Permit #2012010035

Permit Details

Status: FINAL

Parcel Id: 48-11-31-1710-00000-0140
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: (386)445-4747
Location Address: 204 WILLOW OAK WAY
Type: PO - POOL
Issue Date: 01/13/2012
NOC: RECORDED
Applicant name: LAWRENCE PATRICK VANDIVIER
Owner: ARH MODELS LLC

Address

13922 58TH STREET NORTH

CLEARWATER, FL 33760

Lot: 0140
Contracted Stated Job Value: ¤30,000.00
Job Description: POOL W/SPA & TRELLIS, GAS FIREPLACE & ALUMINUM FENCE
Type: CN

Contractor

COUNTRY CLUB POOLS & SPAS
Status Location Address State License Number Phone Fax
INACTIVE

4444 N. OCEANSHORE BLVD

PALM COAST, FL 32137

CPC057239 (Exp: 08/31/2024) (386)445-4747 (386)445-5955

Sub Contractors

STEVEN DUANE DENSLOW
Status Location Address State License Number Phone Fax
ACTIVE

317 RIO PINR DR

Ormond Beach, FL 32174

EC0001678 (Exp: 08/31/2026) 386-233-1553 386-673-5994
KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856
WILLIAM VALENTINE GROFF
Status Location Address State License Number Phone Fax
CANCEL

4440 N OCEANSHORE BLVD SUITE 101

PALM COAST, FL 32137

CBC1256262 (Exp: 08/31/2020) 386-445-4747 386-445-5955

Inspection History

Type Request Date Result Inspector
POOL FINAL 07/17/2012 FINAL APPROVED CMINI
Note: THIS IS A REINSPECTION
POOL FINAL 06/29/2012 Disapproved -FEE REQUIRED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 6/29/2012 2:50:08 PM VIOLATIONS CORRECTED-HOWEVER-CALCULATED TDH IS 39.5 ACTUAL TDH ACCORDING TO GUAGES-IS 34.2..ACTUAL TDH MUST BE EQUQL TO OR HIGHER THAN CALCULATEDTDH.
POOL FINAL 06/06/2012 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 6/6/2012 2:51:05 PM NEED TO VERIFY BURIAL DEPTH FOR GAS LINE.NEED TO HAVE FINAL SURVEY ,NEED TO HAVE POP OFF RELIEF VALVE FOR POOL HEATER.NEED REVISION FOR FOOTER THAT WAS PASS NOTED ON POOL DECK
GAS FINAL 06/06/2012 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 6/6/2012 2:51:05 PM NEED TO VERIFY BURIAL DEPTH AND FINAL SURVEY FOR LOCATION NEEDED CHECK ON POOL FINAL
GAS ROUGH 06/06/2012 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 6/6/2012 2:51:04 PM NEED TO VERIFY BURIAL DEPTH..CHECK ON POOL FINAL
ROW DAMAGE 06/06/2012 APPROVED KHOWELL
Note: I Was Not At Work On June 6, 2012 Kevin Howell
U -UTILITY RESIDENTIAL FINAL 06/06/2012 APPROVED DSPENCER
Note: requested by contractor
ELECTRIC AND ALARM 02/29/2012 APPROVED CMINI
Note: REQUESTED BY CONTRACTOR
FINAL SURVEY (OFFICE USE ONLY) 02/22/2012 APPROVED JHINDMAN
POOL DECK 02/09/2012 APPROVED CMINI
Note: THIS IS A REINSPECTION REQUESTED BY CONTRACTOR
POOL DECK 02/08/2012 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 2/8/2012 11:31:43 AM POOL DECK NOT READY FOR INSPECTION
COLUMN INSPECTION 02/08/2012 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 2/8/2012 11:31:42 AM COLUMNS GOOD STILL WAITING FOR FOOTING DETAIL FOR FIREPLACE
FOOTER 02/02/2012 APPROVED - AS NOTED CMINI
Note: Inspection Resulted at 2/2/2012 1:13:55 PM 4 COLUMN FOOTERS APPROVED NEED DETAIL REVISION FOR FIREPLACE FOOTER.
STEEL AND GROUND 01/26/2012 APPROVED DROCKWELL

Review History

Department Status Date In Date Out
BLD COMPLETE 03/06/2012 03/06/2012
ZON COMPLETE 02/22/2012 02/22/2012
Note: Released By: JHINDMAN final survey
SW1 COMPLETE 02/22/2012 02/22/2012
Note: Released By: JHINDMAN final survey
BLD COMPLETE 01/11/2012 01/11/2012
Note: Released by Freodica
ZON COMPLETE 01/10/2012 01/10/2012
BLD HOLD 01/10/2012 01/10/2012
Note: Held by Freodica Same hold comment for gas.
SW1 COMPLETE 01/10/2012 01/10/2012
Note: Released by JJoseph already reviewed
BLD HOLD 01/10/2012 01/10/2012
Note: Held by Freodica 1. Submitted gas riser diagram shall include gas pipe size, material, load in Btu/hr, source of connection (where it is tied into) and gas contractor license number indicated on plan or company letter head.
ZON HOLD 01/10/2012 01/10/2012
Note: Provide a callout of the location of trellis with height on the site plan. Provide dimensions of the pool on the site plan. Remove pool by others from site plan.
BLD HOLD 01/03/2012 01/03/2012
Note: Provide contractor that is building the structure on pool deck, provide signed and sealed drawings for the fireplace/trellis structure, provide gas riser detail, tank size and location, clarify what slab/footing detail is to be used.
SW1 COMPLETE 01/03/2012 01/04/2012
Note: Released by JJoseph
ZON HOLD 01/03/2012 01/04/2012
Note: 1. Provide Homeowner Association approval letter. 2. On site plan provide the following- a. Type of aluminum fencing to be installed. b. Height of fence. c. Location, dimension and setback of the equipment pad. d. Trellis location with height.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/09/2012
REINSPECTION FEE ¤40.00 06/27/2012
REINSPECTION FEE ¤40.00 03/07/2012
REVISION ¤40.00 03/07/2012
SITE PLAN 20 ¤20.00 01/13/2012
SURCHARGE FS 533.721 ¤2.00 01/13/2012
SURCHARGE - FS 468.631 ¤2.00 01/13/2012
BUILDING DISCOUNT 100% (¤198.00) 01/13/2012
PERMIT FEE ¤260.00 01/13/2012
PLAN CHECK FEE ¤40.00 01/13/2012
Fees Total Due: ¤0.00 Total Paid: ¤286.00