Permit #2010090838

Permit Details

Status: COED

Parcel Id: 07-11-31-7025-000G0-0210
COMMERCIAL SQUARE FOOTAGE: 11831 sqft
Total Square Footage: 11831 sqft
Block: 000G0
Subdivision: -
Job Phone: 386-338-7785
Location Address: 85 CYPRESS POINT PKWY
Type: BC - BUILDING COMMERCIAL
Issue Date: 12/17/2010
NOC: RECORDED
Applicant name: THOMAS M SCAGLIONE
Owner: INTERNATIONAL CARPET OF FLORIDA LLC

Address

109 S. SIXTH ST

FLAGLER BEACH, FL 32136

Lot: 0210
Contracted Stated Job Value: ¤500,000.00
Job Description: (NIKZAD PLAZA) RETAIL SHOPS SITE & BLDG SHELL
Type: CN

Contractor

T-CON GROUP, INC.
Status Location Address State License Number Phone
CANCEL

3246 NORTH POWERLINE ROAD

POMPANO BEACH, FL 33069

CBC1251999 (Exp: 08/31/2020) 954-825-8369

Sub Contractors

ISAAC WALTER JOHNSTON
Status Location Address State License Number Phone
ACTIVE

887 BRENTWOOD DRIVE

Daytona Beach, FL 32117

CFC023634 (Exp: 08/31/2026) (386) 252-7047
CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614

Inspection History

Type Request Date Result Inspector
COMMERCIAL BUILDING FINAL 11/28/2011 FINAL APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
COMMERCIAL BUILDING FINAL 11/21/2011 Disapproved - NO FEE CMINI
Note: Inspection Resulted at 11/21/2011 3:21:43 PM BUILDING SHELL OK..WAITING FOR OUTSTANDING INSPECTIONS AND PAPERWORK ON SITE PERMIT.
UTILITY COMMERCIAL FINAL 11/17/2011 APPROVED KKING
UTILITY COMPANY FINAL 11/17/2011 APPROVED KKING
ELECTRICAL FINAL 10/04/2011 APPROVED LHITES
Note: THIS IS A REINSPECTION
FIRE FINAL 10/04/2011 APPROVED LHITES
Note: THIS IS A REINSPECTION
FIRE FINAL 09/06/2011 Disapproved -FEE REQUIRED LHITES
Note: Inspection Resulted at 9/6/2011 11:21:59 AM NEED EXIT SIGN OVER REAR DOOR IN STORAGE AREA
ELECTRICAL FINAL 09/06/2011 Disapproved - NO FEE LHITES
Note: Inspection Resulted at 9/6/2011 11:22:00 AM FEE ON FIRE FINAL. NEED EXIT SIGN INSTALLED
PLUMBING FINAL 09/06/2011 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 9/6/2011 2:54:27 PM PLUMBING ROUGHED IN FOR FUTURE
FOUNDATION SURVEY APPROVED BY ZONING 09/02/2011 APPROVED DRAMIREZ
2ND ROUGH ELECTRICAL 08/05/2011 APPROVED LHITES
Note: THIS IS A REINSPECTION
FIREWALL FINAL INSPECTION 08/05/2011 APPROVED LHITES
COMMERCIAL POWER INSPECTION 07/14/2011 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 7/14/2011 2:31:44 PM FOR POWER ON HOUSE PANEL ONLY..METER CAN #9.CALLED SUSAN FROM FPL FOR POWER RELEASE.
SECOND ROUGH PLUMBING INSPECTION 07/14/2011 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 7/14/2011 2:31:45 PM FRONT OF BUILDING CLEANOUT FOR SANITARY.
COMMERCIAL POWER INSPECTION 07/11/2011 Disapproved -FEE REQUIRED LHITES
Note: ok per Joe MC Inspection Resulted at 7/11/2011 9:40:44 AM 1. HOUSE PANEL IS INCOMPLETE. METER CAN MUST HAVE DISCONNECT BREAKER INSTALLED.
FIREWALL INSPECTION 07/11/2011 APPROVED LHITES
INSULATION INSPECTION 06/20/2011 APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 6/20/2011 1:34:07 PM REMAINDER OF EXTERIOR WALLS.
FRAMING 06/17/2011 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 6/17/2011 2:59:35 PM PARTITION WALL.....OK
STOREFRONT 06/13/2011 APPROVED - AS NOTED DROCKWELL
Note: Inspection Resulted at 6/13/2011 2:38:08 PM WAITED TILL A FEW WERE TIGHTENED.........DR
INSULATION INSPECTION 06/07/2011 PARTIALLY APPROVED DROCKWELL
Note: Inspection Resulted at 6/7/2011 3:01:01 PM INSULATION NORTH AND WEST WALLS....OK
2ND ROUGH ELECTRICAL 05/27/2011 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 5/27/2011 2:36:11 PM NEED REVISION SHOWING SWITCHES TO SOFFIT LIGHTING
ELECTRIC FEEDER 05/27/2011 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 5/27/2011 2:36:10 PM FEEDER PANEL
EXTERIOR WALL SHEATHING/SHEAR WALL 04/28/2011 PARTIALLY APPROVED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 4/28/2011 2:26:41 PM WEST WALL,ALL REAR OF BUILDING,FRONT EXCEPT COLUMNS AND LAST 2 STOREFRONTS
2ND ROUGH ELECTRICAL 04/25/2011 CANCELLED BY APPLICANT RMARVEL
Note: Inspection Resulted at 4/25/2011 2:34:26 PM NOT READY.
EXTERIOR WALL SHEATHING/SHEAR WALL 04/25/2011 PARTIALLY APPROVED DROCKWELL
Note: Inspection Resulted at 4/25/2011 3:02:24 PM BACK NORTH WALL ONLY
EXTERIOR WALL SHEATHING / SHEARWALL 04/20/2011 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 4/20/2011 3:10:31 PM PARTIAL ON DENS GLAS PER REVISION REAR ONLY
FRAMING 04/20/2011 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/20/2011 3:10:32 PM FRONT AND RIGHT SIDE EXTERIOR WALL FRAMING ONLY
FRAMING 02/24/2011 CANCELLED BY APPLICANT CMINI
SIDEWALK 02/24/2011 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/24/2011 1:43:17 PM SIDEWALK AT FRONT ENTRANCES..CHECKED SLOPE
SIDEWALK 02/23/2011 CANCELLED BY APPLICANT JCOLASANTI
PROJECT STATUS INSPECTION 02/23/2011 Disapproved - NO FEE JCOLASANTI
Note: Inspection Resulted at 2/23/2011 3:46:34 PM SILT FENCE VARIOUS PLACES AROUND SITE NEEDS TO BE REPAIRED.
MONOLITHIC SLAB INSPECTION/SLAB 01/31/2011 APPROVED CMINI
FOOTER 01/31/2011 CANCELLED BY APPLICANT CMINI
Note: requested by TOM
TEMPORARY POLE 01/31/2011 APPROVED CMINI
Note: requeste by Tom Inspection Resulted at 1/31/2011 3:27:07 PM CALLED FPL SUSAN AT 3;30 PM.KDS ELEC
UNDERGROUND ELECTRICAL 01/18/2011 PARTIALLY APPROVED CMINI
Note: requested by TOM Inspection Resulted at 1/18/2011 3:27:07 PM UNDERSLAB CONDUIT AND UNDER SIDEWALK CIRCLED ON PLAN.
FIRST ROUGH PLUMBING INSPECTION 01/13/2011 APPROVED RMARVEL
Note: REQUESTED BY TOM

Review History

Department Status Date In Date Out
ZON COMPLETE 11/21/2011 11/21/2011
SW1 COMPLETE 11/21/2011 11/21/2011
UD1 COMPLETE 11/21/2011 11/23/2011
BLD COMPLETE 11/21/2011 11/21/2011
ENGIN1 COMPLETE 11/21/2011 11/21/2011
PLLA COMPLETE 11/03/2011 11/04/2011
Note: Approved as submitted
BLD COMPLETE 10/04/2011 10/04/2011
ZON COMPLETE 10/04/2011 10/04/2011
Note: No zoning review needed.
BLD HOLD 06/03/2011 06/03/2011
Note: Held by J. Hindman 1. The 2 hour wall is required for the occupancy of the building.
BLD COMPLETE 04/13/2011 04/13/2011
Note: Released by JJoseph
BLD COMPLETE 04/13/2011 04/13/2011
Note: Released By: JJOSEPH application specs for densglass and stucco
BLD HOLD 04/04/2011 04/04/2011
Note: Provide fastening schedule for dense glass and provide detailed drawing of the wire lath method.
BLD HOLD 03/29/2011 03/29/2011
Note: Held by J. Hindman 1Provide detailed drawing that shows the components of the wall including all fasteners. The drawing must be suitable for review and inspection of the wall.
BLD COMPLETE 03/23/2011 03/24/2011
BLD COMPLETE 01/28/2011 01/28/2011
Note: Joe M.
MECH COMPLETE 12/16/2010 12/16/2010
Note: Released By: FREODICA Energy calcs
ELEC COMPLETE 12/15/2010 12/15/2010
Note: Released By: LHITES wire size corrected copper label
MECH HOLD 12/14/2010 12/14/2010
Note: Held By: FREODICA correction- hvac not installed at this time letter submittted Correction comment: Energy calculation is still required even if no hvac system is installed at this time. emailed @2:31, 12-14-10
ELEC HOLD 12/13/2010 12/13/2010
Note: Held By: LHITES 1. Conductors and grounding wire sizes are incorrect for HP panel. 2. Please clarify conductor type for TP2 panel so that grounding conductor size can be verified. 3. Load calculations show load for water heaters. Please verity weather or not the heaters are being installed and revise accordingly if not being installed.
UD1 COMPLETE 12/13/2010 12/13/2010
Note: Released By: CJOHNSON Plumbing layout
BLD COMPLETE 12/13/2010 12/14/2010
Note: Released By: JJOSEPH correction - revised occp load calcs
PLUM COMPLETE 12/10/2010 12/13/2010
Note: Released By: FREODICA Correction: a. Sanitary & domestic water rough layout only for the future bathrooms. b. Updated plumbing code edition.
PLUM HOLD 12/09/2010 12/09/2010
Note: Held By: FREODICA 1. Provide sanitary riser diagram complete with vent system and pipe sizes. 2. Provide domestic water riser diagram including location of water heater, hot water system and pipe sizes. 3. Revise Plumbing Code Edition from 2004 to 2007 as shown on Job Note B. emailed @ 12:52, 12-9-10
BLD HOLD 12/09/2010 12/09/2010
Note: Held By: JJOSEPH 1.Revise the oocupant load calculation as per table 1004.1 of FBC 2007/w supplement 2009. 2. Indicate if the building is sprinklered or not.( type IIA or IIB) Faxed and E-mailed at 2:18PM on 12/09/2010
FI1 COMPLETE 10/08/2010 11/28/2011
UD1 HOLD 10/06/2010 10/06/2010
Note: Held By: CJOHNSON Provide plumbing plan. Has it been determined what unit will have food preparation and will utilize the grease interceptor? Any unit proposed to prepare and/or serve food will require an individual grease interceptor installed exterior to the building. Refer to City standards manual for sizing requirements
BLD HOLD 10/04/2010 10/04/2010
Note: Held By: JMCGOWEN coordinate plans and provide plans with detail suitable for review, construction and inspection
ELEC HOLD 10/04/2010 10/04/2010
Note: Held By: JMCGOWEN provide electric riser detail and load calculations
MECH HOLD 10/01/2010 10/01/2010
Note: Held By: FREODICA 1. Provide energy calculations of the proposed shell building. If hvac duct sytem would be done in the future, indicate on plans. Faxed & emailed @ 9:19, 10-1-10
PLUM HOLD 10/01/2010 10/01/2010
Note: Held By: FREODICA 1. Provide plumbing plans suitable for review including but not limited to the following: a. Sanitary layout & riser diagram. b. Domestic water & riser diagram. c. Fixture & piping material specifications. Emailed @ 9:22, 10-1-10
ZON COMPLETE 10/01/2010 10/05/2010
Note: Released By: CBENTLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADDITIONAL FEE ¤40.00 12/01/2011
REINSPECTION FEE ¤40.00 12/01/2011
REINSPECTION FEE ¤40.00 12/01/2011
REINSPECTION FEE ¤40.00 12/01/2011
REVISION ¤40.00 12/01/2011
REVISION ¤40.00 12/01/2011
REVISION ¤40.00 12/01/2011
REVISION ¤40.00 12/01/2011
REVISION ¤40.00 12/01/2011
TRANSPORTATION IMPACT FEE ¤30,539.77 12/01/2011
SITE PLAN 20 ¤20.00 12/17/2010
SURCHARGE FS 533.721 ¤66.98 12/17/2010
SURCHARGE - FS 468.631 ¤66.98 12/17/2010
TRANSPORTATION IMPACT FEE ¤30,539.77 12/17/2010
ADMIN COMMERCIAL ¤60.00 12/17/2010
BUILDING DISCOUNT 100% (¤4,018.50) 12/17/2010
ELECTRIC FEE ¤360.00 12/17/2010
FIRE PLANS REVIEW ¤118.31 12/17/2010
FIRE IMPACT FEE RES 4/1/10 ¤6,239.67 12/17/2010
MECHANICAL FEE ¤360.00 12/17/2010
PERMIT FEE ¤2,750.00 12/17/2010
PLAN CHECK FEE ¤575.00 12/17/2010
PLUMBING FEE ¤360.00 12/17/2010
Fees Total Due: ¤0.00 Total Paid: ¤68,397.98