I want to search for...
Permit #2011080630
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-5340-00000-0030 |
| ENCLOSE EXISTING PORCH TO LIVING : 147 sqft |
| Total Square Footage: 147 sqft |
| Block: 00000 |
| Subdivision: 1176 - SAVANNAH SQUARE |
| Job Phone: 386-447-1402 |
| Location Address: 6 CHATHAM PL |
| Type: BA - BUILDING ADDITION |
| Issue Date: 09/09/2011 |
| NOC: RECORDED |
| Applicant name: RONALD ERIC PHILLIPS |
| Owner: KELLY CAROL ANN |
|
Address 6 CHATHAM PL PALM COAST, FL 32164 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤9,800.00 |
| Job Description: CONVERT EXISTING PORCH INTO LIVING SPACE |
| Type: CN |
Contractor
PHILLIPS COASTAL CONSTRUCTION, INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
58 BUTTERFIELD DRIVE PALM COAST, FL 32137 |
CGC1506412 (Exp: 08/31/2024) | 386-447-1402 |
Sub Contractors
WINFRED LAWRENCE DILL JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
73 WENTWORTH LANE PALM COAST, FL 32164 |
EC13002502 (Exp: 08/31/2014) | (386)447-9360 | (386)447-8704 |
THOMAS ALAN MOSE
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1894 HOLLY HILL, FL 32117 |
CAC048082 (Exp: 08/31/2026) | 386-255-4545 | (386)252-4979 |
Inspection History
| Type | Request Date | Result | Inspector |
| INSULATION | 11/02/2011 | APPROVED | LHITES |
| BLD - BUILDING FINAL | 11/02/2011 | APPROVED | LHITES |
| Note: Inspection Resulted at 11/2/2011 11:09:33 AM COULD NOT 99 HAS OUTSTANDING INSPECTIONS | |||
| ROW DAMAGE | 11/02/2011 | FINAL APPROVED | GLALIMA |
| U -UTILITY RESIDENTIAL FINAL | 11/02/2011 | APPROVED | TSCHWEERS |
| ALL ROUGH | 09/29/2011 | APPROVED | LHITES |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/22/2011 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/15/2011 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 09/07/2011 | 09/08/2011 |
| BLD | COMPLETE | 09/07/2011 | 09/08/2011 |
| Note: released by J. Hindman | |||
| ZON | HOLD | 08/29/2011 | 08/29/2011 |
| Note: 1. Provide a site plan showing location and dimension of the proposed addition 2. Provide a color sheet or add to plans that addition is to match existing. | |||
| PLUM | COMPLETE | 08/29/2011 | 08/29/2011 |
| SW1 | COMPLETE | 08/29/2011 | 08/29/2011 |
| Note: Released by JJoseph | |||
| ELEC | COMPLETE | 08/29/2011 | 08/29/2011 |
| MECH | COMPLETE | 08/29/2011 | 08/29/2011 |
| BLD | HOLD | 08/29/2011 | 08/29/2011 |
| Note: Held by J. Hindman 1. provide a complete detail for the framing above the openings |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| BUILDING DISCOUNT 100% | (¤208.80) | 09/09/2011 |
| ELECTRIC FEE | ¤66.00 | 09/09/2011 |
| MECHANICAL FEE | ¤66.00 | 09/09/2011 |
| PERMIT FEE | ¤100.00 | 09/09/2011 |
| PLAN CHECK FEE | ¤40.00 | 09/09/2011 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 09/09/2011 |
| SITE PLAN 20 | ¤20.00 | 09/09/2011 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/09/2011 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/09/2011 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤127.20 |