I want to search for...
Permit #2011040126
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7025-000G0-0190 |
| Block: 000G0 |
| Subdivision: 1228 - SOUTHWEST QUADRANT |
| Job Phone: 386-274-3120 |
| Location Address: 1000 PALM COAST PKWY SW |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 04/29/2011 |
| NOC: Unknown |
| Applicant name: RICKY JOE ABERCROMBIE |
| Owner: PALM COAST PROPERTIES LLC & |
|
Address GERALD C NIELSEN & CAMBRA DEVELOPMENT LP BRIGHTON, FL 34211 |
|
Address 1767 LAKEWOOD RANCH BLVD # 292 BRIGHTON, FL 34211 |
| Lot: 19 |
| Contracted Stated Job Value: ¤10,000.00 |
| Job Description: MODIFICATION TO EXISITING ROOF DRAIN COLLECTOR SYSTEM |
| Type: CN |
Contractor
TOMOKA CONSTRUCTION SERVICES, INC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
810 FENTRESS CT DAYTONA BEACH, FL 32117 |
CUC1224170 (Exp: 08/31/2022) | 386-274-3120 | 386-274-3170 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL INSPECTION | 05/19/2011 | FINAL APPROVED | RMARVEL |
| Note: unable to 99 due to outstanding compaction inspection. | |||
| FINAL DRAINAGE | 05/10/2011 | APPROVED | JCOLASANTI |
| STRUCTURE / PIPE ATTACHMENT | 05/10/2011 | APPROVED | JCOLASANTI |
| FINAL GRADE PRIOR TO SOD | 05/06/2011 | APPROVED | LFITZGERALD |
| Note: Inspection Resulted at 5/6/2011 3:09:28 PM NOTE: APPROVED PLANS ELEVATED THE FINAL SOIL GRADE OVER NEW INSTALLED PIPES AND AS SUCH:SOME AREAS HAVE THE SOD HIGHER THEN THE EDGE OF CONCRETE LANDINGS AND THE FINAL GRADE OF THE SOD ALONG THE BACK OF THE PROPERTY IS SLIGHTLY HIGH BACK TO FRONT(ABOUT 4:1 SLOPE FOR ABOUT 4FEET) AND WATER MIGHT PUDDLE AT THE A/C PADS IF HEAVY RAINS PERSIST. THE ONLY WATER WILL BE FOR WHAT EVER FALLS ON THIS SOD. ALSO,WHILE INSPECTING DURING A HEAVY RAIN TODAY,OBSERVED ALL NEW OUTFALLS OPERATING CORRECTLY FOR THE ROOF DRAINAGE; Also-Mike with Tomoka called at 11 am to tell me he was almost done laying the sod and when i was visiting site for the inspection which i replied that the inspection was scheduled for today and should be inspected prior to the sod placement , told him i would visit after i was finished with current inspection | |||
| EROSION CONTROL / INLET PROTECTION/SILT FENCE | 05/05/2011 | APPROVED | CMINI |
| DRAINAGE PIPE PLACEMENT | 05/05/2011 | APPROVED | CMINI |
| PRE-CONSTRUCTION -CALL 986-3736 | 05/03/2011 | APPROVED - AS NOTED | CMINI |
| Note: requested by contractor Inspection Resulted at 5/3/2011 3:04:49 PM MET WITH CONTRACTOR BUDDY ON SITE WENT OVER INSPECTION LIST |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/15/2011 | 04/15/2011 |
| SW1 | COMPLETE | 04/15/2011 | 04/25/2011 |
| Note: Released by JJoseph | |||
| UD1 | COMPLETE | 04/05/2011 | 04/06/2011 |
| ZON | COMPLETE | 04/05/2011 | 04/06/2011 |
| DSD | COMPLETE | 04/05/2011 | 04/06/2011 |
| ENGIN1 | COMPLETE | 04/05/2011 | 04/05/2011 |
| SW1 | COMPLETE | 04/05/2011 | 04/11/2011 |
| Note: Released by JJoseph | |||
| BLD | HOLD | 04/05/2011 | 04/05/2011 |
| Note: Held by J. Hindman 1. Provide dimension of concrete cover at cut section B-B. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PERMIT FEE | ¤445.00 | 04/29/2011 |
| REVISION | ¤40.00 | 04/29/2011 |
| SITE PLAN 20 | ¤20.00 | 04/29/2011 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤505.00 |