I want to search for...
Permit #2010050825
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7004-00140-0080 |
| Block: 00140 |
| Subdivision: 2203 - SECTION 4-COUNTRY CLUB COVE |
| Job Phone: 386-931-7536 |
| Location Address: 33 CRYSTAL BAY CT |
| Type: DK - DOCK |
| Issue Date: 06/08/2010 |
| NOC: RECORDED |
| Applicant name: STACY A ZWENGER |
| Owner: SUSSMAN, HARVEY J & KATHRYN |
|
Address LIFE ESTATE PALM COAST, FL 32137 |
|
Address 33 CRYSTAL BAY CT PALM COAST, FL 32137 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤5,500.00 |
| Job Description: REMOVE OLD & REPLACE WITH NEW DOCK |
| Type: CN |
Contractor
NAUTILUS MARINE CONSTRUCTION, LLC
| Status | Location Address | Phone | Fax |
| REVOKE |
644 RIVERVIEW ROAD FLAGLER BEACH, FL 32136 |
386-931-7536 | 386-439-4252 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL INSPECTION (MISC) | 08/13/2010 | FINAL APPROVED | CMINI |
| STORMWATER FINAL INSPECTION | 08/12/2010 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/08/2010 | 06/08/2010 |
| Note: Released By: JMCGOWEN | |||
| SW1 | COMPLETE | 06/08/2010 | 06/08/2010 |
| Note: Released By: WKINELL changed size of dock to accomodate lift, at end new engineered drawings | |||
| ZON | COMPLETE | 06/08/2010 | 06/08/2010 |
| Note: Released By: ECOYNE | |||
| ZON | HOLD | 06/07/2010 | 06/07/2010 |
| Note: Held By: ECOYNE changed size of dock to accomodate lift at end new engineered drawings provide length of dock at widest point provide lot length. dock cannot be longer than 65% of the lot line. | |||
| SW1 | HOLD | 05/27/2010 | 05/27/2010 |
| Note: Held By: WKINELL Meet with contractor regarding dock size and boat placement.\\wk | |||
| ZON | HOLD | 05/27/2010 | 05/27/2010 |
| Note: Held By: ECOYNE provide width of lot (dock cannot be more than 65% of lot frontage) boat in addition to dock length will be too far out in the water. 16' maximum including boat is allowed. spoke with contractor 05/27/10 3:30pm |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| BUILDING DISCOUNT 100% | (¤90.00) | 06/08/2010 |
| PERMIT FEE | ¤20.00 | 06/08/2010 |
| PLAN CHECK FEE | ¤40.00 | 06/08/2010 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 06/08/2010 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/08/2010 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤90.00 |