I want to search for...

Permit #2012020415

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7035-00130-0180
Block: 00130
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 386-447-7077
Location Address: 8 BURNING EMBER LN
Type: DR - DRIVEWAY
Issue Date: 03/12/2012
NOC: Unknown
Applicant name: MARK M SCHOFIELD
Owner: SWEENEY JOHN & ANDREA H&W

Address

8 BURNING EMBER LANE

PALM COAST, FL 32137

Lot: 0180
Contracted Stated Job Value: ¤1,150.00
Job Description: ADDITION TO DRIVEWAY
Type: CN

Contractor

STAY HARD CONCRETE LLC
Status Location Address Phone
CANCEL

52 LEE DRIVE

PALM COAST, FL 32137

386-793-1239

Inspection History

Type Request Date Result Inspector
ROW DAMAGE 09/05/2012 FINAL APPROVED KHOWELL
STORMWATER FINAL 03/29/2012 APPROVED GLALIMA
FINAL APRON (AFTER POUR/DRIVEWAY) 03/29/2012 APPROVED GLALIMA
U -UTILITY RESIDENTIAL FINAL 03/29/2012 APPROVED DSPENCER
PRE-APRON (PRE-POUR/DRIVEWAY) 03/23/2012 APPROVED GLALIMA
Note: THIS IS A REINSPECTION Mark called to schedule this inspection
PRE-APRON (PRE-POUR/DRIVEWAY) 03/22/2012 Disapproved -FEE REQUIRED GLALIMA
Note: 5 PHOTOS: NOT FORMED TO SURVEY FROM ZONING FEE NEEDED. CALL BUILDING FOR REINSPECTION 986-3700

Review History

Department Status Date In Date Out
BLD COMPLETE 03/19/2012 03/19/2012
Note: revision to driveway. No vertical structure
SW1 COMPLETE 03/19/2012 03/20/2012
Note: Released by JJoseph
BLD COMPLETE 03/12/2012 03/12/2012
Note: no vertical structure to review
ENGIN1 COMPLETE 03/12/2012 03/19/2012
Note: No work being performed around culvert. No swale plan required.
SW1 COMPLETE 03/12/2012 03/12/2012
Note: Released by JJoseph
UD1 COMPLETE 03/12/2012 03/13/2012
ZON COMPLETE 03/12/2012 03/21/2012
ZON COMPLETE 03/06/2012 03/08/2012
BLD COMPLETE 03/06/2012 03/06/2012
Note: no review required
ENGIN1 COMPLETE 03/06/2012 03/06/2012
Note: No work being performed in Right of Way. No swale plan required.
SW1 COMPLETE 03/06/2012 03/06/2012
Note: Released by JJoseph
UD1 COMPLETE 03/06/2012 03/06/2012
ZON HOLD 02/29/2012 03/02/2012
Note: Provide a new site plan showing the proposed dimensions and setbacks for the driveway addition and walkway to include the length and width.
BLD COMPLETE 02/29/2012 02/29/2012
Note: no review required
ENGIN1 COMPLETE 02/29/2012 02/29/2012
Note: No work being performed in Right of Way. No swale plan required.
SW1 COMPLETE 02/29/2012 02/29/2012
Note: Released by JJoseph
UD1 COMPLETE 02/29/2012 03/01/2012
BLD COMPLETE 02/19/2012 02/20/2012
Note: no vertical structure to review
ENGIN1 COMPLETE 02/19/2012 02/22/2012
Note: No culvert work performed. No swale plan required.
SW1 COMPLETE 02/19/2012 02/20/2012
Note: Released by JJoseph
UD1 COMPLETE 02/19/2012 02/20/2012
ZON HOLD 02/19/2012 02/20/2012
Note: 1. Revise site plan showing driveway connection starting at property at a 45 degree angle or widen apron. Driveway connection cannot be attached to culvert without extending apron. 2. Provide a new site plan showing setbacks and dimension of addition. 3. Remove driveway addition from right side yard setback.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
BUILDING DISCOUNT 100% (¤18.00) 03/12/2012
PERMIT FEE ¤20.00 03/12/2012
SITE PLAN 20 ¤20.00 03/12/2012
SURCHARGE FS 533.721 ¤2.00 03/12/2012
SURCHARGE - FS 468.631 ¤2.00 03/12/2012
STORM WATER PERMIT FEES ¤40.00 03/12/2012
Fees Total Due: ¤0.00 Total Paid: ¤66.00