I want to search for...
Permit #2011070356
Permit Details
Status: COED
| Parcel Id: 10-11-30-0000-01030-0010 |
| Total Square Footage: 3102 sqft |
| Block: 01030 |
| Subdivision: 2262 - PALM COAST INDUSTRIAL PARK |
| Job Phone: 386-986-9350 |
| Location Address: 18 HARGROVE GRADE |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 08/04/2011 |
| NOC: RECORDED |
| Applicant name: GLENN ALAN BEAULIEU |
| Owner: PREMIER PROP OF PALM COAST |
|
Address P O BOX 402847 MIAMI BEACH, FL 33140 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤61,500.00 |
| Job Description: UNIT #106 (NATURE FOOD 2010 COMPANY) REMODEL FOR CHOCOLATE FACTORY |
| Type: CN |
Contractor
PALM COAST RESIDENTIAL SERVICES INC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
24 FIRETHORN LANE PALM COAST , FL 32137 |
CBC1255562 (Exp: 08/31/2026) | 386-986-9350 | 386-313-1897 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
55 BARRISTER LN PALM COAST, FL 32137 |
ER13013466 (Exp: 08/31/2014) | 386-586-9144 | (386)246-6305 |
JAMES KUYKENDALL
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2550 US 1 NORTH SUITE 3 BUNNELL, FL 32110 |
CAC1815546 (Exp: 08/31/2022) | (386)437-2929 | (386)437-2942 |
KENNETH FISHER
| Status | Location Address | State License Number | Phone |
| INACTIVE |
8 HICKORY LANE Bunnell, 32110 |
RF0044278 (Exp: 08/30/2027) | (386) 439-8766 |
Inspection History
| Type | Request Date | Result | Inspector |
| HVAC FINAL | 12/02/2011 | APPROVED | LHITES |
| BUILDING FINAL | 12/02/2011 | FINAL APPROVED | LHITES |
| FIREWALL FINAL | 12/02/2011 | APPROVED | LHITES |
| FIRE FINAL | 12/02/2011 | APPROVED | LHITES |
| U - UTILITY COMMERCIAL FINAL | 12/01/2011 | APPROVED | KKING |
| COMMERCIAL POWER INSPECTION | 12/01/2011 | APPROVED | LHITES |
| ELECTRIC FINAL | 12/01/2011 | APPROVED | LHITES |
| PLUMBING FINAL | 12/01/2011 | APPROVED | LHITES |
| HVAC ROUGH | 12/01/2011 | APPROVED | LHITES |
| FIREWALL | 11/15/2011 | APPROVED | LHITES |
| ABOVE CEILING | 11/15/2011 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| ABOVE CEILING | 11/01/2011 | PARTIALLY APPROVED | LHITES |
| Note: REQUESTED BY CONTRACTOR | |||
| INSULATION | 09/14/2011 | APPROVED - AS NOTED | CMINI |
| Note: Inspection Resulted at 9/14/2011 3:20:25 PM INSULATION IN WALLS ONLY.WILL CHECK CEILING INSULATION ON FINAL. | |||
| PLUMBING 2ND ROUGH | 09/07/2011 | APPROVED | CMINI |
| FRAMING | 09/07/2011 | APPROVED | CMINI |
| ELECTRIC 2ND ROUGH | 09/07/2011 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH | 08/26/2011 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 11/21/2011 | 11/21/2011 |
| BLD | COMPLETE | 11/21/2011 | 11/21/2011 |
| BLD | COMPLETE | 08/17/2011 | 08/17/2011 |
| PLUM | COMPLETE | 08/17/2011 | 08/18/2011 |
| PLUM | COMPLETE | 08/02/2011 | 08/02/2011 |
| FI1 | COMPLETE | 08/02/2011 | 08/02/2011 |
| MECH | COMPLETE | 08/02/2011 | 08/02/2011 |
| Note: Released By: JMCGOWEN | |||
| UD1 | COMPLETE | 07/29/2011 | 07/29/2011 |
| Note: Released By: CJOHNSON | |||
| ZON | COMPLETE | 07/18/2011 | 07/18/2011 |
| SW1 | COMPLETE | 07/18/2011 | 07/18/2011 |
| Note: No ESWD Review Required. | |||
| UD1 | HOLD | 07/18/2011 | 07/21/2011 |
| Note: Provide the chocolate making process, quantities of product being produced. All drains, sinks and mop basins in Prep Room and Coating Room shall be plumbed to a grease line and grease interceptor. Contact Utility Department with information to determine the size grease interceptor tha will be required. Include the City of Palm Coast grease interceptor detail and notes on plans | |||
| PLUM | HOLD | 07/18/2011 | 07/18/2011 |
| Note: Provide water fountain location , provide vet between the last and second from the last floor drains, any interceptor requirements will be per utility department | |||
| BLD | COMPLETE | 07/18/2011 | 07/18/2011 |
| ELEC | COMPLETE | 07/18/2011 | 07/18/2011 |
| FI1 | HOLD | 07/18/2011 | 07/18/2011 |
| Note: Held by J. Hindman 1. provide MSDS sheets for the cleaning chemicals being stored in the storage cabinet and the type of cabinet used to store them. 2. provide the manufacturers specifications for the heat producing appliances. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 11/30/2011 |
| REVISION | ¤60.00 | 08/19/2011 |
| SITE PLAN 20 | ¤20.00 | 08/04/2011 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/04/2011 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/04/2011 |
| ADMIN COMMERCIAL | ¤60.00 | 08/04/2011 |
| BUILDING DISCOUNT 100% | (¤793.08) | 08/04/2011 |
| ELECTRIC FEE | ¤96.90 | 08/04/2011 |
| FIRE PLANS REVIEW | ¤31.02 | 08/04/2011 |
| MECHANICAL FEE | ¤96.90 | 08/04/2011 |
| PERMIT FEE | ¤430.50 | 08/04/2011 |
| PLAN CHECK FEE | ¤100.00 | 08/04/2011 |
| PLUMBING FEE | ¤96.90 | 08/04/2011 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤243.14 |