I want to search for...
Permit #2010100304
Permit Details
Status: COED
| Parcel Id: 39-12-31-0000-04030-0000 |
| Total Square Footage: 200 sqft |
| Block: 04030 |
| Subdivision: - |
| Job Phone: 386-453-0736 |
| Location Address: 511 OLD KINGS RD |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 11/16/2010 |
| NOC: RECORDED |
| Applicant name: GARY LYNN ROBERTS |
| Owner: FLAGLER PALMS CEMETERY LLC |
|
Address 511 OLD KINGS RD S FLAGLER BEACH, FL 32136 |
| Lot: 0000 |
| Contracted Stated Job Value: ¤29,000.00 |
| Job Description: CRAIG FLAGLER PALMS-CREMATORY OVEN AND DUCTWORK |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
7 SUNSHINE BLVD ORMOND BEACH, FL 32174 |
CGC059441 (Exp: 08/31/2026) | 386-238-1570 | 386-238-1571 |
Sub Contractors
MIKE F WHALEY
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
804 Root Street Daytona Beach, FL 32114 |
EC0001334 (Exp: 08/31/2026) | (386) 252-2287 | (386)257-1920 |
VERNON CARROLL MONDAY
| Status | Location Address | State License Number | Phone |
| CANCEL |
530 GRAND STREET ORLANDO, FL 32805 |
CAC010842 (Exp: 08/31/2016) | 386-322-6168 |
DAVID CASH
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
45 SOUTH DIXIE HIGHWAY ST. AUGUSTINE, FL 32084 |
01613 (Exp: 08/31/2014) | (386)437-3433 | 904-829-1844 |
Inspection History
| Type | Request Date | Result | Inspector |
| COMMERCIAL BUILDING FINAL | 01/21/2011 | FINAL APPROVED | RMARVEL |
| UTILITY COMMERCIAL FINAL | 01/21/2011 | APPROVED | DSPENCER |
| UTILITY COMPANY FINAL | 01/21/2011 | APPROVED | DSPENCER |
| FIRE FINAL | 01/21/2011 | APPROVED | LHITES |
| GAS ROUGH | 01/18/2011 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 01/18/2011 | APPROVED | CMINI |
| ABOVE CEILING | 01/12/2011 | APPROVED | RMARVEL |
| 2ND ROUGH ELECTRICAL | 01/12/2011 | APPROVED | RMARVEL |
| ELECTRICAL FINAL | 01/12/2011 | APPROVED | RMARVEL |
| GAS ROUGH | 01/12/2011 | CANCELLED BY APPLICANT | RMARVEL |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/22/2010 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 11/18/2010 | Disapproved -FEE REQUIRED | LHITES |
| Note: 1. Need detail showing installed hooks (size,placement,and attachment) 2. Need revised statement or drawing showing use of WWF or alternate method |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/19/2010 | 11/19/2010 |
| Note: Released By: LHITES Revision- add hook rebar into exisiting slab | |||
| ELEC | COMPLETE | 11/04/2010 | 11/08/2010 |
| Note: Released By: LHITES | |||
| MECH | COMPLETE | 11/03/2010 | 11/04/2010 |
| Note: Released By: FREODICA Propane tank riser diagram & detail w/specs (above ground) (2) M-P.1 clarification w/letter | |||
| FI1 | COMPLETE | 10/21/2010 | 10/28/2010 |
| Note: Released By: LHITES | |||
| UD1 | COMPLETE | 10/20/2010 | 10/20/2010 |
| Note: Released By: CJOHNSON | |||
| ELEC | HOLD | 10/19/2010 | 10/19/2010 |
| Note: Held By: LHITES 1. Please provide complete electrical riser diagram showing panel size and location as well as wire size,type. 2. Please provide complete load calculations. 3. Drawings should show all of existing electric also. | |||
| BLD | COMPLETE | 10/15/2010 | 10/15/2010 |
| Note: Released By: JJOSEPH | |||
| MECH | HOLD | 10/15/2010 | 10/15/2010 |
| Note: Held By: FREODICA 1. Indicate on plan which method of air supply will be used for cremation equipment provided by manufacturer. Is it standard method (sheet 1 of 2) or ducted combustion air method (sheet 2 of 2). If ducted combustion air method would be used, provide duct size. 2. Provide detail or manufacturer's installation instructions for self-propelled turbines on the roof. 3. Crematories shall be listed & labeled in accordance with UL 791 and shall be installed in accordance with the manufacturer's installation instructions per FMC 2007 Section 907. Provide another (1) set of manufacturer's installation instruction. 4. Provide gas sub-contractor and gas riser diagram showing pipe size, material, and all components required. faxed @ 2:09, 10-15-10 | |||
| ZON | COMPLETE | 10/12/2010 | 10/14/2010 |
| Note: Released By: CBENTLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/18/2011 |
| REVISION | ¤40.00 | 01/18/2011 |
| SITE PLAN 20 | ¤20.00 | 11/16/2010 |
| SURCHARGE FS 533.721 | ¤7.77 | 11/16/2010 |
| SURCHARGE - FS 468.631 | ¤7.77 | 11/16/2010 |
| ADMIN COMMERCIAL | ¤60.00 | 11/16/2010 |
| BUILDING DISCOUNT 100% | (¤466.02) | 11/16/2010 |
| ELECTRIC FEE | ¤77.40 | 11/16/2010 |
| FIRE PLANS REVIEW | ¤25.00 | 11/16/2010 |
| MECHANICAL FEE | ¤77.40 | 11/16/2010 |
| PERMIT FEE | ¤203.00 | 11/16/2010 |
| PLAN CHECK FEE | ¤100.00 | 11/16/2010 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤192.32 |