I want to search for...
Permit #2010100591
Permit Details
Status: COED
| Parcel Id: 06-12-31-5815-00000-0230 |
| Block: 00000 |
| Subdivision: 2118 - Town Center Phase I |
| Job Phone: 386-338-7785 |
| Location Address: 57 TOWN CT |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 11/09/2010 |
| NOC: RECORDED |
| Applicant name: THOMAS M SCAGLIONE |
| Owner: UNION C TRUST LLC |
|
Address 28 ST ANDREWS COURT PALM COAST, FL 32137 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤62,500.00 |
| Job Description: SUITES 2A THRU 2M- COMMERICIAL INTERIOR BUILDOUT "GOD'S FAMILY BIBLE CHURCH" |
| Type: CN |
Contractor
T-CON GROUP, INC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
3246 NORTH POWERLINE ROAD POMPANO BEACH, FL 33069 |
CBC1251999 (Exp: 08/31/2020) | 954-825-8369 |
Sub Contractors
WILLIAM M MCGILL III
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
66 WOODSIDE DRIVE PALM COAST, FL 32164 |
EC13003476 (Exp: 08/31/2018) | 386-931-6969 | 386-447-6969 |
MICHAEL ALLEN PHILLIPS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 478 BUNNELL, FL 32110 |
CAC1814966 (Exp: 08/31/2014) | 386-262-6034 | 866-369-7390 |
JOHN CHARLES GRAY
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2707 ANNETTE STREET FLAGLER BEACH, FL 32136 |
CFC1425975 (Exp: 08/31/2026) | (386)793-3690 | (386)439-7585 |
Inspection History
| Type | Request Date | Result | Inspector |
| FIRST ROUGH PLUMBING INSPECTION | 05/25/2011 | APPROVED | RMARVEL |
| HVAC ROUGH | 05/25/2011 | APPROVED | RMARVEL |
| HVAC FINAL | 05/25/2011 | APPROVED | RMARVEL |
| ALL ROUGH | 05/25/2011 | APPROVED | RMARVEL |
| ABOVE CEILING | 05/25/2011 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION requested by contractor | |||
| FIREWALL FINAL INSPECTION | 05/25/2011 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| COMMERCIAL BUILDING FINAL | 05/25/2011 | FINAL APPROVED | RMARVEL |
| Note: requested by contractor | |||
| FIREWALL INSPECTION | 05/25/2011 | APPROVED | LHITES |
| FIRE FINAL | 05/25/2011 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| FIRE FINAL | 05/10/2011 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: 1. provide a full set of plans. 2. the exit lights are not all working. 3. the sprinkler escutcheon plates are not all installed. 4. seal off the empty box in the rated wall outside of the sanctuary. | |||
| FIREWALL FINAL INSPECTION | 05/10/2011 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: the doors in the rated walls do not match the plans. | |||
| UTILITY COMMERCIAL FINAL | 05/05/2011 | APPROVED | DSPENCER |
| UTILITY COMPANY FINAL | 05/05/2011 | APPROVED | DSPENCER |
| PLUMBING FINAL | 05/05/2011 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. FINAL | 05/04/2011 | APPROVED | RMARVEL |
| PLUMBING FINAL | 04/28/2011 | PARTIALLY APPROVED | RMARVEL |
| Note: Inspection Resulted at 4/28/2011 12:42:18 PM BATHROOMS. | |||
| 2ND ROUGH ELECTRICAL | 04/15/2011 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| COMMERCIAL POWER INSPECTION | 04/01/2011 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 4/1/2011 11:37:55 AM CALLED FPL. 9:37 | |||
| SECOND ROUGH PLUMBING INSPECTION | 02/24/2011 | APPROVED | RMARVEL |
| 2ND ROUGH ELECTRICAL | 02/23/2011 | PARTIALLY APPROVED | RMARVEL |
| Note: Inspection Resulted at 2/23/2011 3:36:21 PM WALLS AND HALLWAY CEILINGS. | |||
| FRAMING | 02/23/2011 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| ABOVE CEILING | 02/23/2011 | PARTIALLY APPROVED | RMARVEL |
| Note: Inspection Resulted at 2/23/2011 3:36:21 PM HALLWAYS ONLY | |||
| 2ND ROUGH ELECTRICAL | 02/22/2011 | APPROVED | RMARVEL |
| Note: Inspection Resulted at 2/22/2011 3:06:42 PM HALLWAY ONLY | |||
| FRAMING | 12/27/2010 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION Inspection Resulted at 12/27/2010 10:15:55 AM the raised platform in the sound booth is not on the plans. (need detail). The sound booth door has been relocated. The drywall underneath and behind the sound booth platform needs to be taped and finished on the rated walls. | |||
| ALL ROUGH | 12/27/2010 | CANCELLED BY APPLICANT | AIRS WEB |
| FRAMING | 11/23/2010 | CANCELLED BY APPLICANT | CMINI |
| INSULATION INSPECTION | 11/15/2010 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 11/15/2010 3:32:12 PM OUTER WALLS |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 05/17/2011 | 05/17/2011 |
| BLD | COMPLETE | 05/16/2011 | 05/16/2011 |
| Note: released by J. Hindman | |||
| FI1 | COMPLETE | 05/16/2011 | 05/16/2011 |
| Note: all ready stamped revison by J Hindman | |||
| FI1 | COMPLETE | 02/17/2011 | 02/21/2011 |
| ELEC | COMPLETE | 02/17/2011 | 02/21/2011 |
| FI1 | HOLD | 02/10/2011 | 02/10/2011 |
| Note: 1. Provide manufacturers detail for doors with fire damper. | |||
| BLD | COMPLETE | 02/09/2011 | 02/10/2011 |
| Note: no building review required for this revision. egress doors will need a revision to be reviewed by fire | |||
| ELEC | HOLD | 02/09/2011 | 02/10/2011 |
| Note: 1. Provide new electrical riser diagram for service. | |||
| MECH | COMPLETE | 02/09/2011 | 02/10/2011 |
| Note: the fire dampers will need to be reviewed by fire | |||
| BLD | COMPLETE | 12/10/2010 | 12/10/2010 |
| Note: Released By: LHITES | |||
| FD1 | COMPLETE | 12/09/2010 | 12/10/2010 |
| Note: Released By: LHITES REVISED FIRE PROTECTION IN HALLWAY CERTIFICATE OF FIRE | |||
| BLD | HOLD | 12/02/2010 | 12/02/2010 |
| Note: Held By: LHITES changing the corridor to be non fire rated wall Per Florida building code 2007 with 2009 supplyments footnote C no longer applies to assembly structures. | |||
| FD1 | HOLD | 12/02/2010 | 12/02/2010 |
| Note: Held By: LHITES correction to the revision - code analysis for fire partion wall Per Florida building code 2007 with 2009 supplyments footnote C no longer applies to assembly structures. | |||
| FD1 | HOLD | 11/17/2010 | 11/18/2010 |
| Note: Held By: JJOSEPH/ LHITES To our knowledge the automatic sprinkler system at this site is not supervised , therefore foot note "c" does not apply. Faxed and emailed at 8:30AM on 11/18/2010 | |||
| UD1 | COMPLETE | 11/09/2010 | 11/09/2010 |
| Note: Released By: CJOHNSON Letter requested by Chris Johnson | |||
| MECH | COMPLETE | 11/09/2010 | 11/09/2010 |
| Note: Released By: FREODICA correction- energy calcs, located dampers, shortened flex runs | |||
| BLD | COMPLETE | 11/05/2010 | 11/05/2010 |
| Note: Released By: JJOSEPH modification on mechanical | |||
| MECH | HOLD | 11/05/2010 | 11/05/2010 |
| Note: Held By: FREODICA Previous comments dated 11-2-10 need to be addressed as follows: Item 1. Provide revised energy calculations. Item 3. Provide dampers & grilles penetrating rated walls. Comment: Location of dampers shall be indicated on plan. Item 7: Provide insatallation details of equipments & duct supports. Comment: Details submitted do not indicate sizes of hanger rods or straps. Additional Comment due to changes of design layout: 1. RTU-3 & RTU-4: The total distributed supply air in CFM's do not match with the capacity (3000 CFM) of the units. emailed @ 1:16, 11-5-10 | |||
| FI1 | COMPLETE | 11/05/2010 | 11/08/2010 |
| Note: Released By: LHITES modification on firewall | |||
| UD1 | HOLD | 11/03/2010 | 11/03/2010 |
| Note: Held By: CJOHNSON Will any food preparation be proposed? Please provide information on what will the 2 compartment sink be used for. Any food preparation in the kitchen or bar area will require a 750 gallon grease interceptor. Contact Utility Department 986-2384 | |||
| BLD | HOLD | 11/02/2010 | 11/02/2010 |
| Note: Held By: JJOSEPH 1.The floor plan does not match the life safety plan about the door into the corridor; please revise and make correction. 2. The occupant load is still not correct. Need to show the fixed seating or use the table 1004.1.1 of FBC 2007/ supplement 2009. 3. The corridor needs to be fire rated as per table 1017.1 of FBC 2007/ supplement 2009. 4. The horizontal sliding door needs to comply as per section 1008.1.3.3 of FBC 2007 /supplement 2009 Faxed and Emailed at 12:42PM on 11/02/2010 | |||
| PLUM | COMPLETE | 11/02/2010 | 11/02/2010 |
| Note: Released By: FREODICA | |||
| MECH | HOLD | 11/02/2010 | 11/02/2010 |
| Note: Held By: FREODICA 1. Provide revised energy calculations. 2. Flexible air connectors are limited to maximum of 14 ft per FMC 2007 Section 603.5.2.1. 3. Provide dampers for ducts & grilles penetrating rated walls. Provide details. 4. Provide hvac equipments specifications. 5. Provide information on how condensate from all roof top units (RTU's) would be discharged. 6. Provide fresh air intake duct layout, CFM's, duct size for AHU-1. 7. Provide installation details of equipments, & duct supports. emailed@1:17, 11-2-10 -contractor emailed @ 1:57, 11-2-10- Pastor (Abolajiakinbo@gmail.com) per his request. | |||
| ELEC | COMPLETE | 11/02/2010 | 11/02/2010 |
| Note: Released By: LHITES | |||
| FI1 | HOLD | 11/02/2010 | 11/02/2010 |
| Note: Held By: LHITES 1. Need existing sprinkler layout to determine clearance and need of additional sprinkler heads. 2. Need alarm system layout to determine if additional horns and or strobes and emergency pulls are needed. 3. Add exit combo light at door outside of conference room. 4. Exit signs needed over doors at food pantry, maintenance office, and music studio doors. | |||
| FI1 | HOLD | 10/28/2010 | 10/28/2010 |
| Note: Held By: LHITES Plans do not show means of egress distances. Need height and area of raised platform to determine FBC sections 410.4 and 410.6. Also need ramp detail. | |||
| UD1 | HOLD | 10/28/2010 | 11/01/2010 |
| Note: Held By: CJOHNSON Will any food preparation be proposed? Please provide information on what will the 2 compartment sink be used for. Any food preparation in the kitchen or bar area will require a 750 gallon grease interceptor. | |||
| MECH | HOLD | 10/26/2010 | 10/26/2010 |
| Note: Held By: FREODICA 1. Revise energy calculations to match the number of units to be used. Please note that hot water heater is indicated to be 50 gallons but per contractor insta-hot would be used. Please coordinate & revise. 2. Revised set of HVAC plans will be submitted per contractor. | |||
| PLUM | HOLD | 10/26/2010 | 10/26/2010 |
| Note: Held By: FREODICA 1. Revise occupant load calculation based on assembly occupancy to determine the required number of plumbing fixtures per FPC 2007 Table 403.1. 2. Provide hot water layout and riser diagram. | |||
| BLD | HOLD | 10/26/2010 | 10/26/2010 |
| Note: Held By: JJOSEPH 1.Provide fire wall Penetration details including the UL number. 2.The occupancy classification submitted should be A-3, please revise and redesign accodingly., Precise the type of construction if it's IIIA or IIIB. 3.Provide a life safety plan including measurements, travel distance, egress width per table 1005.1 4.Provide platform risers and guardrails details. 5.Any door swings in a means of egress shall leave unobstructed at least one half of the required width of corridor (section 1008.1.8.8 of FBC 2007) | |||
| ELEC | HOLD | 10/26/2010 | 10/28/2010 |
| Note: Held By: LHITES 1.Sheet E-2- Load calculations are incorrect. 2. circuit P1-15 is doubled 3. circuit P4-13 is doubled 4. circuit P4-14 is tripled 5. circuit P4-15 is doubled 6. circuit P4-16 is doubled 7. circuit P4-18 is shown as an outlet yet panel schedule shows it as HWH 8. Load calculation for panel 3 and 4 does not show load for subpanel. | |||
| ZON | COMPLETE | 10/25/2010 | 10/26/2010 |
| Note: Released By: JGONZALEZ Meets required parking and no differnce in impact fee. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/25/2011 |
| REINSPECTION FEE | ¤40.00 | 05/25/2011 |
| REINSPECTION FEE | ¤40.00 | 05/25/2011 |
| REVISION | ¤40.00 | 05/25/2011 |
| REVISION | ¤40.00 | 05/25/2011 |
| REVISION | ¤40.00 | 05/25/2011 |
| REVISION | ¤40.00 | 05/25/2011 |
| SITE PLAN 20 | ¤20.00 | 11/09/2010 |
| SURCHARGE FS 533.721 | ¤13.35 | 11/09/2010 |
| SURCHARGE - FS 468.631 | ¤13.35 | 11/09/2010 |
| ADMIN COMMERCIAL | ¤60.00 | 11/09/2010 |
| BUILDING DISCOUNT 100% | (¤801.00) | 11/09/2010 |
| ELECTRIC FEE | ¤97.50 | 11/09/2010 |
| FIRE PLANS REVIEW | ¤25.00 | 11/09/2010 |
| MECHANICAL FEE | ¤97.50 | 11/09/2010 |
| PERMIT FEE | ¤437.50 | 11/09/2010 |
| PLAN CHECK FEE | ¤100.00 | 11/09/2010 |
| PLUMBING FEE | ¤97.50 | 11/09/2010 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤440.70 |