sizes [service entrance, grounding], provide panel location, provide smoke detecter and carbon monoxide detecter locations | |||
| MECH | COMPLETE | 05/27/2010 | 05/27/2010 |
| Note: Released By: JMCGOWEN | |||
| PLUM | HOLD | 05/27/2010 | 05/27/2010 |
| Note: Held By: JMCGOWEN provide vent for bath tub and vent for shower | |||
| SW1 | HOLD | 05/26/2010 | 05/26/2010 |
| Note: Held By: LAPTEKAR 1.Grading plan has flow arrows only...need grading plan to show proposed grade elevations next to existing elevations of and swale and culvert elevation proposals.. 5/26/10 emailed comments | |||
| ZON | HOLD | 05/26/2010 | 05/26/2010 |
| Note: Held By: ECOYNE provide height of trees (new and to remain on lot) provide banding around windows/doors on home facing Barrington Drive 3 gallon plantings required on left elevation facing Barrington Drive (wrap around rear left elevation) faxed 05/26/10 3:55pm |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 10/28/2010 |
| REINSPECTION FEE | ¤40.00 | 10/28/2010 |
| REINSPECTION FEE | ¤40.00 | 10/28/2010 |
| REINSPECTION FEE | ¤40.00 | 10/28/2010 |
| REINSPECTION FEE | ¤40.00 | 10/28/2010 |
| REINSPECTION FEE | ¤40.00 | 10/28/2010 |
| NEW RESIDENTIAL INSPECTIONS | ¤338.00 | 06/11/2010 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 06/11/2010 |
| SITE PLAN 20 | ¤20.00 | 06/11/2010 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/11/2010 |
| TRANS IMPACT FEE 7-RESIDENTIAL | ¤3,565.34 | 06/11/2010 |
| FIRE IMPACT FEE RES 4/1/10 | ¤195.62 | 06/11/2010 |
| MECHANICAL FEE | ¤161.40 | 06/11/2010 |
| PERMIT FEE | ¤20.00 | 06/11/2010 |
| PARKS IMPACT FEE 4/01/10 | ¤1,264.06 | 06/11/2010 |
| PLAN CHECK FEE | ¤67.60 | 06/11/2010 |
| PLUMBING FEE | ¤161.40 | 06/11/2010 |
| RADON FEE | ¤10.32 | 06/11/2010 |
| BUILDING CODE ADMIN FUND | ¤10.32 | 06/11/2010 |
| BUILDING DISCOUNT 100% | (¤818.82) | 06/11/2010 |
| ELECTRIC FEE | ¤161.40 | 06/11/2010 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,076.64 |