I want to search for...
Permit #2010080414
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7027-00090-0070 |
| CONDITIONED SPACE: 120 sqft |
| Total Square Footage: 120 sqft |
| Block: 00090 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: (386)986-2224 |
| Location Address: 32 WOODSIDE DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 08/18/2010 |
| NOC: RECORDED |
| Applicant name: WILLIAM P WHITLEY III |
| Owner: FORSTER PAUL A SR |
|
Address 32 WOODSIDE DR PALM COAST, FL 32164 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤13,765.00 |
| Job Description: 12X10 ADDITION ON EXISTING CONCRETE SLAB |
| Type: CN |
Contractor
WHITLEY BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
6 BUTTONWELL LANE PALM COAST, FL 32137 |
CBC1255213 (Exp: 08/31/2018) | (386)986-2224 |
Sub Contractors
RICHARD R EDWARDS
| Status | Location Address | State License Number | Phone |
| CANCEL |
P. O. Box 1637 Bunnell, FL 32110 |
ER0011603 (Exp: 08/31/2022) | (386) 437-1537 |
JOHN GODFREY EIDMAN, II
| Status | Location Address | State License Number | Phone |
| CANCEL |
15 HARGROVE LANE UNIT 2L PALM COAST, FL 32137 |
CAC1813376 (Exp: 08/31/2014) | (386)446-8894 |
CHARLES RICHARD NAVAS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 353645 PALM COAST, FL 32164 |
CFC1427794 (Exp: 08/31/2026) | 386-447-9521 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL INSPECTION (MISC) | 10/22/2010 | FINAL APPROVED | RMARVEL |
| STORMWATER FINAL INSPECTION | 10/21/2010 | APPROVED | RMARVEL |
| ALL ROUGH | 10/20/2010 | APPROVED | RMARVEL |
| Note: requested by contractor | |||
| FOUNDATION SURVEY APPROVED BY ZONING | 10/19/2010 | APPROVED | JJOSEPH |
| UTILITY COMPANY FINAL | 10/13/2010 | APPROVED | TSCHWEERS |
| UTILITY COMPANY FINAL | 10/12/2010 | CANCELLED BY INSPECTOR | RMARVEL |
| Note: Inspection Resulted at 10/12/2010 1:43:11 PM I DO NOT DO THIS TYPE OF INSPECTION. MISASSIGNED. | |||
| LATH /BRICK FLASHING | 09/23/2010 | APPROVED | RMARVEL |
| INSULATION INSPECTION | 09/17/2010 | APPROVED | CMINI |
| BLDG OTHER | 09/16/2010 | APPROVED | RMARVEL |
| Note: Inspection Requested at 9/15/2010 8:43:15 PM FRAMING | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 09/16/2010 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/16/2010 | APPROVED - AS NOTED | RMARVEL |
| Note: Inspection Resulted at 9/16/2010 11:40:18 AM CHECK FOR FIRE BLOCKING ON INTERIOR FURRED WALL. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 09/08/2010 | Disapproved -FEE REQUIRED | CMINI |
| Note: Inspection Resulted at 9/8/2010 3:17:49 PM NAILS DRIVEN TO FAR IN..NAILS NOT 6"0.C. CHECK SPACING...NEED REVISION FOR CHANGE OF HIP RAFTER FROM 8" TO 6"..BUMPED ROOF TO LOOSE AREAS...NEED TO DRY IN ROOF..TIE DOWNS OK. | |||
| BLDG OTHER | 09/08/2010 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Requested at 9/7/2010 7:08:17 PM PARTIAL FRAMING Inspection Resulted at 9/8/2010 3:17:49 PM STUD AND TRUSS TIE DOWN PER PLAN..CHECK FRAMING AND OTHER ON ALL ROUGH. | |||
| FIRST ROUGH PLUMBING INSPECTION | 08/24/2010 | APPROVED | DROCKWELL |
| Note: contractor called to schedule | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 08/20/2010 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 10/19/2010 | 10/19/2010 |
| Note: Released By: JJOSEPH foundation survey | |||
| ELEC | COMPLETE | 10/08/2010 | 10/08/2010 |
| Note: Released By: JJOSEPH revision- relocation of porch light | |||
| BLD | COMPLETE | 09/14/2010 | 09/14/2010 |
| Note: Released By: JMCGOWEN revision - air return and supply duct changes, hip rafter changes | |||
| MECH | COMPLETE | 09/14/2010 | 09/14/2010 |
| Note: Released By: JMCGOWEN revision - air return and supply duct changes, hip rafter changes | |||
| BLD | COMPLETE | 08/17/2010 | 08/18/2010 |
| Note: Released By: FREODICA REVISED DRAWING SHOWING SUFFICIENCY OF SLAB & SPOT FOOTING TO PROVIDE STRUCTURAL SUPPORT | |||
| ZON | COMPLETE | 08/13/2010 | 08/13/2010 |
| Note: Released By: CBENTLEY | |||
| BLD | HOLD | 08/13/2010 | 08/13/2010 |
| Note: Held By: FREODICA 1. The plan detail 1/F shows existing porch concrete footing for the proposed new extension room does not match with the City's record. Provide signed & sealed letter from the design engineer that the existing slab can adequately support the proposed room extension. Faxed & emailed comment @3:57, 813-10 | |||
| SW1 | COMPLETE | 08/12/2010 | 08/16/2010 |
| Note: Released By: JJOSEPH | |||
| ZON | HOLD | 08/11/2010 | 08/13/2010 |
| Note: Held By: CBENTLEY 1. Hatch/Label area of addition on site plan. 2. Provide use of addition. 3. Label dimensions on site plan. 4. Provide setbacks on site plan. 5. Provide on site plan that roof, exterior walls, and exterior colors are the same as the existing dwelling. 6. Suggest meeting with Zoning to assist with getting a site plan that is more clear. faxed comments Constance |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 10/20/2010 |
| REVISION | ¤40.00 | 10/20/2010 |
| REVISION | ¤40.00 | 10/20/2010 |
| REINSPECTION FEE | ¤40.00 | 10/20/2010 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 08/18/2010 |
| BUILDING CODE ADMIN FUND | ¤0.60 | 08/18/2010 |
| SITE PLAN 20 | ¤20.00 | 08/18/2010 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/18/2010 |
| BUILDING DISCOUNT 100% | (¤213.12) | 08/18/2010 |
| ELECTRIC FEE | ¤68.40 | 08/18/2010 |
| MECHANICAL FEE | ¤68.40 | 08/18/2010 |
| PERMIT FEE | ¤20.00 | 08/18/2010 |
| PLAN CHECK FEE | ¤40.00 | 08/18/2010 |
| RADON FEE | ¤0.60 | 08/18/2010 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤284.88 |