Permit #2010100368

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7064-00010-0140
Block: 00010
Subdivision: 2178 - SECTION 64-LAGUNA FOREST
Job Phone: 386-295-8580
Location Address: 6 LLOBELL PL
Type: DR - DRIVEWAY
Issue Date: 10/25/2010
NOC: RECORDED
Applicant name: ANTHONY J BAUMERT
Owner: DELACRUZ, JOSE ANTONIO & VINCENT C DILELLO

Address

6 LLOBELL PLACE

PALM COAST, FL 32164

Lot: 0140
Contracted Stated Job Value: ¤3,750.00
Job Description: EXCAVATE & PREP NEW SEMI CIRCLE DRIVEWAY W/NEW CULVERT
Type: CN

Contractor

CONSTRUCTION DEVELOPMENT INC
Status Location Address State License Number Phone
CANCEL

PO BOX 351536

PORT ORANGE , FL 32128

CGC1504898 (Exp: 08/31/2018) 386-503-9018

Inspection History

Type Request Date Result Inspector
STORMWATER FINAL INSPECTION 11/30/2010 FINAL APPROVED GLALIMA
Note: THIS IS A REINSPECTION Danny from Construction Development called to schedule this inspection
UTILITY COMPANY FINAL 11/23/2010 APPROVED TSCHWEERS
Note: Danny called to schedule this inspection
APRON FINAL 11/23/2010 APPROVED GLALIMA
Note: Danny called to schedule this inspection
STORMWATER FINAL INSPECTION 11/23/2010 Disapproved - NO FEE GLALIMA
Note: Danny called to schedule this inspection AT TOP OF DRIVEWAY YOU NEED TO REMOVE SOD AND ADD FILL, YOU HAVE THE SOD 2" LOWER THEN THE DRIVE. THIS WILL HOLD WATER . NEED TO PLACE SOD SO WATER RUNS INTO DRIVE "NOT UNDER. CALL FOR SITE MEET IF NEDED. GARY LA LIMA
PRE DRIVEWAY 11/15/2010 APPROVED BCHAMBERLAIN
Note: THIS IS A REINSPECTION Inspection Resulted at 11/15/2010 12:50:47 PM READY TO POUR
PRE DRIVEWAY 10/27/2010 Disapproved -FEE REQUIRED GLALIMA
Note: Lorraine from Construction Development called to schedule this inspection FAILED NEED TO COVER 50% OF CULVERT PIPE "FAILED" CULVERT PIPE IS NOT INSTALLED TO APPOVED SURVEY, NEED TO MOVE PIPE TO RIGHT. SITE MEET IF NEEDED CALL : GARY LALIMA 386-585-0287

Review History

Department Status Date In Date Out
ZON COMPLETE 11/09/2010 11/09/2010
Note: Released By: JGONZALEZ
ENGIN1 COMPLETE 11/04/2010 11/08/2010
Note: Released By: TBAKER
ENGIN1 COMPLETE 11/03/2010 11/08/2010
Note: Released By: TBAKER Held By: TBAKER
SW1 COMPLETE 11/03/2010 11/03/2010
Note: Released By: JJOSEPH
ENGIN1 COMPLETE 11/03/2010 11/08/2010
Note: Released By: TBAKER Held By: TBAKER
ZON HOLD 11/01/2010 11/01/2010
Note: Held By: JGONZALEZ 16' radius driveway 1. Driveway exceeds maximum parking allowed per code parking for single family dewellings. Per Chapter 5 Table 5-4 the a single family residenence is required to have 2 spaces per unit. In chapter 5 section 5.04.02.A4 the maximum parking spaces shall not exceed 1.1 times the minimum required. 2. Provide all dimensions of the driveway including the length and wideth. Site plan excludes the Length of the proposed driveway.
ZON HOLD 10/28/2010 10/28/2010
Note: Held By: JGONZALEZ changed dimensions on driveway 1. Provide the location of the pep tank and setbacks. 2. Driveway exceeds maximum parking allowed per code parking for single family dewellings. By extending driveway 7.5 ft past house and squaring driveway creating additional parking. 3. Provide all dimensions of the driveway including the length and wideth. 4. Providing landingscaping on site plan.
UTL COMPLETE 10/28/2010 11/01/2010
Note: Released By: JHARDING
UTL COMPLETE 10/20/2010 10/21/2010
Note: Released By: TSCHWEERS
SW1 COMPLETE 10/19/2010 10/20/2010
Note: Released By: JJOSEPH
ENGIN1 COMPLETE 10/15/2010 10/19/2010
Note: Released By: SBOMBARDIER
ZON COMPLETE 10/14/2010 10/14/2010
Note: Released By: DRAMIREZ

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 11/15/2010
STORMWATER REINSPECTION FEE ¤35.00 11/15/2010
SITE PLAN 20 ¤20.00 10/25/2010
STORM WATER PERMIT FEES ¤80.00 10/25/2010
BUILDING DISCOUNT 100% (¤18.00) 10/25/2010
PERMIT FEE ¤20.00 10/25/2010
Fees Total Due: ¤0.00 Total Paid: ¤177.00