Permit #2011100554
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7021-00190-0080 |
| SCREEN PORCH (SOLID ROOF) : 288 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 118 sqft |
| Total Square Footage: 406 sqft |
| Block: 00190 |
| Subdivision: 2186 - SECTION 21-WYNNFIELD |
| Job Phone: (386)437-1508 |
| Location Address: 17 WELLSTONE DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 11/18/2011 |
| NOC: RECORDED |
| Applicant name: TAMMI SUE MARQUIS |
| Owner: WALLIS ROBERT N & BRENDA S H&W |
|
Address 17 WELLSTONE DR PALM COAST, FL 32164 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤11,439.00 |
| Job Description: 12 X 9.8 BUILDING ADDITION& SCREEN ROOM12 X 24 |
| Type: CN |
Contractor
J & M CARPENTRY OF BUNNELL, INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 1092 BUNNELL, FL 32110 |
CRC1326418 (Exp: 08/31/2016) | (386)437-1508 | 386-437-9769 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P. O. Box 1963 Bunnell, FL 32110 |
ET11000823 (Exp: 09/09/2016) | (386) 437-0607 | (386)437-1847 |
Inspection History
| Type | Request Date | Result | Inspector |
| FIRST ROUGH PLUMBING INSPECTION | 12/22/2011 | APPROVED | LHITES |
| Note: Inspection Resulted at 12/22/2011 3:13:17 PM NO PLUMBING | |||
| BLD - BUILDING FINAL | 12/22/2011 | FINAL APPROVED | LHITES |
| Note: Inspection Resulted at 12/22/2011 3:13:17 PM NEED FINAL SURVEY FROM CITY ON JOB SITE. | |||
| ROW DAMAGE | 12/22/2011 | APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 12/22/2011 | APPROVED | KKING |
| INSULATION | 12/12/2011 | APPROVED | CMINI |
| Note: requested by contractor | |||
| LATH/BRICK/ WATER BARRIER | 12/09/2011 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 12/09/2011 | APPROVED | JHINDMAN |
| FINAL SURVEY (OFFICE USE ONLY) | 12/09/2011 | APPROVED | JHINDMAN |
| ALL ROUGH | 12/06/2011 | APPROVED | LHITES |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/05/2011 | APPROVED | CMINI |
| MONOLITHIC SLAB | 11/23/2011 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/09/2011 | 12/09/2011 |
| Note: Released By: JHINDMAN foundation survey | |||
| ZON | COMPLETE | 12/09/2011 | 12/09/2011 |
| Note: Released By: JHINDMAN foundation survey | |||
| ELEC | COMPLETE | 11/18/2011 | 11/18/2011 |
| ELEC | HOLD | 11/17/2011 | 11/17/2011 |
| Note: Provide electric contractor doing the work | |||
| BLD | COMPLETE | 11/17/2011 | 11/17/2011 |
| BLD | HOLD | 11/15/2011 | 11/15/2011 |
| Note: If you wish to eliminate the screened in portion of the job, you will need to bring in a stamped drawing without screen enclose detail and remove the screen room detail from site plan | |||
| BLD | HOLD | 11/14/2011 | 11/14/2011 |
| Note: Provide member sizes on screen room | |||
| MECH | COMPLETE | 11/14/2011 | 11/14/2011 |
| MECH | HOLD | 11/10/2011 | 11/14/2011 |
| Note: Masonry wall insulation will be the added insulation, not the combined unit r- value | |||
| ELEC | COMPLETE | 11/10/2011 | 11/14/2011 |
| BLD | HOLD | 11/10/2011 | 11/14/2011 |
| Note: The whole project must be from the same Engineers | |||
| ZON | COMPLETE | 11/03/2011 | 11/07/2011 |
| MECH | HOLD | 11/03/2011 | 11/03/2011 |
| Note: Provide energy calculations | |||
| ELEC | HOLD | 11/03/2011 | 11/03/2011 |
| Note: Provide a light outside of the new rooms door or show if existing. | |||
| BLD | HOLD | 11/03/2011 | 11/03/2011 |
| Note: 1. The screen details provided for this project cannot be from two different Engineers. 2. Is the existing sliding glass door part of a bedroom? If it is provide emergency egress information on it. | |||
| SW1 | COMPLETE | 11/03/2011 | 11/03/2011 |
| BLD | HOLD | 11/03/2011 | 11/03/2011 |
| Note: Held by J. Hindman 1. Provide the product approval for the new exterior door. 2. Is the sliding glass door part of an existing bedroom ? If it is provide emergency egress information for it. 3. Provide an angle clip installation detail. 4. Provide a detail for the atachment of the Elite panel to the screen wall. | |||
| SW1 | HOLD | 11/03/2011 | 11/03/2011 |
| Note: Held by J. Hindman 1. provide a site plan for review. | |||
| ZON | HOLD | 11/03/2011 | 11/03/2011 |
| Note: Provide a site plan showing all setbacks and dimensions of the proposed work being performed. | |||
| PLUM | COMPLETE | 11/03/2011 | 11/03/2011 |
| BLD | HOLD | 11/03/2011 | 11/03/2011 |
| Note: Held by J. Hindman 1. Provide a site plan. 2. Provide the product approval for the new exterior door. 3. Is the sliding glass door for the new room part of a bedroom. If it is provide information for the egress from it. 4. Provide a angle clip attachment detail for the screen. 5 Provide a detail to attach the Elite panel to the screen wall. | |||
| ELEC | HOLD | 11/03/2011 | 11/03/2011 |
| Note: 1. Provide a light outside of the new rooms door. 2. Provide an Electrical subcontractor. | |||
| MECH | HOLD | 11/03/2011 | 11/03/2011 |
| Note: Provide energy calculations provide duct layout and mechanical contractor doing the work |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| BUILDING DISCOUNT 100% | (¤154.26) | 11/18/2011 |
| ELECTRIC FEE | ¤71.40 | 11/18/2011 |
| PERMIT FEE | ¤100.00 | 11/18/2011 |
| PLAN CHECK FEE | ¤40.00 | 11/18/2011 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 11/18/2011 |
| SITE PLAN 20 | ¤20.00 | 11/18/2011 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/18/2011 |
| SURCHARGE - FS 468.631 | ¤2.00 | 11/18/2011 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤121.14 |