I want to search for...
Permit #2012020727
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7010-00120-0420 |
| Block: 00120 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-447-7077 |
| Location Address: 1 FITZGERALD LN |
| Type: DR - DRIVEWAY |
| Issue Date: 03/07/2012 |
| NOC: Unknown |
| Applicant name: MARK M SCHOFIELD |
| Owner: ROCHESTER DARREL G |
|
Address 1 FITZGERALD LN PALM COAST, FL 32137 |
| Lot: 0420 |
| Contracted Stated Job Value: ¤1,100.00 |
| Job Description: WIDEN CONCRETE DRIVEWAY |
| Type: CN |
Contractor
STAY HARD CONCRETE LLC
| Status | Location Address | Phone |
| CANCEL |
52 LEE DRIVE PALM COAST, FL 32137 |
386-793-1239 |
Inspection History
| Type | Request Date | Result | Inspector |
| STORMWATER FINAL | 10/10/2012 | APPROVED | GLALIMA |
| FINAL APRON (AFTER POUR/DRIVEWAY) | 10/10/2012 | APPROVED | GLALIMA |
| U -UTILITY RESIDENTIAL FINAL | 10/10/2012 | FINAL APPROVED | DSPENCER |
| ROW DAMAGE | 05/11/2012 | APPROVED | KHOWELL |
| PRE-APRON (PRE-POUR/DRIVEWAY) | 03/14/2012 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 03/13/2012 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: REMOVE ALL SOD , DRIVEWAY IN RIGHT 6" OF CONCRETE ON FIRMLY COMPACTED SUBGRADE OF CLEAN GRANULAR MATERIAL OR 5" OF CONCRETE ON 3" OF LINEROCK OR ROADBASE OF SHELLBASE. 5" OF CONCRETE OVER CULVERT PIPE. 6" AT ROAD OR 5" WITH 6" X 6"WIRE- MESH OF FIBER MESH . FAILED. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/29/2012 | 02/29/2012 |
| Note: no vertical structure | |||
| ENGIN1 | COMPLETE | 02/29/2012 | 03/06/2012 |
| SW1 | COMPLETE | 02/29/2012 | 02/29/2012 |
| Note: Released by JJoseph | |||
| UD1 | COMPLETE | 02/29/2012 | 03/01/2012 |
| ZON | COMPLETE | 02/29/2012 | 03/02/2012 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| BUILDING DISCOUNT 100% | (¤18.00) | 03/07/2012 |
| PERMIT FEE | ¤20.00 | 03/07/2012 |
| SITE PLAN 20 | ¤20.00 | 03/07/2012 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/07/2012 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/07/2012 |
| STORM WATER PERMIT FEES | ¤40.00 | 03/07/2012 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤66.00 |